569-1DESCRIPTION
569-1.01Work. The work shall consist of constructing concrete traffic barrier, of the configuration and
at the locations indicated on the Contract Plans.
569-1.02Methods. Construction of the barrier shall be accomplished by cast-in-place or precast
methods. Slip forming will be allowed as an acceptable cast-in-place method, unless the plans show anchor bolts projecting beyond concrete limits; in this instance slipforming procedures will require the approval of the DCES. 569-1.03 364
569-1.03Shape Modification. The barrier shape indicated on the plans shall not be altered. Minor
modifications, to allow slip-forming, will be submitted to the Regional Construction Engineer for approval.
569-1.04Approvals. For approval requirements and procedures refer to the Construction Details
569-2MATERIALS
569-2.01Fabrication. Materials used for traffic barrier fabrication shall meet the following
requirements: Precast Concrete Barrier 704-03 and 704-05 Cast-In-Place Concrete (Constructed Forms) 501 & MP 501-2, Table 2 Cast-In-Place Concrete (Slip Formed) 501 & MP 501-2, Table 2 Epoxy Coated Reinforcing Bars 709-04 Steel Tubes ASTM A500, Grade B Steel Plates, or Bars ASTM A36 or A588 (A709 Grade 36 or 50W) Anchor Bolts (Fully Threaded) ASTM F3125 GRADE A325 or A449 Type 1 Nuts ASTM A563, Class 10S HH Washers ASTM F436, Type 1 or 3 Concrete Grouting Material 701-05 Concrete Repair Material 701-04 Concrete Repair Material - High Early Strength 701-12 Joint Filler ASTM D1056, Grade 2B1 or 2B2. Curing Compound 711-05 Locking and anchoring devices for precast units 715-01 and 709-04, as applicable Galvanizing 719-01 All steel, except reinforcing steel, shall be galvanized. Materials Procedure (MP) 501-2 Mix Design and Approval Procedure for Performance Engineered Mixtures – Structural Concrete.
569-2.02Fabrication Tolerances. All cast-in-place concrete barrier, regardless of the method of
construction, shall conform to the following finished tolerances: Bar Reinforcement Cover -0 , + 1/2 inch Width (Top) -0 , + 1/4 inch Width (Bottom) -0 , + 1/2 inch Surface Straightness 1/2 inch in 20 feet (Deviation from theoretical centerline) Vertical Alignment 1/2 inch in 20 feet (Deviation from a line parallel to the theoretical grade line) Horizontal and Vertical Misalignment 3/16 inch (between adjacent precast units) All precast concrete barrier shall conform to the tolerances contained in §704-03, §704-05 and to the foregoing misalignment tolerance. Reinforcement cover shall be verified while the concrete is still plastic, except in the case of cured precast units. In that case, cover will be verified in accordance with established Department procedures. These procedures may include coring. 569-3.01 365
569-3CONSTRUCTION DETAILS
569-3.01Approvals
three copies of pertinent details and necessary design computations. Every effort will be made to render a decision, in a timely manner, after all pertinent information has been received. However, the time required to render a determination will not be taken into account should the Contractor request an extension of time.
award in order to be used in the contract.
569-3.02General: Cast In Place Concrete
vacuumed to remove any dirt or other foreign substances, laitance or partially loose chips of concrete.
in the barrier shall be repaired. Major defects shall be cause for rejection of the section. Such rejected sections shall be removed and replaced or, upon approval of the Engineer, the section shall be repaired to the satisfaction of the Engineer.
or less, in diameter, and which do not expose the outermost surface of the steel reinforcement. Surface voids 5/8 inch, or less, in diameter, and 1/4 inch, or less in depth are not considered defects. They do not require repair.
a minor defect.
the barrier section.
repair shall be acceptable to the Engineer. The color of the repaired portion shall match, as nearly as practicable, the color of the surrounding concrete. Repaired portions shall exactly match shape requirements. The repaired portion shall withstand a moderate blow from a 16 ounce hammer. Repair shall be done at no cost to the State.
569-3.03General: Precast Concrete. The definition of defects and the repair requirements contained in
704-03 shall apply.
569-3.04Cast-In-Place Concrete - Constructed Forms. The requirements of Section 555 and Section
556 shall apply with the following modification: Thoroughly wet the structural slab surface and all porous surfaces to be in contact with new concrete for at least 12 hours immediately prior to placement. Remove all standing water with oil-free compressed air, and protect the surfaces from drying, so the concrete remains in a saturated surface dry condition until 569-3.05 366 placement of the new concrete. If the forms are removed before seven curing days have passed, the concrete shall be cured by means of a clear curing compound. No curing blankets will be required. Curing compound shall be sprayed on the concrete surface immediately following the slipforming and hand finishing operations. The compound shall be applied by means of pressure spraying or distributing equipment at the rate directed by the Engineer, but not less than 1 gallon per 150 square feet of surface. The equipment for applying the compound shall be such that the compound is applied as a fine spray with no surface damage to the concrete. The equipment shall also provide adequate agitation of the compound during application, and shall be approved by the Engineer before work is started. Should the method of applying the compound produce a non-uniform film, or should the spraying equipment fail and duplicate equipment not be immediately available, the application of curing compound shall be discontinued immediately and the curing shall be accomplished by another method acceptable to the Engineer. The Contractor shall stockpile sufficient approved coverings for protection of the concrete in the event of rain, non-uniform film application, or breakdown of spray equipment.
569-3.05Cast-In-Place Concrete - Slipformed. The requirements of Section 555, Section 556 and the
following, shall apply:
Engineer. The requirements of 555-3.03 shall not apply. Thoroughly wet the structural slab surface and all porous surfaces to be in contact with new concrete for at least 12 hours immediately prior to placement. Remove all standing water with oil-free compressed air, and protect the surfaces from drying, so the concrete remains in a saturated surface dry condition until placement of the new concrete.
placed in the area of the barrier, the Contractor shall perform a "dry run" over the entire length of the barrier installation location. It is necessary only to "dry run" a single day's placement during any given day; however, the entire barrier length shall be traversed. The "dry run" may be made with either the actual slip forming equipment, or with an exact "mock-up" of the equipment. The "mock-up"; if utilized, shall be the exact size, shape and dimensions of the slip forming equipment. It shall be a minimum of 4 feet long. Its movement shall be able to be correlated with a string, or survey, line indicating the correct offset location of the barrier.
the slip-forming equipment shall be demonstrated for capability. The demonstration shall be done in the presence of the Engineer. The Contractor shall make all adjustments, or alterations, to ensure that the equipment has the capability to produce an acceptable product. No work shall be done without the Engineer's approval. The capability demonstration will be required only once for each piece of forming equipment used on the project.
responsible for meeting the tolerances given under MATERIALS, 569-2.03. Fabrication Tolerances. Sections which do not meet tolerance requirements are subject to removal and replacement at no cost to the State, at the discretion of the Engineer.
Mixed and Transit Mixed Concrete respectively, except that water may be added to the mixture one additional time at the point of deposition to maintain the desired slump. The water addition may be made anytime after the beginning of discharge until approximately two-thirds of the load, as determined by the Engineer, has been discharged. After the water addition, the concrete shall be 569-3.06 367 mixed at least 30 revolutions in the mixing range. When the water addition is made after discharge the total number of revolutions shall not be more than 190. Truck Mixed Concrete. The provisions of §501-3.03 E shall apply except that after initial slump has been achieved, water may be added to the mixture one additional time to maintain the desired slump. The water addition may be made anytime after the beginning of discharge until approximately two-thirds of the load, as determined by the Engineer, has been discharged. After the water addition, the concrete shall be mixed at least 30 revolutions in the mixing range.
placement is interrupted, for any reason, the placement shall be protected from drying by several layers of wet burlap. A construction dam, or bulkhead, shall be installed if the interruption exceeds 30 minutes. If the interruption exceeds 90 minutes, further placement shall be discontinued. Concrete placement at this location may then resume only after 12 hours, measured from the time of delay, has elapsed.
length of placement between the bulkhead and the next joint is such that, in the opinion of the Engineer, it may not be slipformed, the Contractor shall form the section by methods other than slipforming.
concrete, shall be made in the following manner. The set concrete shall have its surface cut to remove all loose, and otherwise unsatisfactory materials. Tools used for this purpose shall be approved by the Engineer, prior to use. The surface shall be scrubbed with wire brooms and shall be kept wet until new concrete is placed.
surfaces. Hand finishing, if done, shall be done immediately after the passage of the slipforming equipment. Curing compound shall be applied only after hand finishing has been completed at any particular location.
of 569-3.04.
Plans. If sawcutting methods are employed the following requirements shall apply:
the structural slab shall be hand tooled immediately after finishing.
soon as no damage to the concrete will result with a maximum time of 8 hours. The clear curing compound shall be reapplied at the sawcut.
569-3.06Precast Concrete
569-3.07 368
conform to the definition of minor defects as given in §704-03 shall be repaired in accordance with the requirements of that subsection. After the inspection for defects has been completed, the contact surface of all precast barrier shall be sandblast cleaned in accordance with the requirements of §584-3.02A, and §584-3.02C. After sandblasting operations are completed the surfaces shall be thoroughly vacuum cleaned.
barrier will be placed for at least 12 hours immediately prior to placing the grout bed. Remove all standing water with oil-free compressed air, and protect the surface from drying, so the surface remains in a saturated surface dry condition when placing the grout bed. All precast barrier shall be installed on grout beds conforming to the requirements of §701-05 as modified herein. The exact bedding placement requirements shall be established by the barrier system manufacturer. However, no grout bed shall be greater than 1/2 inch in thickness after the barrier has been installed in its permanent position. All grout bedding material shall be tooled flush with the barrier edge. Care shall be taken to prevent grout from setting prior to barrier unit installation. If, in the opinion of the Engineer, the grout has set, or has begun to set, it shall be removed. No retempering will be permitted. The affected installation area shall be thoroughly cleaned of grout, by methods acceptable to the Engineer, and new grout shall be placed, all at no additional cost. All vertical adjustments shall be made by the addition, or removal, of grout. No wedges will be permitted. Lifting of the barrier which, in the Engineer's opinion, will result in permanent voids occurring between the barrier unit and the grout bed, will not be permitted.
Grade 2B1 or 2B2 and shall be installed in the manner indicated on the approved precast barrier system drawings.
or replaced, as determined by the Engineer. Repair or replacement shall be done at no cost to the State.
by one of two methods:
go completely through the underlying support. Bolt installations will be subjected to load testing acceptance requirements.
method will go completely through the underlying support. Bolt installations will not be load tested.
569-3.07Requirements for Method permitted under §569-3.06E1
accordance with the grout manufacturer's instructions. If reinforcing steel is encountered, the reinforcing shall be cut and removed by means of a core drill. If approved by the Engineer, hole locations may be moved to avoid encountering reinforcing steel. The remainder of the drilling shall be done by rotary impact drill. Drilling with a lubricant will not be permitted. Water use is permissible. Concrete spalled, or otherwise damaged by the contractor's operations shall be repaired, in a manner approved by and, to the satisfaction of the Engineer, at no additional cost. 569-3.07 369
anchor bolt shall be in accordance with Table 569-1. The Contractor may increase the embedment length beyond that shown on the Plans or specified in the above table provided 1) the increase is done at no additional cost to the State and 2) the hole stops at least 2 inches from the bottom of the structural slab. TABLE 569-1 MINIMUM EMBEDMENT AND REQUIRED TEST LOAD Nominal Anchor Bolt Diameter (inches) 1/2 9/16 5/8 3/4 7/8 1 1 1/8 1 1/4 Embedment Length
Test Load (kips) 11 14 17 25 35 45 50 65
products which promote the corrosion of steel. When cured, the material shall exhibit a maximum loss of four percent (4%) when tested for freeze-thaw resistance. Freeze-thaw testing will be done in accordance with Materials Test Method 502-3P, except that the material will be subjected to 50 cycles of testing. Cured material shall not be reactive with salt water, portland cement, or petroleum products. The contractor shall supply the Engineer with two copies of the grout manufacturer's certification that the material meets the foregoing requirements.
bolt, all excess grout shall be struck-off flush with the concrete face. Should the grout fail to fill the hole, additional grout shall be added to the hole to allow a flush strike-off.
testing. The first lot shall consist of the first 10 grouted in anchor bolts. The remaining lots shall be defined by the Contractor subject to the following:
Unless otherwise specified in the Contract Documents, the minimum load applied during the load testing shall be in accordance with Table 569-1. Table 569-2 shows the lot size (column L), the initial number of anchor bolts selected for testing (column N1) and the number of anchor bolts selected for additional testing (column N2). TABLE 569-2 SAMPLING PLAN FOR ANCHOR BOLT PROOF LOAD TESTING Lot Size L Initial Sample Size N1 Additional Test Sample Size N2
1-30All the bolts in the lot ---
31-50 30 --- 51-75 38 --- 569-3.08 370 76-100 44 21 101-200 49 26 201-300 50 30 301-600 55 30 NOTES:
shall be tested.
additional N2 anchor bolts for testing. If none of the N2 anchor bolts fail the load test, the lot shall be accepted. If any of the N2 anchor bolts fails the load tests all of the anchor bolts in the lot shall be tested.
the lot shall be tested. Anchor bolts shall be deemed to pass if the specified test load is attained without permanently displacing the anchor bolts. THIS LOAD TESTING SHOULD BE NON-DESTRUCTIVE. LOADING SHOULD BE STOPPED AS SOON AS THE MINIMUM ACCEPTABLE PULL- OUT RESISTANCE IS ATTAINED.
couplers to connect the jack to the anchor bolts, and safety devices. Prior to starting the testing, the Contractor shall supply the Engineer with a certificate of calibration for the jack less than 6 months old. Supports for the frame used to distribute the jack load shall be located outside a circle centered at the anchor bolt and of a diameter equal to 2 inches plus twice the anchor bolt embedment length but need not exceed 2 feet. The frame and jack shall be positioned so that the load is applied along the centerline of the anchor bolt. Chains or cables shall be used to connect the various pieces of the tensioning system so that free projectiles will not be created by a failure of an anchor bolt anchorage, coupling or other portion of the tensioning system.
foregoing requirements at no additional cost.
569-3.08Requirements for Method permitted under §569-3.06E2
accordance with the grout manufacturer's instructions unless otherwise modified by the contract documents.
place such that it will remain vertical during subsequent grout placement. The method of bolt retention shall be such that the grout will be held within the hole until setting is complete. Barrier units mechanically anchored to the underlying support by means of bolting shall be grouted into place in accordance with the following:
copies of the manufacturer's instructions shall be delivered to the Engineer a minimum of two weeks prior to the beginning of barrier installation work. 569-3.08 371
F and is predicted to rise. No grout shall be placed if the ambient air temperature falls below 45 F, unless external heat has been provided in the manner required by §555-3.08. The underlying support may be used as the floor of the enclosure if the Engineer approves.
by §555-3.08A. After seven curing days have passed, or the grout has reached a minimum compressive strength of 3000 psi, whichever occurs last, the enclosure may be removed. All work of providing external heat shall be done at no additional cost.
569-4METHOD OF MEASUREMENT. The work will be measured as the number of feet of concrete
traffic barrier installed. Measurement will be taken along the centerline of the top of the barrier. No deduction will be made for joints.
569-5BASIS OF PAYMENT
complete the work. This price shall also include the cost of bar reinforcement, drilling, and testing.
after all of the bar reinforcement has been placed and approved by the Engineer. This payment shall include the cost of chairs, supports, fastenings, connections and any splices not specifically indicated on the plans. If the Engineer permits the substitution of larger bars than those specified, or the DCES permits splices not indicated on the plans, the payment will not be increased nor will any extra compensation be considered. The Performance Concrete Quality Units will be calculated in accordance with §501-5, Determination of Quality Adjustment. Payment will be made under: Item No. Item Pay Unit
569.01Permanent Concrete Traffic Barrier for Structures (Full Section) Foot
569.02Permanent Concrete Traffic Barrier for Structures (Half Section) Foot
569.03Vertical Faced Concrete Parapet Foot
569.04Single Slope (Half-Section) Concrete Bridge Barrier Foot
569.05Single Slope (Full-Section) Concrete Bridge Barrier Foot
569.06F-Shaped (Half-Section) Concrete Bridge Barrier Foot
569.07F-Shaped (Full-Section) Concrete Bridge Barrier Foot
569.08Texas Aesthetic Concrete Bridge Barrier Foot569.99
Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier Quality Unit