Structures (500-599)

560MASONRY

NY · 2024 Standard SpecificationsBook pages 337344View official source ↗

560-2 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 A 1-pint sample of sealer is required to be taken at a random time during sealer application from the point of application (i.e., from the nozzle of sprayer or spray bar or from the sealer container where sprayers, brushes or rollers are loaded) for quality assurance purposes. This sample shall be submitted to the Department’s Central Testing Laboratory (CTL), to the attention of the Chemistry Lab for evaluation. Additi onal samples may be requested by the Department at any time.

b.For Coating Type Protective Sealers – Apply in accordance with the Contract Plans and the sealer manufacturer's written instructions.

559-4 Method of Measurement

The quantity to be measured for payment will be in the number of square feet of concrete sealed measured to the nearest whole square foot.

559-5 Basis of Payment

The unit price bid shall include the cost of furnishing all labor, materials, and equipment necessary to satisfactorily complete the work. Payment will be made under: Item No. Item Pay Unit 559.01 Protective Sealing of Structural Concrete on New Bridge Square Foot Decks and Bridge Deck Overlays 559.02 Protective Sealing of New Structural Concrete Square Foot 559.03 Protective Sealing of Existing Structural Concrete and Existing Bridge Decks Square Foot 559.04 Protective Sealing of Concrete with Coating Type Protective Sealer SquareFoot SECTION 560 - MASONRY

560-1 DESCRIPTION. Under this work the Contractor shall furnish and place masonry, with or without

coping, of the type, shape, size, color and location indicated in the plans, proposal or as directed by the Engineer.

560-2 MATERIALS. Materials shall meet the requirements specified in the following sub sections of

700 - Materials: Split Faced Concrete Brick 704-10 Precast Concrete Coping 704-11 Caulking Compound for Structures 705-06 Premolded Resilient Joint Filler 705-07 Masonry Mortar 705-21 Bar Reinforcement - Grade 60 709-01 Wire Fabric for Concrete Reinforcement 709-02 Admixtures 711-08

560-2.01 Dimension Stone Masonry. All stone shall be sound, durable, free from reeds, rifts, seams,

laminations and minerals which would cause discoloration or deterioration from weathering. The stone shall be of size, quality and color acceptable to the Regional Director. Duplicate sa mples of stone

560-2 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 showing the complete color range shall be submitted to the Regional Director for approval. Stone shall be quarried so the stratification will be radial or parallel to the bed when set in place except where split face or seam face finish is called for on t he plans. All beds and joints shall have a "Fine Point or Sawn Finish" for at least 2 inches from the arris lines. The balance shall not fall off from a straight line for more than 1/6 of the stone's minimum dimension. When stones project beyond adjoini ng faces, the fine pointing shall be carried at least 2 inches in from the adjoining surfaces (arris lines of stone or face of concrete). Soffits of ring stones shall be cut to the curve of the arch and shall have a “Fine Point or Sawn Finish” unless otherwise shown on the plans. All other showing surfaces shall be finished as indicated on the plans. On square bridges and on bridges where the skew is 30 degrees or less, the ring stones shall be cut so the joint sides are parallel to the faces of the abutments. On bridges with a skew greater than 30 degrees the ring stones shall be cut so the joint sid es of each stone will be at right angles with the face. Soffit joints shall lie in a horizontal plane. “Fine Point or Sawn Finish” shall be as described in §560 -2.07, Definition of Finishes.

560-2.02 Split Faced Concrete Masonry. Split faced concrete masonry units shall be new, sound,

durable, true to size, free from laminations and cracks, and uniform quality which complies with the requirements of §704 -10. All split face concrete masonry units delivered to the site shall be o f the sizes necessary to produce the wall pattern as indicated on the plans. An approved mechanical self -leveling splitting machine with two steel knives, one directly above the other will be used for all field splitting. Four samples of each thickness of each split faced concrete masonry unit shall be submitted to the Engineer fo r tentative approval. They shall be labeled with the contract title and number, the Contractor's name, and manufacturer's name. The split faced concrete masonry units used in the work shall be equal in all respects, color, quality, texture and surface to the approved samples. Anchors shall be a metal slot formed from sheet zinc not less than 0. 025 inches in thickness, bent to form a dovetail channel 5/8 inch wide at the front, 1 inch wide at the rear, 1 inch deep and with wings 1/8 to 1/4 inch wide. The slots shall be provided with a felt insert to prevent the entrance of fresh concrete. These inserts shall be removed just prior to the insertion of the ties. Ties shall be formed of zinc not less than 0.078 inches thick, 1 inch wide with one end designed to fit snugly into th e anchor slots and shall be crimped with corrugations 1/8 inch deep, but no less than 1/16 inch deep. The ties shall be at least 4 inches long. The Contractor shall submit to the Engineer for tentative approval four samples of the material used to fabricate the ties, i.e. anchors, felt and ties.

560-2.03 Stone Masonry. All stone shall be sound, durable, properly quarried, free from reeds, rifts,

seams, laminations and minerals which would cause discoloration from weathering. Samples of stone shall be submitted to and be approved by the Regional Director prior to the b eginning of any work on this masonry. The size, color and quality of the stone delivered to the site shall be substantially in accordance with the approved samples. The stones may have an average variation of 1/6 of the thickness shown on the plans, however, they shall have a minimum thickness of at least 2/3 that shown on the plans and a maximum thickness of 1/6 over the maximum thickness shown on the plans.

560-2.04 Rubble Stone Masonry. All stones shall be clean, free from structural defects and acceptable

to the Engineer. Selected stones, roughly squared and pitched to line, shall be used at all angles and ends of walls.

560-2.05 Precast Concrete Coping. Precast concrete coping units shall be new, sound, durable, true to size,

free from laminations and cracks and of uniform quality which complies with the requirements of §704 -11.

560-2.06 Mortar. Use 705 -21 Masonry Mortar.

560-2 07

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 560-2.07 Definition of Finishes. Finishes of stone or manufactured masonry units shall be defined as shown in Table 560 -1.

560-3 Construction Details

560-3.01 General. Masonry or precast concrete coping shall not be constructed when the ambient

temperature is 40°F or below, or when the stone or masonry units contain frost, except by written permission of the Engineer and subject to any conditions the Engineer may require. Stone, masonry units or coping units shall not be dropped upon or slid over existing masonry, nor shall hammering or turning of stones, masonry units or coping on the masonry be allowed. Stones, masonry unit or coping units shall be carefully set without jarring masonry already laid, and they shall be handled in a manner so as not to cause disfigurement. TABLE 560 -1 MASONRY UNITS, SURFACE FINISH Finish Name Maximum Surface Projection Beyond Pitch Lines Smooth Finish 1/16 inch Fine Point or Sawn Finish 1/4 inch Rough Finish 1/2 inch Scabbed Finish 3/4 inch Seam and Split Face 1 inch Rock Face 1/10 the vertical height of the individual stone Thermal Finish 1/4 inch NOTE: All faces of Dimension Masonry shall extend to the pitch lines shown on the plans.

560-3.02 Dimension Stone Masonry. The provisions of §560 -3.01 shall apply with the following

additional requirements:

A.Preparation of Stone and Bed. Each stone shall be cleaned and thoroughly saturated with water before being set. The bed which is to receive the masonry shall also be cleaned and moistened.
B.Bedding of Stone. All stone shall be well bedded in mortar and settled in place with a suitable wooden maul before the setting of the mortar.
C.Spalls not Permitted in Mortar Beds. No pinning up of stones with spalls will be permitted, and no spalls will be permitted in beds.
D.Expansion Joints. All surfaces of stone in contact with expansion joint material shall be made smooth, unless otherwise shown on the plans. The joints shall be filled with premolded resilient joint filler and sealed with an approved joint sealer as shown on the plans, o r as ordered by the Engineer. All joints in concrete backing shall be protected against intrusion of water into or through the joint by the installation of an approved water stop. The water stop shall be embedded into the concrete at least 3 inches on each side of the joint and shall be installed as near to the inside face of the concrete backing as practicable. The water stop may be of ASTM B370, 20 ounce preformed copper strip, 0. 025 inch minimum thickness, soldered to be water tight and continuous, or may be approved flexible water stop as shown on the plans. Water stops shall be manufactured and installed so as to provide for the expansion and contraction movements present at the joint. In case any stone is moved or the joint broken, the stone shall be taken up, the mortar thoroughly cleaned from beds and joints, and the stone reset in fresh mortar.

560-3 03

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Joints shall not be filled by pouring in a thin or liquid mortar.

E.Pointing (new construction) and Tuck Pointing (raking out and repointing).
1.Pointing. Tool the face joints with a pointing tool before the mortar sets, as approved by the Engineer. Avoid smearing the masonry surfaces with excess mortar forced out of the joints. For joints not pointed when the masonry is laid, prepare the joints for poin ting by following the tuck pointing procedures. There will be no separate payment for this work.
2.Tuck Pointing (Repointing). Repoint the joints in masonry where indicated on the Contract plans or directed by the Engineer. Use an Item 705 -21 Type M, S or N masonry or mortar cement, tuck pointing mortar (or a specially designed one) with the same or weaker strength than the ori ginal mortar, as approved by the Engineer. Remove soft, loose, cracked and deteriorated mortar to a minimum depth (measured from the wall face) of twice the average joint width, and remove all deteriorated mortar beyond the minimum depth, as ordered by the Engineer. Do not damage the masonry durin g the removal process. Clean all contamination from the prepared joints. Prior to repointing, flush with water and leave all surfaces to be re -mortared in a dampened, surface dry state. Pack the prepared joints in layers with mortar that closely matches the original color and texture, allowing each layer to become thumb -print hard befo re the next. Use at least two layers when the joint depth is twice the joint width. Apply a final layer thickness that does not exceed the joint width. When the final layer is thumb -print hard, finish with a pointing tool that recreates the original joi nt shape, or as approved by the Engineer. Perform pointing when the ambient temperature is 40°F or above, and the masonry is frost free. Avoid recessed joints that hold water. After the mortar sets, clean all mortar and cement stains from other surfaces. In direct sunlight, keep the newly pointed masonry moist for at least 3 days. In shade, moisten 2 to 3 times a day for at least 3 days.
F.Drawings. The contract plans show the general character of the masonry. Prior to the beginning of any work, the Contractor shall prepare and submit for the approval of the Regional Director, three sets of detail plans for all dimension masonry shown on the plans . The Contractor shall carefully check and assume full responsibility for the accuracy of this work. These detail plans will be examined and either approved or returned without approval to the Contractor, who shall check the indicated correct ions and resubmit two sets of prints of revised details. When the detail plans have been approved, the Contractor shall furnish the Regional Director with three sets, one of which shall be reproducible. The drawings shall conform to the size and type of requirements for Shop Drawings set forth in the New York State Steel Construction Manual.

560-3.03 Split Faced Concrete Masonry. The provisions of §560 -3.01 shall apply with the following

additional requirements:

A.Sample Wall. The Contractor shall construct a split faced concrete masonry wall 6 feet long and 4 feet high of approved units and matching mortar at a location designated. This procedure shall be repeated until a sample wall is approved by the Engineer. The approved sample wall shall be maintained intact until the Engineer directs its removal. In lieu of the field sample wall, the Contractor may show, for approval, a building constructed with units of the same type, color, texture and surface finish required. The field sample wall shall be required if the building masonry is not approved. Upon approval of the sample wall or building, the Contractor shall furnish and lay split masonry to conform with the approved sample wall.

560-3 03

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 B. Protection and Handling. Split faced concrete masonry units shall be protected by a wrapping of 4 mil polyethylene, and shall be handled on pallets by mechanical means, or by hand or tongs. Dumping of the masonry units from trucks, wheel barrows or other conveyances is prohibited. Particular care shall be taken to protect all edges and the face of the m asonry units. Distorted, laminated, checked or cracked masonry units will be rejected and removed from the site of construction. On delivery to the site, the masonry units shall be neatly piled off the ground, on pallets or other approved implements, and protected from moisture by wrapping them with 4 mil polyethylene. Masonry units which become wet, shall not be laid in the wall until their conformance with the specifications for §704 -10 is shown by tests. The cost of these tests shall be borne by the Contractor.

C.Laying. The split faced concrete masonry shall be laid up, in the pattern shown on the plans, by skilled masons and in a first -class manner. The masonry shall be laid true to line and grade in level horizontal beds and be properly anchored. Each masonry unit s hall be laid in a full mortar bed and in a manner to form a full end joint in one operation. The space between the split face masonry and the supporting concrete shall be filled with mortar and rodded until the mortar rises to the top of the masonry unit as each unit is placed.
D.Bonding. The split faced concrete masonry shall be bonded to the supporting concrete. Dovetail anchors shall be continuous, set vertically and spaced on centers not exceeding 1 foot on the concrete walls. Ties shall be installed in the anchor slots at a maximum vertical height of 1 foot on centers.
E.Joints. Joints in the exposed face shall be struck with a concave jointing unless otherwise specified. The joints shall be 3/8 inch wide and the concave jointing shall be 1/8 inch deep at the center.
F.Protection Against Weather. The split faced concrete masonry shall be protected against the action of the weather. The tops and at least 2 feet down the sides of all walls not completed shall be constantly protected with suitable waterproof covering properly secured in place during periods of suspended work. The facing shall be so protected until it has been bonded to the concrete wall and compl etely sealed against moisture. During hot dry weather, the masonry shall be protected from the sun and kept moist for at least three days after completion.
G.Protection Against Damage. Projections and angles exposed to damage shall be boxed or otherwise protected to prevent damage. Any units damaged during the progress of the work shall be replaced with new units at the Contractor's expense.
H.Cleaning of Exposed Faces of Mortar and Drippings. Exposed faces of split faced concrete masonry units shall be cleaned free of excess mortar and mortar drippings, as the work progresses, to prevent excessive rubbing during final cleaning operations.
I.Expansion and Contraction Joints. Expansion and contraction joints shall be constructed as shown on the plans. The surfaces of the joints shall be plumb, true to line and smooth to the caulking compound.
J.Final Cleaning. After the completion of adjacent work likely to soil the masonry, the split faced concrete masonry shall be thoroughly cleaned, removing all dirt, dust, mortar, stains, etc. The concrete masonry shall be brushed, while dry, with stiff fiber brushes. I f this brushing does not clean the masonry to the satisfaction of the Engineer, then the Contractor shall clean the facing with soap powder in clean water applied with stiff fiber scrub brushes. After scrubbing with soap and water the Contractor shall rinse the masonry with clean water. The Contractor may, with the Engineer's

560-3 04

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 approval, substitute a cleaning solution that will not harm the concrete or mortar joints. The cleaning operation shall in all cases start at the top and proceed downward.

K.Caulking. When the split faced concrete masonry has received the final cleaning, all expansion and contraction joints shall be filled at least 1 inch deep with caulking compound. All surfaces to receive the caulking compound shall be clean, free of loose materials, dirt, dust, frost, moisture, oils, laitance or curing compounds and shall be primed with clear lacquer, shellac or the manufacturer's recommended primer after the surfac es have been cleaned. A bond breaker shall be used as a release material back of the caulking compound. The bond breaker may be polyethylene, specially treated bond inhibiting pressure sensitive tape or any approved equal. The caulking compound shall be tooled with a concave joint finishing tool to provide a neat smoothly finished joint of uniform width. Where solvents are required on the jointing tool, they shall be as recommended by the manufacturer of the caulking compound.

560-3.04 Stone Masonry. The construction provisions of §560 -3.02 shall apply. The individual stones

shall be trimmed, recut and dressed, as may be necessary at the site, to obtain a pattern in the finished wall which will be in character with the requirements of drawings, spe cifications and the approved sample wall. The following general requirements will apply to the placing of stone masonry:

A.Cross -Joints, Steps or Ladders. There shall be no cross -joints, steps or ladders.
B.Subdivision of Rectangles. There shall be no subdivision of rectangles.
C.Stone Shapes. There shall be no unusually shaped stone.
D.Clusters. There shall be no clusters of stone of the same length and height.
E.Horizontal Joint Length. There shall be no continuous horizontal joint greater in length than 10 feet .
F.Vertical Joints. There shall be no more than five stones abutting any one vertical joint.
G.Stone Proportions. There shall be no stone longer than six times its height nor shorter than one and one half times its height. The length of the average stone shall be three to five times its height.
H.Horizontal Joints. Horizontal joints shall not have a slope varying from the horizontal by more than one percent.
I.Color. Where stone masonry and dimension masonry are specified, for the same structure or in close proximity to each other, there shall be no great contrast in size or color between the Stone Masonry and the Dimension Masonry. Prior to beginning the work the Contractor shall lay up a sample wall conforming to the requirements of §560 -3.03A except that the material details for the work shall conform to those for Stone Masonry.

560-3.05 Rubble Stone Masonry. The provision of §560 -3.01 shall apply with the following additional

requirements: The stone shall be laid to form substantial masonry presenting a neat, finished appearance. The minimum size of stone to be used shall be 4 inches in depth or rise, 9 inches in width, and 12 inches long. Spalls and pinners will not be allowed to show on the face of the work and shall be used otherwise only where necessary. All stones shall be soundly and completely bedded in the mortar. The length of stretchers shall not exceed three times their rise, and the width of stretchers shall in no case be less than

560-3 06

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 one and one -half times their rise. At least one -fourth of the stones in the face shall be headers and shall be evenly distributed. The length of headers shall be not less than 32 inches nor more than the thickness of the wall, where the work is 4 feet or less in thickness. Where the work is more than 4 feet thick, the length of headers shall be not less than 32 inches . The width of headers shall be not less than their rise. All stones shall be laid to break joints 6 inches or more and to thoroughly bon d the work. No joint in the face shall be over 1 inch in width. Backing shall be good -sized, well -shaped stones so laid as to break joints. Spaces between stones shall be filled with spalls set in mortar. The degree of roughness of exposed faces shall be measured with a 6 foot straight edge supported between adjacent projections on the stone face. Variations in the stone face, in excess of 4 inches , measured from the straight edge to the extreme depression in stone or mortar will not be permitted. Rear faces shall present approximately plane surfaces. Pointing shall conform to the requirements of §560 -3.02E.

560-3.06 Rubble Stone Masonry Laid Dry. The specifications of §560 -3.05, Rubble Stone Masonry,

shall apply except that no mortar shall be used and the requirements of §560 -3.01 Construction Details (General), pertaining to frost shall not apply unless otherwise directed by the Engineer.

560-3.07 Precast Concrete Coping. The provisions of §560 -3.02, Dimension Stone Masonry and §560 -

3.03, Split Faced Concrete Masonry, shall apply with exception of §560 -3.02D, §560 -3.03A, and §560 - 3.03D.

560-3.08 Tuck Pointing. Apply the provisions of §560 -3.02E2 Tuck Pointing. For re -caulking work,

rake out any old caulking to a minimum 1 inch depth and follow the provisions of §560 -3.03K. Caulking. Do not damage masonry during the removal and cleaning process.

560-4 Method of Measurement

560-4.01 Dimension Masonry. Dimension masonry will be measured as the number of square feet

(including joints within the dimension masonry) measured on the plane of all the exposed surfaces of the dimension masonry incorporated in the work.

560-4.02 Split Faced Concrete Masonry. Split faced concrete masonry will be measured as the number

of square feet (including joints within the masonry and between the split faced concrete masonry and the concrete wall, and the mortar bed for precast concrete coping), on the plane of all exposed surfaces of the masonry incorporated in the work. Split faced masonry be low the finished surface of the ground or paving shall be considered as exposed in computing the area for payment. The approved, constructed, split faced concrete masonry sample w all will be paid for as split face concrete masonry.

560-4.03 Rubble Stone Masonry. Payment for rubble stone masonry will be made for the number of

cubic feet within the payment lines shown on the plans and placed in accordance with the specifications. Concrete, mortar or any joint material within these payment lines will, for the purpose of payment, be classified as stone masonry and will not be paid for unde r any other item.

560-4.04 Stone Masonry. Payment for stone masonry will be made for the number of square feet

(including joints within the stone masonry) measured on the plane of all the exposed surfaces of the stone masonry incorporated in the work. Mortar joints between concrete and stone masonry will be paid for as stone masonry. Stone masonry shown on the plans below the finished grade or sidewalk (to prevent the possible exposure of unfaced concrete) shall be considered as exposed in computing the payment area for this item. Thirty square feet will be used in payment for the complete accepted sample wall required in this specification.

560-4 05

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 560-4.05 (Vacant)

560-4.06 Precast Concrete Coping. The quantity to be paid for will be the number of feet of precast

concrete coping (including the joints between the coping units) placed in accordance with the plans, specification and orders of the Engineer.

560-4.07 Tuck Pointing. The Engineer will measure this work in the field as the number of square or

linear feet of masonry pointed and cleaned, as bid. Linear measurements will be made along the joint centerline.

560-5 Basis of Payment

560-5.01 Dimension Stone Masonry. The unit price bid per square feet shall include the cost of

furnishing all labor, materials and equipment necessary to complete the work. Concrete, dimension masonry, mortar or any joint material within the nominal thickness of the dimension masonry will, for the purpose of payment, be classified as dimension masonry and will not be paid for under any other item. Projections, if any, into t he concrete beyond the nominal thickness of dimension masonry will be paid for as the class of concrete displaced by the stone. No deduction will be made for railing post holes. Mortar Joints between Dimension Masonry and Concrete will be paid for as Dimension Masonry. Mortar Joints between Dimension Masonry and Stone Masonry will be paid for as Stone Masonry.

560-5.02 Split Faced Concrete Masonry. The unit price bid per square feet shall include the cost of

furnishing all labor, materials (including anchors, ties, premolded bituminous joint material, and caulking compound) and equipment necessary to complete the work. The payment shall also include the labor, materials and equipmen t necessary to remove and dispose of all constructed sample masonry panels when directed by the Engineer. No payment shall be made to the Contractor for the submitted alternate sample walls or for any unapproved sample walls. The cost of furnishing and placing anchoring devices shall be included in the unit price bid for this work. The cost of erecting and disposing the sample wall shall be included in the unit price bid for this item.

560-5.03 Stone Masonry. The unit price bid per square feet shall include the cost of furnishing all labor,

materials and equipment necessary to complete the work. Concrete, stone masonry, mortar or any joint material within the nominal thickness of the stone masonry will, for the purpose of payment, be classified as stone masonry and will not be paid for under any other item. Projections, if any, into the concrete beyond the nominal thickness of stone masonry will be paid for as the class of concrete displaced by the stone. No deduction will be made for railing post holes. The cost of furnishing and placing anchoring devices shall be included in the unit price for this item.

560-5.05 Rubble Stone Masonry. The unit price bid per cubic feet for Rubble Stone Masonry with

joints or laid dry, shall include the cost of furnishing all labor, materials and equipment necessary to complete the work except excavation will be paid for under the appropriate excavation item.

560-5.06 Precast Concrete Coping. The unit price bid per feet shall include the cost of furnishing all

labor, materials (including anchors, reinforcement, premolded resilient joint materials, and caulking compound) and equipment necessary to complete the work.

560-5.07 Tuck Pointing. Include all labor, material (including any re -caulking material), and equipment

to complete the work in the unit bid price.

560-5 08

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 560-5.08 Progress Payments. Progress payments will be made, at the unit price bid, for 75% of the quantity properly placed. The balance of the quantity will be paid for upon proper cleaning and caulking of the joints. Payment will be made under: Item No. Item Pay Unit 560.01 Dimension Stone Masonry Square Foot 560.02 Split Faced Concrete Masonry Square Foot 560.0401 Stone Masonry Square Foot 560.05 Rubble Stone Masonry Cubic Foot 560.06 Rubble Stone Masonry Laid Dry Cubic Foot 560.07 Precast Concrete Coping Foot 560.08 Tuck Pointing Foot 560.09 Tuck Pointing Square Foot SECTION 561 (VACANT) SECTION 562 - REINFORCED CONCRETE THREE -SIDED STRUCTURES

562-1 DESCRIPTION. The work consists of designing and constructing reinforced concrete three -sided

structure(s) at the location(s) indicated on the Plans. A reinforced concrete three -sided structure is composed of some of the following discrete elements: • Span Unit • Span Unit Footing • Wing Wall with Footing • Headwall • Invert Slab with Cut -off Wall • Apron with Cut -off Wall NOTE: Any of the above elements may be cast in place at no additional cost to the State.

562-2 MATERIALS. Materials for all precast concrete components shall meet the requirements of the

PCCM. Materials for cast -in-place concrete shall be Class HP or Class HPIC concrete meeting the requirements of §557 and modified to include corrosion inhibitor meeting the re quirements of §711 -13. The penetrating type protective sealer shall meet the requirements of §717 -03. Reinforcement shall meet the requirements of §556.

562-3 Construction

562-3.01 Design. An appropriate structure design and all details necessary for construction meeting the

Design parameters given in these specifications shall be developed and submitted to the DCES for approval. All design work, detail development, and proposed handling and installation procedure development, shall be done by a Professional Engineer. The design submittal and the fabrication of the units shall conform to the requirements stated in the PCCM. The DCES reserves the right to reject a proposed de sign(s) if the structure type is determined to be unsuitable for the proposed application based on safety, durability, serviceability, or maintainability

562-3.02 Design Parameters. The design of the structure(s) described above shall meet the following:

Source: New York Standard Specifications, 2024 Edition. Pages 337344 of 1,264.