NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 207-5.03 Prefabricated Composite Drains for Structures. The unit price bid shall include the cost of furnishing all labor, equipment, and material necessary to complete the work. No payment will be made for repairs or replacement. Payment will be made under: Item No. Item Pay Unit 207.20 Geotextile Bedding Square Yard 207.21 Geotextile Separation Square Yard 207.22 Geotextile Drainage Square Yard 207.23 Geotextile Slope Protection Square Yard 207.24 Geotextile Stabilization Square Yard 207.25 Geomembrane Square Yard 207.26 Prefabricated Composite Structural Drain Square Yard 207.27 Prefabricated Composite Integral Abutment Drain Square Yard SECTION 208 - STORMWATER MANAGEMENT PRACTICES (Last Revised May 2022)
208-1 DESCRIPTION . The work shall include furnishing, installing, maintaining, and cleaning
stormwater management practices, in accordance with the contract documents and as directed by the Engineer.
208-1.01 General .
208-1 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 hydrocarbons, nutrients and/or metals collected by the practice.
208-1.02 SWTD. The work shall include furnishing, installing, and maintaining a SWTD, in accordance
with the contract documents and as directed by the Engineer.
208-1.03 Cleaning SWTD. The work shall include cleaning SWTDs in accordance with the contract
documents and as directed by the Engineer.
208-2 Materials.
208-2.01 General. None specified
208-2.02 SWTD. The materials shall meet the requirements of the following subsections of Section 700,
Materials and Manufacturing . Stormwater Treatment Device 738-01 The Contractor shall provide a SWTD that is:
208-2.03 Cleaning SWTD. None specified.
208-3 Construction Details.
208-3.01 General. The Contractor shall inspect and maintain the stormwater management practices for
the duration of the contract. The schedule for inspecting and maintaining each stormwater management practice shall be per the manufacturer’s recommendations to sustain prac tice performance and efficiency, and/or as indicated in the contract documents. Inspection and maintenance shall be included in the cost of the payment item. The Contractor shall keep a record of stormwater management practice inspections and maintenance. Stormwater management practices not performing to manufacturer’s defined efficiency standards shall be repaired or replaced at no additional cost to the Stat e.
208-3.02 SWTD . The Contractor shall install and maintain the SWTD in accordance with manufacturer
recommendations and the contract documents.
208-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 C. Submittals . A minimum of two weeks prior to installation, the Contractor shall provide a copy of the manufacturer’s cut sheets, installation details, and operations and maintenance manuals for each SWTD unit type. Electronic copies are acceptable.
208-3.03 Cleaning SWTD. Cleaning shall be performed during dry weather. Entry into the SWTD or
nearby drainage structure may be necessary to complete the work described under this specification. SWTDs and other subsurface stormwater drainage devices are confined spaces. Entr y into confined spaces requires compliance with OSHA safety procedures (29 CFR 1910.146 and 29 CFR 1926.21) and NYS Industrial Code Rules 12 and 23. The Contractor shall ensure that employees wear all required personal protective equipment (PPE) when perf orming this work.
208-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Inspection . In the presence of the Engineer, the Contractor shall open the SWTD access and make a visual inspection. The Contractor shall determine if the device’s inlet and/or outlet is submerged. If the inlet/outlet is submerged, the pipe(s) connecting to the S WTD shall be plugged using a standard rubber expandable plug, or other type of approved fabricated plug. The depth of accumulated sediment in each device shall be measured with a probe and recorded.
208-4 Method of Measurement.
208-4.01 General. Vacant.
208-4.02 SWTD. The work will be measured as the number of each SWTD installed and maintained.
208-4.03 Cleaning SWTD. The work will be measured as the number of each SWTD cleaned.
208-5 Basis of Payment.
208-5.01 General. Vacant.
208-5.02 SWTD. The unit price bid for each SWTD shall include the cost of all labor, materials and
equipment necessary to satisfactorily complete the work, including manhole frames and covers, and SWTD cleaning and maintenance.
208-5 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Backfill. Backfill of drainage structures and leaching basins will be paid for under the item(s) shown in the contract documents.
208-5.03 Cleaning SWTD. The unit bid price per each SWTD cleaned shall include the cost of
furnishing all labor, materials, equipment, transport and disposal necessary to satisfactorily complete the work. Progress payments will be made upon the satisfactory cleaning of the SWTD at 75% of the unit price bid. The remaining percentage will be paid after the Engineer has verified and checked quantities on receipts for all wastes received by the disposal facili ties. Payment will be made under: Item No. Item Pay Unit 208.5101 SWTD - Maximum Treatment Flow Rate up to 1.0 cfs Each 208.5201 SWTD - Maximum Treatment Flow Rate over 1.0 cfs up to 2.0 cfs Each 208.5301 SWTD - Maximum Treatment Flow Rate over 2.0 cfs up to 2.8 cfs Each 208.5401 SWTD - Maximum Treatment Flow Rate over 2.8 cfs up to 3.8 cfs Each 208.5501 SWTD - Maximum Treatment Flow Rate over 3.8 cfs up to 5.0 cfs Each 208.5601 SWTD - Maximum Treatment Flow Rate over 5.0 cfs up to 7.0 cfs Each 208.5701 SWTD - Maximum Treatment Flow Rate over 7.0 cfs up to 10.0 cfs Each 208.5801 SWTD - Maximum Treatment Flow Rate over 10.0 cfs up to 15.0 cfs Each 208.5901 SWTD - Maximum Treatment Flow Rate over 15.0 cfs up to 25.0 cfs Each 208.60 Cleaning Stormwater Treatment Device Each SECTION 209 - SOIL EROSION AND SEDIMENT CONTROL (Last Revised January 2019 )
209-1 DESCRIPTION. This work shall consist of furnishing, installing, inspecting, maintaining, and
removing soil erosion and sediment control measures as shown on the contract documents and as directed by the Engineer.
209-1.01 Erosion Control. Erosion Control is any action taken to reduce soil erosion and control
sedimentation, including the use of mulch, straw/wood fiber mulch, seed and mulch, seed and straw/wood fiber mulch, rolled erosion control products, soil stabilizers, and pipe slope dra ins.
209-1.02 Sediment Control. Sediment Control is any action taken to minimize suspended solid material
transport by water, including the use of sediment traps, turbidity curtains, sediment filter logs, silt fence, check dams, drainage structure inlet protection, and stabilized constru ction entrance/exits.