General Provisions (00100-00999)

110Wages and Conditions of Employment

NV · 2014 Standard SpecificationsBook pages 8586View official source ↗

79 SECTION 110

110.01 Description. The provisions pertaining to wages and conditions of employment shall apply to all work

performed (on the contract) by the Contractor with his own organization and with the assistance of workmen under his immediate superintendence, and to all work performed on the contract by subcontractors. Minimum wage rates determined by the Labor Commissioner of the State of Nevada and by the Secretary of Labor, if applicable, are set forth in the contract documents. Do not pay wage rates less than the minimum wage rates. Forfeit, as a penalty to the Department, the amount stipulated in NRS Chapter 338 when workmen are paid less than the minimum wage rate. The laborers shall have access to the pertinent minimum wage schedules at all times. Provide and erect a weatherproof bulletin board at the job site and post all minimum wage schedules and other required information thereon. Construct the weatherproof bulletin board so that the material thereon is adequately protected from the elements. It is a condition of the contract, and shall be made a condition of each subcontract entered into pursuant to the contract, that the Contractor and any subcontractor shall not require any laborer or mechanic employed in performance of the contract to work in surroundings or under working conditions which are unsanitary, hazardous, or dangerous to his health or safety as determined under construction safety and health standards (Title 29, Code of Federal Regulations, Part 1926 —published in the Federal Register on December 16, 1972, and subsequent revisions) promulgated by the United States Secretary of Labor, according to Section 107 of the Contract Work Hours and Safety Standards Act, (83 Stat. 96). The minimum wage rates apply to workmen working upon the “site of the work.” The term “site of the work” is defined as follows: The “site of the work” is defined as the physical place or places where work called for in the contract is performed by either the Contractor o r the Contractor’s agents. Material sources controlled by the Department and staging areas set up to construct portions of the work are considered to be the “site of the work.” Not included in the “site of the work” are permanent home offices, batch plant establishments, fabrication plants, and tool yards of an employer whose locations and continuance in operation are determined without regard to the work. In addition, fabrication plants, batch plants, borrow pits, job headquarters, tool yards, or other like locations of a commercial supplier or materialman which are established by a supplier of materials for the project before opening of bids are not incl uded in the “site of the work.” The Contractor and subcontractors compliance with Title 29, subtitle A, 3.3, Code of Federal Regulations and NRS 338 will be required on this contract. These regulations require submittal of a tally of weekly payroll and statement of compliance with respect to each employee engaged in work on the project. Submit these payrolls and statement of compliance to the Nevada Department of Transportation and the State of Nevada Labor Commissioner. Submit payrolls electronically via the internet into the Department’s contracted payroll tracking system. The system information and access fee will be listed in the Special Provisions. This requirement will apply to every lower-tier subcontractor and vendor required to provide certified payroll reports by NRS 338.010 to 338.090 inclusive. Upon issuance of the Notice to Proceed, the Department will provide the Contractor with the website addresses and a Login Identification and Password to access the payroll system.

110.02 Laws Cited. See the provisions and requirements of the following:

a.Wages, Hours and Employment on Public Works —NRS Chapter 338.
b.Nevada Industrial Insurance Act —NRS Chapter 616A. Furnish a certificate from the insurer as evidence of payment of all the premiums and percentages as required by the act, and furnish said certificate before any work is commenced.
c.Unemployment Compensation Law —NRS Chapter 612. 110 WAGES AND CONDITIONS OF EMPLOYMENT 80 (d) Highway Camp Sanitation —NRS 444.130, 444.200 and 444.210.
e.Highways and Roads Law —NRS Chapter 408.
f.Fair Labor Standards Act of 1938 (52 Stat. 1060).
g.Work Hours Act of 1962.
h.Any and all leg islation, rules or regulations promulgated by the State of Nevada, or its agencies, covering any work performed by the Contractor.
i.Fraudulent and Discriminatory Employment Practices —NRS Chapter 613.

110.03 Training Program. The on -the-job training pr ogram shall apply as set forth in the Training Special

Provisions . Consider the Training Special Provisions as contained herein. The number of trainees to be trained will be as indicated in the Training Special Provisions . METHOD OF MEASUREMENT

110.04 Measurement. Training will be measured by the hour that trainees are employed on the contract.

BASIS OF PAYMENT

110.05 Payment. The accepted quantities of training, measured as specified above , will be paid for at the price

per hour as specified in the T raining Special Provisions and indicated in the Proposal. Payment will be full compensation for the work prescribed in this Section. Payment will be made under: Pay Item Pay Unit Training ................................ ................................ ................................ ................................ ................................ ............................. Hour 81 DIVISION II CONSTRUCTION DETAILS ________ SECTION 200 CONSTRUCTION STAKEOUT DESCRIPTION

200.01.01 General. This work consists of construction stakeout to be performed both by the Department and

the Contractor. Perform the complete stakeout of bridge structures, including the approach slabs and slope paving, and all stakeout necessary to construct bridge structures to completion in accordance with the plans and as directed. The Department will perform all stakeout necessary for the construction of R.C.B.’s. All other stakeout necessary to complete this project will be performed by the Department. Certify that the personnel to perform stakeout work are experienced and fully capable of providing accurate results. On major structures constructed with structural steel girders, obtain tenth point elevations on the erected unloaded girders and supply said elevations to the Engineer prior to installing the deck forms. Furnish the Engineer copies of all field notes and calculations used to complete stakeout requirements. Be responsible for the accuracy of the stakeout work performed. Correct any errors in stakeout and related work involved performed at own expense. METHOD OF MEASUREMENT

200.04.01 Measurement. Construction stakeout will not be measured for payment.

BASIS OF PAYMENT

200.05.01 Payment. There shall be no direct payment for construction stakeout and all work involved shall be

considered included in the various contract bid items of work requiring construction stakeout.

Source: Nevada Standard Specifications for Road and Bridge Construction, 2014 Edition. Pages 8586 of 610.