204-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Cross sectioning, for the purpose of determining quantities for payment, will be employed only where payment lines are not shown on the contract documents or Standard Sheets, and cannot be reasonably established by the Engineer.
204-4.02 Lightweight Concrete Fill. Lightweight Concrete Fill will be measured for payment in cubic
yards measured to the nearest 0.1 cubic yard computed from the payment lines shown on the contract documents.
204-5 Basis of Payment
204-5.01 Controlled Low Strength Material. The unit price bid shall include the costs of all labor,
material, and equipment necessary to satisfactorily complete the work.
204-5.02 Lightweight Concrete Fill. The unit bid price shall include the cost of all labor, materials, and
equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 204.01 Controlled Low Strength Material (CLSM) Cubic Yard 204.02 Controlled Low Strength Material (CLSM) (No Fly Ash) Cubic Yard 204.03 Lightweight Concrete Fill (Type A) Cubic Yard 204.04 Lightweight Concrete Fill (Type B) Cubic Yard SECTION 205 - CONTAMINATED SOIL (Last Revised January 2019)
205-1 Description .
205-1.01 General. Soil contamination may include:
A.Petroleum products, which may include, but are not limited to: gasoline, heating oils, diesel fuel, kerosene, jet fuel, lubricating oils, motor oils, greases, and other fractions of crude oil;
B.Contaminants associated with past Manufactured Coal Gas Plant (MGP) operations;
C.Other contamination by organic constituents including volatile organic compounds;
D.Metal(s) such as lead, chromium, and/or other heavy metals; and/or
E.Any other constituents that require specialty disposal of the soil. Additional information regarding contaminated soil may be available in a Special Note entitled Soil Characterization Information and/or in a Contaminated Materials Assessment Report, if such Special Note and/or Report were prepared by the Department during project design.
205-1.02 Segregation and Storage. This work shall consist of segregating contaminated soil from non -
contaminated soil during excavation, and the temporary storage and management of contaminated soil (pending sampling, analysis and ultimate disposition) in accordance with an accepted Cont aminated Material Handling Plan.
205-1 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-1.03 Field Organic Vapor Monitoring. This work shall consist of screening soil for contamination during excavation using field vapor monitoring equipment and observations. This work shall be performed by an independent firm hired by the Contractor and completed in accordance with an accepted Field Organic Vapor Monitoring Plan.
205-1.04 Sampling and Analysis. This work shall consist of collecting soil samples and arranging for
samples to be analyzed at a laboratory in accordance with an accepted Sampling Plan. The laboratory shall be accredited for the specified parameters by the New York State Department o f Health (NYSDOH) under the Environmental Laboratory Approval Program (ELAP). The results of the laboratory analysis will determine or confirm the final regulatory classification of the soil for appropriate handling, transpo rtation, treatment and disposal methods and requirements.
205-1.05 Transportation and Disposal. This work shall consist of transporting and disposing of
contaminated soil, and completing any other related activities, in accordance with an accepted Disposal Plan. For shipping and disposal purposes, the regulatory classification of the soil (as eithe r contaminated non-hazardous industrial waste or RCRA regulated hazardous waste) will be based on investigations conducted prior to award or based on the results of laboratory analysis included in this section.
205-1.06 Reuse of Contaminated Soil. This work shall consist of the reuse of contaminated soil within
the contract limits as embankment, fill or other appropriate on -site use. Contaminated soil areas and reuse locations, if provided , are indicated in the contract documents or shall be determined and approved by the Department. The reuse of contaminated soil may be deemed appropriate based upon the following a) an investigation conducted prior to the contract award and/or sampling and analysis conducted during project construction and the q ualification of the soil placement as a generic beneficial use determination (BUD) or b) as a site specific BUD obtained from the NYSDEC. The material must be considered suitable material as per Section 203.
205-2 Materials .
205-2.01 General. As per the Contaminated Material Handling Plan, (Section 205 -1.02).
205-2.02 Segregation and Storage. None Specified.
205-2.03 Field Organic Vapor Monitoring. Field organic vapor monitoring shall be conducted using a
photoionization detector (PID) with a 10.2eV or higher ultraviolet lamp. The PID shall have a minimum detection range of 0.1 ppm to 2,000 ppm and shall be calibrated with isobutylene or other appr opriate calibration gas. A flame ionization detector (FID) may be used in lieu of a PID if a written request and justification is submitted by the Contractor and approved by the Department. The FID shall have a minimum detection range of 1.0 ppm to 50,000 ppm and shall be calibrat ed with appropriate calibration gas.
205-2.04 Sampling and Analysis. None Specified.
205-2.05 Transportation and Disposal. None Specified.
205-2.06 Reuse of Contaminated Soil. None Specified.
205-3 Construction Details .
205-3.01 General. Work activities shall be performed in accordance with the contract documents and with
applicable Contaminated Material Handling Plan, Field Organic Vapor Monitoring Plan, Sampling Plan
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 and/or Disposal Plan. The Contractor shall initiate any measures necessary to protect the safety and health of workers and the general public based on the potential hazards associated with the contaminated soil.
A.Regulatory Compliance. The Contractor shall conduct all tasks in accordance with all applicable Federal, State, County, and local regulations including, but not necessarily limited to:
1.29 CFR 1910.120 and 29 CFR 1926.65 – Hazardous Waste Operations and Emergency Response;
2.6 NYCRR 360 - Solid Waste Management Facilities;
3.6 NYCRR 364 - Waste Transporter Permits;
4.6 NYCRR 371 - Identification and Listing of Hazardous Wastes (Defines Resource Conservation and Recovery Act (RCRA) defined hazardous wastes;
5.6 NYCRR 372 - Hazardous Waste Manifest System and Related Standards for Generators, Transporters and Facilities (applicable to soils regulated as hazardous wastes only);
6.6 NYCRR Part 375 – Environmental Remediation Program;
7.49 CFR 100 to 180 - USDOT Hazardous Materials Transport and Manifest System Requirements (applicable to soils regulated as hazardous wastes only);
8.CP – 51/Soil Cleanup Guidance (NYSDEC Policy).
B.Preparation of Plans and Advance Notification Letters. The Contractor shall be required to prepare one or more of the plans described below. Two (2) copies of each applicable plan shall be submitted to the Engineer for acceptance at least 30 calendar days prior to commencing work in areas identified as potentially contaminated. Plans and notification letters shall be prepared based on the type(s) of contamination and locations identified in the contract documents. If a different type of contamination is encountered during work, and additional plans and notification letters must b e written, the 30 calendar day lead time for submittals may be modified by the Engineer as appropriate.
1.Contaminated Material Handling Plan (CMHP). If the segregation and storage item is included in the contract, a CMHP shall be prepared. The CMHP shall describe the procedures to be used to segregate contaminated soil during excavation, soil storage/stockpile procedures, and safety and health issues . The following information shall be included in the CMHP:
a.Name and address of the plan preparer;
b.Contract name, contract number and description;
c.Describe procedures to be used to segregate contaminated soil during excavation;
d.Location of intended soil stockpile, trucks, roll -off container and other storage areas;
e.Describe how contaminated soil will be moved to soil storage locations;
f.Describe how soil storage/stockpile locations will be prepared and managed;
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 g. Describe how potential air quality impacts such creation of dust particulates and vapors will be minimized to protect air quality within, adjacent to or downwind from the project.
h.Describe air monitoring procedures to be used during work, define action levels, and explain the response if action levels are exceeded; The protocol and procedures shall consider action levels for both work personnel and also perimeter/community action l evels based on the nature of the contamination and activities conducted
i.Hazardous substance evaluation - types of chemicals associated with the waste to be generated,
j.Hazard assessment - physical and toxic effects associated with the waste to be generated; Personal protective clothing (PPC) and personal protective equipment (PPE) to be used or available on -site;.
k.Names of key personnel, emergency contacts and phone numbers;
l.List the OSHA training each worker has received. At least one worker must have completed supervisor training per 29 CFR 1910.120(E)(4);
m.General and site -specific safety rules, with emergency response procedures and directions to the nearest hospital (with map);
n.Decontamination procedures for personnel and equipment; and
o.Disposal of contaminated PPC and PPE;
2.Field Organic Vapor Monitoring Plan (FOVMP). If the field organic vapor monitoring item is included in the contract, a FOVMP shall be prepared. The following information shall be included in the FOVMP:
a.Name and address of the plan preparer;
b.Name, address, experience and qualifications of the independent firm performing the field organic vapor monitoring.
c.Name, address, experience and qualifications of each individual who will conduct the field organic vapor monitoring. Each individual shall be thoroughly trained in sampling protocols, organic vapor monitoring procedures, and equipment calibration procedur es.
d.Type(s) of organic vapor monitoring equipment to be used – model , manufacturer and details of the PID or FID equipment that will be used to conduct field organic vapor monitoring; and
e.Description of the field organic vapor monitoring and calibration procedures to be used.
3.Sampling Plan. If a sampling and analysis item is included in the contract, a Sampling Plan must be prepared. The following information shall be included in the Sampling Plan:
a.Name and address of the plan preparer;
205-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 b. Name, address, telephone number, and ELAP certification number of the proposed NYSDOH ELAP accredited laboratory;
c.Name, address, experience and qualifications of each individual who will collect soil samples. Each individual shall be thoroughly trained in sampling protocols, handling and chain of custody procedures, and laboratory requirements.
d.List of all laboratory tests required by the disposal/treatment facility
e.Describe the sample collection and handling procedures to be used; and
f.Sampling schedule or a description of the sampling frequency to be used to facilitate prompt disposal of stored soil. If sampling and analysis items are not included in the contract, a separate Sampling Plan is not required, and the Contractor shall perform any soil sampling and analysis required under the disposal item.
4.Disposal Plan. If a disposal item(s) is included in the contract, a Disposal Plan shall be prepared. The following information shall be included in the Disposal Plan:
a.Name and address of the plan preparer;
b.Name of disposal/treatment facility, address, telephone number and contact person;
c.Copy of applicable permits and/or licenses held by the disposal/treatment facility;
d.EPA Identification Number and/or State Facility Identification Number issued to the disposal/treatment facility;
e.Method(s) of disposal/treatment that will be used;
f.Signed letter from the disposal/treatment facility stating it is authorized under law to accept the type of waste being generated, their intent to accept the contaminated waste generated by this contract, and a list of the laboratory tests required by the facility;
g.Name of waste transporter, address, telephone number and contact person;
h.EPA Identification Number and/or State Transporter Identification Number issued to waste transporter; and
i.Copies of all waste transporter permits and/or license plate numbers for vehicles that will be used for transport of waste from the site to the intended disposal/treatment facility;
j.If a sampling and analysis item(s) is not included in the contract, the following information shall be included in the Disposal Plan for any sampling and analysis that will be conducted:
1.Name, address, telephone number, and ELAP certification number of the proposed NYSDOH ELAP accredited laboratory.
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 (2) Name, address, experience and qualifications of each individual who will collect soil samples. Each individual shall be thoroughly trained in sampling protocols, handling and chain of custody procedures, and laboratory requirements.
3.List of all laboratory tests required by the disposal/treatment facility;
4.Describe the sample collection and handling procedures to be used; and
5.Sampling schedule or a description of the sampling frequency to be used to facilitate prompt disposal of stored soil.
5.Advance Notification Letters (Letters). At least 10 calendar days prior to commencing work in contaminated areas, the Contractor shall prepare and submit Advance Notification Letters, (Letters) to the Engineer, the appropriate NYSDEC Regional Office (Environmental Remediation, Spill Prevention a nd Response), and the local fire department. The Letters shall include the dates that work will occur in contaminated areas, work locations, soil storage/stockpile locations, and the name, field office address and phone number of the Engineer. The Contractor shall provide the Engineer with a copy of the Letters sent to the NYSDEC and fire department.
205-3.02 Segregation and Storage. The Contractor shall have an accepted CMHP prior to commencing
work within potentially contaminated soil areas. Contaminated soil areas are identified in the contract documents. Soil determined to be contaminated (by PID/FID screening or observation) sha ll be segregated from non -contaminated soil and stored pending sampling, analysis and disposal. If feasible, soil with significantly higher PID/FID head space readings and soil exhibiting unusual visual or odor characteristics shall be segregated from othe r contaminated soil. The Contractor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. The Departme nt will determine the preliminary regulatory classification of the suspect soil and will determine how the soil is to be managed. The Contractor shall not store contaminated soil for more than 40 calendar days, with this time limit beginning on the first day soil is placed in a stockpile, truck -bed or roll -off container. If the Engineer approves additional storage time for soil deter mined to be contaminated non -hazardous industrial waste, the Contractor shall also request approval from NYSDEC for any storage greater than 60 calendar days. If the Engineer approves additional storage time for soil determined to be RCRA regulated hazard ous waste, the Contractor shall also obtain approval from NYSDEC for any storage greater than 90 calendar days. Contaminated soil may be placed in stockpiles, trucks or roll -off containers as follows:
A.Stockpiles. The Contractor shall prepare and maintain stockpiles as follows:
1.Preparation of Stockpile Areas.
a.The area shall be graded to provide positive drainage away from intended stockpile locations.
b.All stones, roots, debris and other objects that may puncture polyethylene ground protection shall be removed.
c.The ground surface where soil will be stockpiled shall be covered with a minimum of 10 - mil or 2 layers of 6 -mil polyethylene sheeting, or an equivalent material. All seams shall be overlapped and sealed to prevent the leaching of contaminants.
205-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 d. Stockpile locations shall be within the right -of-way and accepted by the Engineer prior to use.
2.Stockpile Protection.
a.At the end of each work day, contaminated soil stockpiles shall be completely covered with a minimum of 10 -mil or 2 layers of 6 -mil polyethylene sheeting, or an equivalent material. All seams shall be overlapped and sealed to prevent the leaching of contam inants.
b.Stockpile covers shall be weighted or secured by appropriate means to prevent tearing or removal by weather conditions.
c.Stockpiles shall be labeled, signed, fenced or otherwise secured (as needed) at the end of each work day.
3.Maintenance.
a.Stockpile covers, site grading, signing and security measures shall be properly maintained for the duration of storage.
b.Damaged covers and other protections shall be repaired or replaced by the Contractor within 24 hours after notification. If this work is not satisfactorily completed within 24 hours, no further stockpiling shall be allowed until such work is completed.
B.Trucks or Roll -off Containers. The Contractor shall prepare and maintain trucks and roll -off containers as follows:
1.The interior of truck -beds and roll -off containers shall be lined with 10 -mil or 2 layers of 6 -mil polyethylene sheeting, or an equivalent material. All seams shall be overlapped and sealed to prevent the leaching of contaminants.
2.At the end of each work day, trucks and roll -off containers storing soil shall be completely covered with waterproof tarpaulins. Tarpaulins shall be placed over the top of the truck bed or container (rather than over the soil inside) and shall extend over the sides to prevent water accumulation and the evaporation of contaminants.
3.Tarpaulins shall be weighted or secured by appropriate means to prevent tearing or removal by climatic conditions.
4.Trucks and roll -off containers shall be labeled, signed, fenced or otherwise secured (as needed) at the end of each work day.
5.Trucks, roll -off containers and tarpaulins shall be properly maintained for the duration of soil storage.
6.Damaged tarpaulins and protections shall be repaired or replaced by the Contractor within 24 hours after notification. If this work is not satisfactorily completed within 24 hours, no further soil storage shall be allowed until such work is completed.
7.Trucks and roll -off containers storing contaminated soil shall be located as described in CMHP.
205-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-3.03 Field Organic Vapor Monitoring. The Contractor shall hire an independent firm to perform field organic vapor monitoring in accordance with the accepted FOVMP. The individual conducting the monitoring, hereafter referred to as the Field Monitor, shall be experienced and thoroughly train ed in sampling protocols, organic vapor monitoring procedures, and equipment calibration procedures. The Field Monitor shall screen potentially contaminated soil during excavation using field vapor monitoring equipment (PID/FID) and visual observations. Ba sed on the screening results, the Field Monitor shall direct the Contractor on the proper segregation of the material. Field organic vapor monitoring shall be conducted when working in the contaminated soil areas identified in the contract documents, or whenever unusual or suspicious soil conditions based on visual or odor evidence are encountered during excavation. The Co ntractor or Field Monitor shall notify the Engineer immediately if soil is discovered that appears to contain unknown contaminants or soil that varies significantly from the type of contamination identified in the contract documents. (For health and safety reasons, personnel shall not evaluate odor by placing soil directly to the nose or by inhaling vapors from grab or bag samples). The Field Monitor shall calibrate the PID/FID on a daily basis prior to starting field work and shall determine a background measurement. Excavated soil shall be tested with the PID/FID at intervals that will ensure the soil is being properly assessed for contamination. The PID/FID will be used to take head space readings from bag samples with the soil temperature at least 50OF. The Field Monitor shall maintain detailed and legible field notes indicating work locations, nature of work being performed, PID/FID head space readings, time of readings, pertinent measurements, visual and odor observations, quantities of both contaminated and non -contaminated soils excavated at each location, storage/stockpile locations, work hours, weather conditions, and any un usual conditions encountered. The Contractor shall provide the Engineer with a copy of all field notes within 5 work days from their recording. The segregation threshold established below (25ppm) is based on gasoline being the predominant contaminant. If a different contaminant(s) is present or suspected, a different segregation threshold may need to be established. Alternative segregation thresho lds may be designated in the contract documents. PID/FIDs detect and measure gas concentrations (specifically volatile organic compounds); they do not quantify or identify the contaminants in the soil. Therefore, PID/FID readings can not determine specific contaminant concentrations within the soil. Segregate soil as follows:
A.Non -Contaminated Soil. Soil with PID/FID head space readings less than 25 ppm and exhibiting no other evidence of contamination (visual or olfactory evidence) shall be considered non - contaminated. Unless further analysis is performed for confirmation of the non -contaminated so il, this soil will be considered uncontaminated.
B.Contaminated Soil. Soil with PID/FID head space readings equal to or greater than 25 ppm and/or soil exhibiting other evidence of contamination (visual or olfactory evidence) shall be considered contaminated. This soil shall be segregated from non -contaminated soil and place d in stockpiles or containers. If sampling and analysis provisions are included for the segregated soil, the results of laboratory analysis will be used to determine its regulatory classification. If feasible, soil with significa ntly higher PID/FID head space readings and soil exhibiting unusual visual or odor characteristics shall be segregated from other contaminated soil.
205-3.04 Sampling and Analysis. The Contractor shall have an accepted Sampling Plan prior to
commencing work within potentially contaminated areas. Sampling shall be conducted by individuals thoroughly trained in sampling protocols, handling and chain of custody procedures, and laborat ory requirements. Accepted sampling practices shall be used to obtain representative composite sample(s) and/or grab sample(s) as required for the specific analyses to be completed. Representative samples shall be collected from stored soil as soon as pos sible after excavation. Soil shall be taken from a depth greater than one foot within the stockpile. Each composite sample shall include a minimum of four sample
205-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 points. Grab samples shall be collected in a manner so as to best characterize the extent of contamination of the soil in question and best characterize the extent of contamination of the pile. If any soil areas are present with field indications of cont amination discretely different than the other areas (i.e., significantly elevated PID/FID readings, staining, etc.), the area may require a separate sample and the Engineer shall be alerted to approve additional sample and analysis. Analyses shall be com pleted at a NYSDOH ELAP accredited laboratory that is certified to perform the required tests. Analyses shall be completed within 10 work days of sample collection. The Contractor shall provide the Engineer with a copy of all reports within 2 work days of their receipt from the laboratory. Soil shall not be added to any stockpile, truck or roll -off container after its contents have been sampled. If soil is added after sampling, or sampled soil is otherwise tampered with, the Contractor shall re-sample the soil at no additional cost to the St ate. Conduct specified analyses as follows:
A.Petroleum Contamination Parameter Analysis. Samples shall be analyzed for petroleum contamination constituents (total constituent analysis) in accordance with CP – 51/Soil Cleanup Guidance, Gasoline and Fuel oil, Tables 2 and 3 using USEPA Method 8260 for volatile organics and methyl t -butyl ether (MTBE) and USEPA Method 8270 for base/neutrals.
B.Hazardous Waste RCRA Toxicity Characteristic Analysis. Samples shall be analyzed for Hazardous Waste RCRA Toxicity Characteristics Leaching Procedure (TCLP) constituents. Analysis shall be for full TCLP constituents on the sample extract as prepared by USEPA Method 1311.
C.Ignitability of Solids Analysis. Samples shall be analyzed for ignitability by USEPA Method 1030.
D.pH of Soil and Waste. Samples shall be analyzed for pH measurement by USEPA Method 9045.
E.Polychlorinated Biphenyls (PCB) Analysis. Samples shall be analyzed for PCBs by USEPA Method 8082.
F.Total Petroleum Hydrocarbons (TPH) Analysis. Samples shall be analyzed for petroleum hydrocarbons, USEPA Method 8015, gasoline range organics (GROs) and/or diesel range organics (DROs).
205-3.05 Transportation and Disposal. The Contractor shall have an accepted Disposal Plan prior to
the transportation and disposal of contaminated soil. Contaminated soil shall not be transported until all sampling and analysis, as required by the Department or by the Disposal facility, hav e been performed and laboratory reports have been provided and accepted by the Department.
A.Transportation Off Site.
1.For the duration of transportation, roll -off containers and truck beds shall be completely covered with secured waterproof tarpaulins to prevent water infiltration, evaporation of contaminants and spillage of contaminated soil.
2.The Contractor shall take immediate action to remedy any situation involving a release of contaminated soil during loading or while in transit.
3.Contaminated soil shall not be combined with material from any other source. NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 4. Contaminated soil shall be transported in vehicles with valid Waste Transporter permits for New York State (and other required permits/licenses from any other states as applicable). The Contractor shall provide a copy to the Engineer of the waste transp orter permit documenting that the transporter is authorized to transport waste to the intended disposal/treatment facility. The Contractor shall complete any required shipping papers, labeling, placarding, and weighing/load measurements and shall provide copies of required documentation to the Engineer.
5.Contaminated soil that is determined to be a regulated hazardous waste per the criteria of 6 NYCRR Part 371 shall be shipped with a hazardous waste manifest to a treatment/disposal facility permitted to accept the waste. The Contractor shall complete all required manifests, labeling, placarding, land disposal restriction notifications, and other requirements for shipping and tracking hazardous wastes and shall provide copies of required documentation to the Engineer. The Engineer will provide the Contr actor with the EPA Identification Number(s) issued to the Department as the hazardous waste generator and will sign the generator certification statements.
B.Disposal/Treatment. Contaminated soil shall be disposed of by the methods and procedures described in the accepted Disposal Plan. Soil characterization information, field identification and confirmation laboratory analyses, if included in the contract, will be used to deter mine appropriate classification and category of soil for disposal. Each category of surplus or waste soil shall be handled and disposed of based upon its characterization in accordance with the requirements outlined in §107 -10 Managing Surplus Material a nd Waste for the following categories:
2.Contaminated Non -hazardous Industrial Waste; or
3.Hazardous Waste regulated by 6 NYCRR Part 371 Soils characterized as contaminated as Hazardous Waste or as Non -hazardous Industrial Waste shall be disposed of and paid for per the items 205.0501 and 205.0502 respectively. Contaminated soil shall be transported to a disposal/treatment facility within 40 calendar days from the start of storage. The Contractor shall complete under this item any soil sampling and analysis required by the disposal/treatment facility that is not specifically included in the contract.
C.Documentation. The Contractor shall provide the Engineer with copies of all receipts from the disposal/treatment facility which indicate the actual quantity of waste received within 2 work days of receipt from the facility. For soil determined to be RCRA regulated haz ardous waste, the Contractor shall also provide the Engineer with the appropriate copies of each signed manifest within 2 work days of receipt. Any manifest discrepancies, including the need for exception reporting, shall be reported imme diately to the Engineer and shall be resolved by the Contractor.
205-3.06 Reuse of Contaminated Soil. The Contractor shall place contaminated soil as embankment, fill
or other appropriate on -site use as determined and approved by the Department, and in accordance with the contract documents. Only appropriate soils placed in appropriate locations as incl uded in the contract documents shall be reused.
205-4 Method of Measurement.
205-4.01 General. (Vacant)
205-4 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 205-4.02 Segregation and Storage. The work under segregation and storage will be measured for payment on a lump sum basis.
205-4.03 Field Organic Vapor Monitoring. The quantity for payment will be in hours of field organic
vapor monitoring performed, measured to the nearest one -half hour.
205-4.04 Sampling and Analysis. The quantity to be measured for payment will be the number of soil
samples analyzed as included in the contract documents.
205-4.05 Transportation and Disposal. The quantity to be measured for payment will be in tons of
contaminated soil transported to a disposal/treatment facility, measured to the nearest 0.1 ton. If measurement of the contaminated soil by weight is not feasible, a conversion factor of 1.4 ton s per cubic yard will be used to determine the quantity for payment.
205-4.06 Reuse of Contaminated Soil. The quantity to be measured for payment will be in cubic yards
of contaminated soil stockpiled for reuse, computed to the nearest whole cubic yard.
205-5 BASIS OF PAYMENT. The price bid shall include the cost of all labor, materials and equipment
necessary to complete the work. Excavation will be paid for separately. Payment will be made under: Item No. Item Pay Unit 205.02nn Segregation and Storage of Contaminated Soil Lump Sum 205.03 Field Organic Vapor Monitoring of Contaminated Soil Hour 205.0401 Petroleum Contamination Parameter Analysis Each 205.0402 Laboratory Analysis for Hazardous Waste RCRA Toxicity Characteristic Each 205.0403 Laboratory Analysis for Ignitability Each 205.0404 Laboratory Analysis for ph Each 205.0405 Laboratory Analysis for Polychlorinated Biphenyls (PCB's) Each 205.0406 Laboratory Analysis for Total Petroleum Hydrocarbons – Gasoline Range Organics Each 205.0407 Laboratory Analysis for Total Petroleum Hydrocarbons – Diesel Range Organics Each 205.0501nn Disposal of Contaminated Hazardous Waste Soil Ton 205.0502nn Disposal of Contaminated Non -Hazardous Waste Soil Ton 205.06nn Reuse of Contaminated Soil Cubic Yard Note: nn denotes serialized pay item for each discrete contaminated area of property as indicated on the plans. The serialized items allow for different plans and different disposal procedures for discretely different areas and nature of the contamination. SECTION 206 - TRENCH, CULVERT AND STRUCTURE EXCAVATION
206-1 Description .
206-1.01 General. This work shall consist of the excavation and disposal of excavated material required
for trenches, culverts, structures, conduit and direct burial cable not otherwise provided for in other sections of these specifications. All such excavation shall be unc lassified excavation as defined in §203 - 1.01. The work shall be conducted in accordance with 29 CFR 1926 Subpart P.
206-1.02 Structure Excavation. The work specified under this item shall include the excavation for all
bridge foundations, walls and other major structures.