625-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 625-5.01 General. (Vacant)
625-5.02 Survey Operations. The price bid shall include the cost of furnishing all labor, materials and
equipment necessary to satisfactorily complete the work, including preparation of the contract control plan. Progress payments will be made in proportion to the amount of work c ompleted.
625-5.03 Right of Way Markers. The unit price bid shall include the cost of furnishing all labor,
materials, and equipment necessary to satisfactorily complete the work. Payment will be made after the complete and proper installation of the marker, receipt of the certification form b y the Engineer, and after approval of the certification by the Regional Land Surveyor.
625-5.04 Permanent Survey Markers. The unit price bid shall include the cost of furnishing all labor,
materials, and equipment necessary to satisfactorily complete the work. Payment will be made after the complete and proper installation of the marker, receipt of the certification form b y the Engineer, and after approval of the certification by the Regional Land Surveyor.
625-5.05 Supplemental Site Survey. The price bid shall include the cost of furnishing all labor,
materials and equipment necessary to satisfactorily complete the work. Payment will be made upon the satisfactory submission of the completed and certified mapping deliverables. Substantive additions to the work limits described in the contract will be considered extra work.
625-5.06 GPS Inspection Units. The unit price bid shall include the cost of labor, materials and
equipment necessary to satisfactorily complete the work, including the cost of the required training and necessary maintenance. Payment will be made under: Item No. Item Pay Unit 625.01 Survey Operations Lump Sum 625.03 Concrete Right of Way Markers Type H (High) Each 625.04 Concrete Right of Way Markers Type L (Low) Each 625.05 Steel Pin and Cap Right of Way Markers Each 625.06 Permanent Survey Markers Each 625.07nnnn Supplemental Site Survey Lump Sum 625.11nnnn Survey Grade GPS Inspection Unit Each 625.12nnnn Mapping Grade GPS Inspection Unit Each SECTIONS 626 THRU 628 (VACANT) SECTION 629 - PETROLEUM STORAGE TANK CLOSURE (Last Revised January, 2017)
629-1 Description
629-1.01 General. This work shall consist of emptying, purging/inerting, cleaning, removing, and
disposing of petroleum storage tanks; endpoint sample collection and analysis; and proper documentation of the work in accordance with the contract documents and as directed b y the Engineer.
629-2 MATERIALS (Not Specified)
629-3 Construction Details
629-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 629-3.01 General. All petroleum storage tanks shall be closed in accordance with the requirements of the NYS Department of Environmental Conservation (NYSDEC), as well as local fire and police agencies. NYSDEC shall be notified prior to the initiation of tank closure act ivities. For instances where tanks that have not been identified during the design process are discovered during construction, NYSDEC shall be notified as soon as possible after discovery of the tank(s). If evidence of a petroleum spill that was not previously reported is discovered during construction, the contractor shall call the NYSDEC Spills Hotline at 1 (800) 457 -7362, within two hours of discovering the spill. Excavation shall be performed in accordance with Section 206 Trench, Culvert and Structure Excavation . Segregation and stockpiling of contaminated soils shall be performed in accordance with Section 205 Contaminated Soil . If specified in the contract documents, or at the request of the Department in instances where tanks are not discovered until after construction has begun, the Contractor shall provide field organic vapor monitoring in accordance with §205 -3.03 Field Organic Vapor Monitoring in the following instances: contaminated soil is present; there is a potential for nuisance petroleum odors; or if the work is being performed in close proximity to residences, schools, or other sensitive receptors. The Contractor shall provide a schedule for tank closure activities to the Engineer a minimum of 35 calendar days prior to commencing work, except for when previously unidentified tanks are discovered during construction and the work will take place in les s than 35 calendar days. In such instances, the Contractor shall notify the Engineer immediately upon discovery of the tank(s). The Department will notify appropriate NYSDEC personnel at least 30 calendar days prior to tank closure activities, except for when previously unidentified tanks are discovered as described above. In such instances, the Department will notify NYSDEC as soon as possible after discovery of the tank(s).
629-3.02 Removal/Disposal of Liquids from Petroleum Storage Tanks. Before the removal of any
tank begins, it shall first be rendered free of product and water. All liquids shall be disposed of in accordance with §107 -10 Managing Surplus Material and Waste . Product shall be managed with a preference toward recycling or beneficial reuse when such options are available. Liquids shall be transported to the disposal/recycling facility only by appropriately permitted haulers. During the removal operation (inc luding cutting the tank open to remove product, if necessary) the following restrictions shall apply:
629-3.03 Petroleum Storage Tank Closure. Tank closures shall consist of all of the following
components, unless specifically noted in the contract documents.
629-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 A. Project Safety and Health. The Contractor shall ensure that all personnel directly involved in tank closure activities have been trained in conformance with the requirements of 29 CFR 1910.120 and 1926.65 (referred to hereafter as 1910.120). There shall be at least one person on site who has supervisor training as per 29 CFR 1910.120(E)(4) during all tank closure activities. The Project Safety and Health Plan (PSHP) required by §107 -05B shall also meet the requirements of 29 CFR 1910.120 (b) (4).
629-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 The tank shall be removed from the tank pit and placed on 6 mil minimum plastic sheeting with the vents aligned at the top of the tank (the 12 o’clock position). The tank shall be blocked or chocked in order to prevent rolling. Contaminated soil, if present in or around the tank, shall be handled and managed in accordance with provisions found in Section 205 Contaminated Soil .
629-3.04 Endpoint Sample Collection and Analysis . NYSDEC personnel, if present during tank
closure activities, may advise the Engineer that endpoint samples are not required in order to obtain tank closure. If NYSDEC personnel are not on -site during tank closure, or if NYSDEC personnel are on site
629-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 and suggest that endpoint samples will be required in order to obtain tank closure, endpoint samples shall be collected as follows: After contaminated soil, if present, is removed to the extent practicable, a person, whose qualifications have been submitted in accordance with §205 -3.01 B. 3. Sampling Plan , shall collect a total of five composite samples from the tank pit. A composite sample is defined as a sample composited from individual grab samples collected on an areal or cross sectional basis. Each composite sample shall be made up of equal volumes of grab samples collected in an identical manner. One composite sample shall be collected from each of the side walls at a distance approximately one third up from the bottom of the pit and one composite sample shall be collected from the bottom of the pit. Samples shall be collected into properly labeled laboratory provided glasswar e, which shall then be placed into re -sealable plastic bags and stored in a cooler with ice. The contractor shall deliver the s amples, in accordance with appropriate chain -of-custody procedures and sample hold -times, to a NYS Department of Health Environme ntal Laboratory Approval Program (ELAP) Certified laboratory for the following analyses:
629-4 Method of Measurement
629-4.01 General. (Vacant)
629-4.02 Removal/Disposal of Liquids from Petroleum Storage Tanks. The quantity of
removed/disposed of liquids to be measured for payment will be in gallons, measured to the nearest whole gallon. The Contractor shall provide disposal receipts from an approved facility that accepts the material to verify the quantity di sposed.
629-4.03 Petroleum Storage Tank Closure. The quantity of tanks closed to be measured for payment
will be the number of tanks within the indicated size range closed.
629-4.04 Endpoint Sample Collection and Analysis. The quantity to be measured for payment will be
the number of samples collected and analyzed according to the specified methods.
629-5 Basis of Payment .
629-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 629-5.01 General. Soil Handling, Field Organic Vapor Monitoring other than within the tank atmosphere, and removing and disposing of contaminated soil, except soil contaminated during the tank removal operations, will be paid for separately.
629-5.02 Removal/Disposal of Liquids from Petroleum Storage Tanks. The unit price bid shall
include the cost of all labor, materials, and equipment necessary to satisfactorily complete the work, including laboratory analyses required for the proper disposal of the liquids. The maximum amount of payment will be the unit b id price multiplied by the capacity of the tank.
629-5.03 Petroleum Storage Tank Closure. The unit price bid shall include the cost of all labor,
materials, and equipment necessary to satisfactorily complete the work, not including excavation and backfill. Progress payments of 50% of the unit price bid will be paid after the tank removal has been completed, a completed Form HC 629 Tank Closure Form and, if endpoint samples were required, a completed chain of custody form showing that the samples were delivered to the laboratory. The remaining percentage will be paid after the Department has received from the Contractor all remaining documentation n ecessary for the Department to submit a complete Tank Closure Report to NYSDEC, including: invoices confirming t he final disposition of: the tank, any liquids removed from the tank, any wastes generated during tank cleaning, and any contaminated soil that was removed; and, if endpoint samples were required, a final laboratory report.
629-5.04 Endpoint Sample Collection and Analysis. The unit price bid shall include the cost of all
labor, materials, and equipment necessary to satisfactorily complete the work. Payment will be made after all analytical data has been received by the Department, and a Department representative has reviewe d the data to verify that it is correct. Payment will be made under: Item No. Item Pay Unit 629.01 Removal/Disposal of Liquids from Petroleum Tanks Gallon 629.02xx Petroleum Storage Tank Closure (various size ranges) Each 629.0301 Endpoint Sample Collection and Analysis ( Confirmed Gasoline Tanks ) Each 629.0302 Endpoint Sample Collection and Analysis ( Fuel Oil/Diesel/Suspect Gasoline ) Each 629.0303 Endpoint Sample Collection and Analysis (Waste Oil Parameters) Each 629.0304 Endpoint Sample Collection and Analysis (Other Product Parameters) Each NOTE: xx -see Pay Item Catalog or Proposal for complete description . SECTION 630 - BARRICADES
630-1 DESCRIPTION. This work shall consist of furnishing and erecting in accordance with the
appropriate standard sheet, permanent type barricades for highway or highway -railroad installations at the locations indicated on the plans or as directed by the Engineer.
630-2 MATERIALS. Materials shall meet the requirements of the following subsections of Section 700
- Materials and Manufacturing . Wood Posts 710-13 Galvanized Steel Barrier Posts 710-14 Corrugated Beam Guide Railing and Median Barrier 710-20 Reflective Sheeting 730-05