SECTION 571 - DISPOSAL OF PAINT REMOVAL WASTE (Last Revised January 2019)
571-1 DESCRIPTION. The work shall consist of managing, accumulating, packaging, labeling,
loading, transporting, treating, and disposing paint removal waste.
571-1.01 Paint Removal Waste. Paint removal waste consists of removed paint particles combined with
material used to remove the paint and any organic or inorganic materials from bridge surfaces, by either bridge washing or blast cleaning operations, without use of any added chemical solvents. All testing of the paint removal waste necessary to satisfy the requirements of the waste transporter or disposal facility shall be the responsibility of the contractor.
571-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 Paint removal waste does not include used tyvek suits, respirator filters, tarpaulins or incidental trash. These incidental wastes generated by the Contractor in completing the work are covered by §107-10 Managing Surplus Material and Waste.
571-2 MATERIALS. The Contractor shall use containers or roll-offs acceptable to the Waste Disposal
Facility. The capacity of each container shall be clearly marked on each container in an easily visible location.
571-3 Construction Details.
571-3.01 General. The Engineer will provide the Contractor with the Generator site identification
number(s) issued by the USEPA. All paint removal waste shall be deposited and sealed in containers or roll-offs concurrent with generation. The paint removal waste shall be accumulated in clean, dry, weatherproof, watertight containers or roll-offs furnished by the Contractor and shall not be left exposed to the elements at the end of the working shift. All equipment and containers or roll-offs shall meet the requirements of USDOT for transport. Paint removal waste shall be accumulated, handled, packaged, documented, loaded, transported, treated and disposed in accordance with all applicable Federal and State laws, rules, and regulations.
571-3.02 Paint Removal Waste Composition.
571-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 this composition waste material information has been developed for typical lead-based paint waste.
571-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
571-3.03 Hazardous Paint Removal Waste Containing Lead - Management Requirements.
Employees handling hazardous paint removal waste shall be trained in accordance with 6 NYCRR Part
373-3.2(g) in hazardous waste management procedures including hazardous waste accumulation,
preparedness and prevention, contingency and emergency procedures. The Contractor’s Preparedness and Prevention Plan, Contingency Plan and Emergency Procedures, and Personnel Training Records, as required by 6 NYCRR Part 373-1.1(d)(1)(iii), shall be submitted to the Engineer for acceptance prior to the generation of any hazardous waste. Containers in storage shall be inspected on at least a weekly basis in accordance with 6 NYCRR Part 373-3.9(b)-(d).
571-3.04 Containers and Labeling. No roll-off shall be filled to a capacity in excess of that marked on
the roll-off as the maximum capacity. Once the Engineer determines the quantity within a specific container or roll-off, that container or roll-off shall be properly sealed and not thereafter be tampered with. No additional waste shall be placed in it, nor shall any be removed from it (except for analytical sampling). All containers or roll-offs shall be located in a place secured from traffic and in a manner
571-3 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 acceptable to the Engineer. The Contractor shall take measures to prevent the blowing or dispersion of the waste during each loading operation and while being transported. The Contractor shall label, mark, and placard all containers or roll-offs prior to shipment in accordance with USDOT and NYSDEC regulations. Each container shall have an appropriate label prior to filling with the applicable words identifying its contents as paint removal waste providing the presumed waste classification of hazardous or non-hazardous industrial waste, and indicating the hazard of the contents (RCRA Toxicity). The accumulation start date shall be completed at the time when waste is first deposited into each container. All label markings shall be permanent, printed in English, and displayed on a background of contrasting color un-obscured by other labels or attachments. Labeling shall be located away from other markings that could substantially reduce its effectiveness.
571-3.05 Document Preparation.
571-3.06 Paint Removal Waste Transport. All paint removal waste shall be in transit to the disposal
site from the site of generation no later than 45 calendar days unless otherwise approved by the Engineer, but no longer than 90 days. Any additional required shipment information, including manifest number, shall be entered on the container label(s) prior to shipment offsite. The Contractor shall present evidence that the vehicle that will be used for the shipment is permitted to transport the designated waste in accordance with 6NYCRR Part 364. Conditions for hazardous paint removal waste transporting vehicles to pick up paint waste debris, in bulk, from one or more bridge sites (multiple collection) for delivery to an authorized Treatment, Storage and Disposal Facility (TSDF) include the following:
571-3 07
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
571-3.07 Conditionally Exempt Small Quantity Generator (CESQG) Exemption. Shipments of
non- hazardous paint removal wastes of less than 2000 pounds shipped in a single load may be transported without a waste transporter permit as allowed by the Small Quantity Waste Transporter Exemption at 6 NYCRR Part 364-2.1(b)(5). For activities with generation of hazardous paint removal wastes that meet Conditionally Exempt Small Quantity Generator (CESQG) status (generate less than 220 pounds in any month and store less than 2205 pounds on site at any time), no USEPA ID number is required, the waste can be shipped without a manifest, and a CESQG can self-transport up to 220 pounds of waste in any calendar month to a disposal facility. CESQGs can dispose of their waste at a permitted hazardous waste facility or municipal or industrial solid waste facilities that are permitted to accept that type of waste.
571-3.08 Hazardous Paint Removal Waste Containing Lead Stabilization. Treatment of hazardous
paint removal waste, as required by Federal regulations, is presumed to require stabilization of the waste such as mixing it with portland cement and water at a permitted Hazardous Waste Treatment or Disposal Facility. The stabilized waste shall meet the treatment standards of the Federal regulations prior to disposal in a permitted Hazardous Waste Disposal Facility.
571-3.09 Non-Hazardous Industrial Solid Paint Waste Sampling and Analysis. The Contractor shall
conduct all sampling and analysis as required by the designated authorized disposal facility as soon as feasible upon waste generation at each non-hazardous designated bridge. Sampling shall be conducted by individuals thoroughly trained in sampling protocols, handling and chain of custody procedures, and laboratory requirements. Accepted sampling practices shall be used to obtain representative composite
571-3 10
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 sample(s) as required for the specific analysis to be completed. Each composite sample shall include a minimum of four distinctly different sampling points. Analyses shall be completed at a NYSDOH Environmental Laboratory Accreditation Program (ELAP) certified laboratory using NYSDEC Analytical Services Protocols (ASPs). The analysis must include, at a minimum, the RCRA heavy metals analysis using the Toxicity Characteristic Leaching Procedure (TCLP) and a total weight analysis. If analytical results indicate that the waste is hazardous, the waste shall be disposed of as such and the hazardous waste pay item shall be used.
571-3.10 Waste Disposal Facility.
571-4 Method of Measurement.
571-4.01 Hazardous Paint Waste Containing Lead. The quantity of paint removal waste to be
measured for payment will be in net pounds of waste disposed of, based on disposal facility weight tickets of the waste as manifested, not including the weight of the containers.
571-4.02 Non-Hazardous Industrial Solid Paint Waste. The quantity of paint removal waste to be
measured for payment will be in net pounds of waste disposed of, based on disposal facility weight tickets of the waste as picked up from the site, transported and received at the facility,, not including the weight of the containers.
571-5 Basis of Payment.
571-5.01 Hazardous Paint Waste Containing Lead. The unit price bid per pound of paint removal
waste shall include the cost of all labor, materials, equipment, sampling, testing, and fees necessary to complete the work based on the assumption that treatment by stabilization will satisfy the applicable Federal regulations. Only waste for which manifest copies (not applicable for CESQG exemption) and weight ticket(s) are returned to the Engineer by the Contractor and Disposal Facility will be authorized for payment. If the Department is fined or penalized as a result of the Contractor's performance or lack thereof, in addition to other remedies the Department may possess, said fine or penalty will be deducted from monies due the Contractor.
571-5.02 Non-Hazardous Industrial Solid Paint Waste. The unit price bid per pounds of paint
removal waste shall include the cost of all labor, materials, equipment, sampling, testing, and fees necessary to complete the work. Only waste for which weight ticket(s) are returned to the Engineer by the Contractor and Disposal Facility will be authorized for payment. If the Department is fined or penalized as a result of the Contractor's performance or lack thereof, in addition to other remedies the Department may possess, said fine or penalty will be deducted from monies due the Contractor.
572-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 Payment will be made under: Item No. Item Pay Unit 571.03 Disposal of Hazardous Paint Removal Waste Containing Lead Pound 571.04 Disposal of Non-Hazardous Industrial Solid Paint Removal Waste Pound
Get an email when 571 changes
New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.