SECTION 419 - FOG SEAL
419-1 DESCRIPTION. The work in this section shall include work required for fog seal (stand alone for
shoulder and median).
419-2 MATERIALS. Materials shall be as specified in the special specifications.
419-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
419-4 METHOD OF MEASUREMENT. As specified in the special specifications.
419-5 BASIS OF PAYMENT. As specified in the special specifications.