New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction

Section 106 — CONTROL OF MATERIAL

New Hampshire Standard Specifications for Road & Bridge Construction, Section 106. Full text, cross-references and related pay items on BuildSpec.

SECTION 106 New Hampshire Department of Transportation Standard Specifications – 2016 1-32 SECTION 106 -- CONTROL OF MATERIAL 106.01 Source of Supply and Quality Requirements. All materials used shall meet the requirements of the Contract. In order to expedite the inspection and testing of materials, the Contractor shall notify the Engineer of the proposed sources of materials to be used in the Work before delivery. The Engineer has the option of conditionally approving materials at the supply source. Any material incorporated into the Work that subsequently fails to meet the Contract…

The rest of Section 106 — CONTROL OF MATERIAL is for members

You're reading the opening of Section 106 — CONTROL OF MATERIAL. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 106 — CONTROL OF MATERIAL — free for 14 daysSign in