SECTION 406 - ASPHALT PAVEMENT WITH FIBERS

406-1 DESCRIPTION. This work shall consist of formulation and placement of a fiber reinforced

asphalt mixture. The placement of this mixture shall be in accordance with these specifications and in reasonably close conformity with the required lines, grades, thicknesses, and typical sections shown on the plans or established by the Engineer.

406-2 MATERIALS. The requirements of §401-2 and §404-2, Materials, shall apply with the

added information noted below.

A.Fibers. Aramid fiber shall meet the requirements of Table 1 – Aramid Fiber Properties. The acceptance shall be based on the certification from the supplier of fibers.

405-3 07

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 A.B. Table 1 – Aramid Fiber Properties Length Minimum ¾ in. ± 1/16 in. Form Fibrillated & Monofilament Fibers, non-resin impregnated # of filaments per strand 1,000 Specific Gravity 1.44 +/- 0.01 Filament Diameter 12 microns +/- 2 microns Acid/Alkali/Resistance Inert Tensile Strength, minimum 400,000 psi Decomposition Temperature 800⁰ F, minimum

1.Delivery. The fibers shall be delivered in a sealed undamaged container with legible labels indicating material name and lot number.
2.Storage. The fibers shall be stored in accordance with manufacturer’s recommendations. The fibers shall be protected from UV radiation, contamination, or becoming wet.

406-3 CONSTRUCTION DETAILS. Provisions of §401-3 and §404-3, Construction Details, shall

apply with the added information noted below: The fibers shall be added to the asphalt mixture at a rate recommended by the fiber supplier. The minimum rate of aramid fiber added to the mix shall be 2.0 ounces per ton. The fiber product shall be added to the asphalt mixture at a rate recommended by the fiber supplier that will provide at least 2.0 ounces of evenly distributed aramid fibers per ton of asphalt mixture. The fibers shall be added to the asphalt mixture through specialized equipment that can accurately proportion and meter, by weight of total mix, during production of asphalt mixture. The equipment shall be calibrated to the satisfaction of the Regional Materials Engineer showing the fiber is being accurately metered and uniformly distributed into the mix by visual inspection. When a batch plant is used, pre - weighed bags of fiber may be add ed per batch to provide the designed quantity of fibers in the asphalt mixture. Additional requirements for plants are as follows:

1.Batch Plant. When a batch plant is used, the fibers shall be added to the pugmill and follow the manufacturer’s recommendations for both the dry and wet mixing times. The fibers shall be uniformly distributed before the injection of asphalt cement (Performance-Graded binder) into the mixture.
2.Drum Mixer Plant. When a drum plant is used, the fibers shall be introduced such that there is no entanglement in the exhaust system. If there is evidence of clumps of fibers at the discharge chute or on the project, the production of asphalt mixture shall be stopped and follow the fiber manufacturer’s procedures to reduce clumping.

407-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2

406-4 METHOD OF MEASUREMENT. Provisions of §401 -4 and §404 -4, Method of Measurement ,

shall apply.

406-5 BASIS OF PAYMENT. Provisions of §401-5 and §404-5, Basis of Payment, shall apply except

that the bid price shall include the cost of fibers, feeder, and labor for the asphalt mixture production with fibers. Payment will be made under: Item No. Item Pay Unit 406.XXCF Asphalt Pavement Course with Fibers Ton XX= Mixture Pavement Course C= Compaction Series F=Friction Type 01 – Truing & Leveling 5 – 50 Series Compaction 1 – Type 1 06 – 6.3 Top 6 – 60 Series Compaction 2 – Type 2 09 – 9.5 Top 7 – 70 Series Compaction 3 – Type 3 12 – 12.5 Top or Binder 8 – 80 Series Compaction 9 – Type 9 19 – 19 Binder 25 – 25 Binder 37 – 37.5 Base

Get an email when 406 changes

New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications (US Customary Units), 2026 (Jan) Edition. Pages 370–372 of 1,489. View official source ↗