NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 417-5.01 General (Vacant)
417-5.02 Heater Scarification (HS). The unit price bid per square yard for this item shall include the
cost of all labor, materials and equipment necessary to satisfactorily complete the work, including heating, scarifying, mixing, paving, compacting, coring, and testing of the recycled mate rials. No deduction will be made in areas such as catch basins or manholes where the scarifying equipment cannot be used.
417-5.03 Hot in -Place Recycling (HIPR). The unit price bid per square yard for this item shall include
the cost of all labor, materials and equipment necessary to satisfactorily complete the work, including heating, milling, mixing, paving, compacting, coring, and testing of the recycled materia ls. No deduction will be made in areas such as catch basins or manholes where the recycling equipment cannot be used. The provisions of §40 4-5, Basis of Payment shall apply for virgin asphalt mix . When there is a disincentive, the payment adjustment will be made based on the Index Price listed in the contract documents. The index price shown in the itemized proposal for each Quality Unit shall be considered the price bid. The unit (index) price is NOT to be altered in any manner by the bidder. Should the bidder alter the price shown, the altered figure will be disregarded and the original price will be used to determine th e total amount bid for the contract.
417-5.04 Recycling Agent. The unit price bid per gallon of recycling agent shall include the cost of all
labor, material, and equipment necessary to complete the work satisfactorily. The Regional Materials Engineer will evaluate the material represented by any failing sample of recycling agent. If the Engineer elects to leave the material in place, the Contra ctor shall receive a pay reduction of 75% of the bid price of the recycling agent for the pavement section represented by the failing sample. Payment will be made under: Item No. Item Pay Unit 417.01 Heater Scarification Square Yard 417.02 Hot In -Place Recycling Square Yard 417.0101 Recycling Agent Gallon SECTION 418 – ASPHALT PAVEMENT JOINT ADHESIVE (New Section September, 2016)
418-1 Description
This work shall consist of furnishing and installing joint adhesive in accordance with the contract documents and as directed by the Engineer.
418-2 Materials
Use a product which appears on the NYSDOT Approved List under ASPHALT PAVEMENT JOINT ADHESIVE (705 -19) meeting the requirements of §705-19.
418-3 Construction Details
418-3.01 General . Furnish all equipment that is necessary to clean the construction joint and to apply the
joint adhesive. Use equipment meeting the description and/or performance requirements described herein and approved by the Engineer. Apply the joint adhesive to the construction joints.
418-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 418-3.02 Joint Preparation . Prepare longitudinal and transverse construction joints as discussed below and place adjacent asphalt pavement on the same day that the joint adhesive is applied. Use a high pressure air lance to thoroughly clean the joint surface of dust, dirt, foreign material, sand and any other extraneous materials immediately prior to applying the joint adhesive. Install suitable traps or devices on the compressed air equipment to prevent moistur e and oil from contaminating the joint surfaces. Maintain these devices and see that they are functioning properly. Protect the public from potentially objectionable and/or hazardous airborne debris.
418-3.03 Joint Adhesive. Heat and melt the joint adhesive in a melter constructed either as a double
boiler filled with a heat -transfer medium between the inner and outer shells, or with internal tubes or coils carrying joint adhesive through a heated oil bath and into a heated d ouble wall hopper. The melter will be equipped with separate thermometers to indicate the temperature of the heat transfer medium and the joint adhesive material, positive temperature controls, and with a mechanical agitator or a re circulation pump to assure a homogeneous blend of the joint adhesive. Check the discharge temperature of the joint adhesive with a non -contact infrared thermometer or other suitable thermometer. Discharge the joint adhesive at the manufacturer's recommended application temperature and maintain the joint adhesive at ± 10°F of the application temperature indicated on the material packaging. Applying joint adhesive is not permitted if the melter and discharge temperatures do not meet the requirements described above. Equip the discharge hose with a thermostatically controlled heating apparatus or insulate it to maintain the proper joint adhesive application temperature. Holster the discharge hose to the melter if it is not thermostatically heat controlled. Circulate th e joint adhesive from the discharge hose and the melter to maintain the proper joint adhesive application temperature. Do not use joint adhesive material that has been heated beyond the safe heating temperature. If the manufacturer's recommendations allow the joint adhesive to be reheated or heated in excess of six hours, recharge the melter with fresh material amounting t o at least 20 percent of the volume of the material remaining in the melter.
418-3.04 Application . Apply the joint adhesive when surface temperature is 40°F and rising. Use an
applicator wand fitted with a sealing shoe to strike -off the adhesive. Strike -off the joint adhesive to provide a 1/4 inch to 3/8 inch thick band. The finished bands are to be a pproved by the Engineer.
418-4 Method of Measurement
This work will be measured as the number of linear feet of joint adhesive satisfactorily furnished and installed.
418-5 Basis of Payment
The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work.
418-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Payment will be made under: Item No. Item Pay Unit 418.7603 Asphalt Pavement Joint Adhesive Linear Foot SECTION 419 - FOG SEAL
419-1 DESCRIPTION. The work in this section shall include work required for fog seal (stand alone for
shoulder and median).
419-2 MATERIALS. Materials shall be as specified in the special specifications.
419-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
419-4 METHOD OF MEASUREMENT. As specified in the special specifications.
419-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 420 - POROUS ASPHALT PAVEMENT
420-1 DESCRIPTION. The work in this section shall include work required for porous asphalt
pavement.
420-2 MATERIALS. Materials shall be as specified in the special specifications.
420-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
420-4 METHOD OF MEASUREMENT. As specified in the special specifications.
420-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTION 421 STONE MATRIX ASPHALT (SMA) PAVEMENTS
421-1 DESCRIPTION. The work in this section shall include work required for Stone Matrix Asphalt
(SMA) .
421-2 MATERIALS. Materials shall be as specified in the special specifications.
421-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be covered
by special specifications in the contract documents.
421-4 METHOD OF MEASUREMENT. As specified in the special specifications.
421-5 BASIS OF PAYMENT. As specified in the special specifications.
SECTIONS 422 THRU 489 - (VACANT)