New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction
Section 306 — RECLAIMED STABILIZED BASE
New Hampshire Standard Specifications for Road & Bridge Construction, Section 306. Full text, cross-references and related pay items on BuildSpec.
SECTION 306 New Hampshire Department of Transportation Standard Specifications – 2016 3-7 SECTION 306 -- RECLAIMED STABILIZED BASE Description 1.1 This work shall consist of scarifying, if necessary, and pulverizing the existing pavement together with a base course material. It may require removal and rehandling and the addition of other materials as shown on the plans or as ordered. Materials 2.1 General. 2.1.1 The material shall consist of the existing pavement blended with the underlying gravel and/or additional stone as required. Reclaimed stabilized base shall have a minimum bitumen…
The rest of Section 306 — RECLAIMED STABILIZED BASE is for members
You're reading the opening of Section 306 — RECLAIMED STABILIZED BASE. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations