New Hampshire Department of Transportation (NHDOT) · Standard Specifications for Road & Bridge Construction

Section 417 — COLD PLANING BITUMINOUS SURFACES

New Hampshire Standard Specifications for Road & Bridge Construction, Section 417. Full text, cross-references and related pay items on BuildSpec.

SECTION 417 New Hampshire Department of Transportation Standard Specifications – 2016 4-38 SECTION 417 -- COLD PLANING BITUMINOUS SURFACES Description 1.1 This work shall consist of the removal of existing bituminous pavement, by planing or milling type equipment, to the depth and grade shown on the plans or ordered. 1.2 This work shall consist of constructing Rumble Strips by making depressions into bituminous pavement to the depth and dimensions shown on the plans and as specified below. 1.2.1 This work shall also consist of removing existing rumble strips and inlaying pavement in the…

The rest of Section 417 — COLD PLANING BITUMINOUS SURFACES is for members

You're reading the opening of Section 417 — COLD PLANING BITUMINOUS SURFACES. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 417 — COLD PLANING BITUMINOUS SURFACES — free for 14 daysSign in