576-1 DESCRIPTION. This work shall consist of furnishing and placing scuppers, drainage troughs
and downspout systems for bridge drainage as shown on the plans and in accordance with the specifications.
576-2 Materials
Cast Iron Scuppers ASTM A48M, Class 30 and 715 -05 Fabricated Steel Scuppers (Except Gratings) Plates or Bars ASTM A36 and 715 -011 Tubes ASTM A500, Grade B1 Headed Concrete Anchor Studs ASTM A108, Grade 1015 or 1020 Grating P lates and Bars ASTM A36, A242 ,or A572 , and 715 -011 Bolts and Cap Screws ASTM A307 Grade A Drainage Troughs (PVC) 705-11 Steel For Erection of Trough Bars2(A1, A2) and Plates2(B1, B2, C1 and C2) ASTM A575, Grades 1015 and 1020 Rods ( fully threaded) and Bolts3 ASTM A307 Clamps, Malleable Iron ASTM A47/A47M, Grade 32510 and 715 -09 Ductile Iron Downspout Pipe and Pipe Fittings ASTM A377 (ANSI 21.51)4 Pipe Couplings5 (Ductile Iron or Malleable Iron) ASTM A536 or A47/A47M Grade 32510 Hoppers6 ASTM A36 and 715 -01 Pipe Brackets and Supports ASTM A575, Grade 1015 and 1020 Anchors GSA FS -S-325 Group I, Type I, Class I Nuts and Bolts6 ASTM A307 PVC Downspout Pipe, Fittings and Solvent Cement 706-15 Protective Cover (C ellular Polystyrene) 706-16 NOTES:
1.In addition to the requirements of 715 -01, Structural Steel, the Contractor will be required to furnish the Deputy Chief Engineer (Structures), two (2) certified copies of the records of the chemical analysis of the steel.
2.Bars shall be 5/8 inch diameter. Plates shall be 2 x 1/4 inch .
3.Bolts shall be Slotted Button Head Machine Bolts.
4.All pipe shall be groove cut around the full pipe circumference at both ends. The grooves shall be radius cut in accorda nce with AWWA C606. The grooves shall be such that a keyed housing clamp coupling shall fit into them..The grooves shall be such t hat a keyed housing clamp coupling shall fit into them. Unless otherwise approved, all pipe bends (elbows) shall be of the long radius type.
5.All couplings shall be gasketed, double keyed, housing clamps designed to lock and seal the joint between two grooved pip es, or fittings, when the housing clamp is bolted and tightened in place. The gasket shall be a molded or extruded compound of Butyl or EDPM, suitable for water service.
6.Galvanized in accordance with the requirements of 719 -01. Nuts and bolts shall be galvanized in accordance with 719 - 01,Type II.
576-3 Construction Details
576-3 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 576-3.01 Fabrication
A.Shop Drawings. Shop drawings will not be required for scuppers, drainage troughs or downspout systems.
B.Welding
1.Fabricated Steel Scuppers, Gratings. Welding shall conform to the provisions of the SCM. Weld inspection shall be done in accordance with the requirements of the SCM but radiographic testing will not be required. All groove welds shall be complete joint penetration groove welds unless oth erwise approved by the DCES.
2.Drainage Troughs. Field Welding (by heat) of the polyvinyl chloride trough material shall not be allowed without written permission of the Deputy Chief Engineer (Structures).
C.Galvanizing
1.Scuppers and Troughs. Galvanizing shall conform to the requirements of §719 -01, Galvanized Coatings and Repair Methods. Galvanizing shall be done after all welding and fabrication is completed.
2.Bolts, Fully Threaded Rods and Nuts. All bolts and rods shall have a ANSI B1.13M Class 6H thread. All galvanized nuts shall have a standard oversize tap to allow for the galvanizing on the bolts, rods and nuts.
D.Gratings. Gratings for Types B1 and B2 scuppers shall have a full and even bearing on the underlying surface.
E.Basis of Acceptance. Scuppers, drainage troughs and downspouts shall be accepted at the work site by the Engineer -in-Charge upon certification of the manufacturer that the materials used and fabrication procedure employed conform to the requirements of section 576. The Eng ineer may reject any scupper, drainage trough or downspout system which, in his opinion, exhibits poor quality or workmanship.
576-3.02 Erection of Downspout Systems
A.General
1.Pipe Installation. The pipe shall be laid true to line and grade as shown on the plans or as directed by the Engineer, with joints close and even, so that a true and even surface of invert will be made over the joints throughout its entire length. Horizontal pipe shall be installed so that the minimum slope shall not be less than 1:50. Pipe shall be placed in accordance with the requirements of this specification unless special methods are called for on the plans or in the itemized proposal.
2.Field Testing. Prior to the acceptance of the structure by the Department, the downspout system should be flushed out and tested to insure that it is flowing at full capacity. Any obstruction in the downspout system preventing the free flow of drainage or its operatio n at full capacity shall be removed to the complete satisfaction of the Engineer.
B.Ductile Iron Downspouts
576-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 1. Pipe Supports. Supports for horizontal piping shall be spaced 5 feet maximum. Supports for vertical piping shall be spaced 6 feet maximum.
2.Pipe Joints. All joints in pipe, except when encased in concrete, shall be made with groove type couplings. Pipes encased in concrete shall have joints formed in accordance with the pipe manufacturer's recommendations.
3.Painting. All metal embedded in concrete shall not be painted. All other metallic portions of the downspout system shall be painted in the field in accordance with the requirements of the contract documents. Color shall be as shown on the plans.
C.PVC Downspouts and Protective Insulator
1.Pipe Joints. PVC pipe joints shall be sealed in the following manner: All necessary cuts shall be square and clean from burrs. Mating surfaces of pipe and fittings shall be cleaned with methyl ethyl ketone or acetone prior to solvent cement application. The solven t cement shall be applied as recommended by the manufacturer. The pipe and fitting should be joined with a twisting motion to distribute cement uniformly. The solvent cement manufacturer's recommendations for cure time shall be followed.
2.Protective Insulator. The protective insulator shall be attached to the pipe in such a manner so as to prevent its dislodgement as the concrete is placed. Suitable methods would include taping the joints with a weather resistant tape or bonding with a non -metallic substance.
3.Form Wire. The PVC pipe and its protective insulator shall be held in place by form wire in such a manner as to provide sufficient lateral support to prevent movement as the concrete is placed.
4.Vibrator. Particular caution shall be taken to prevent the vibrator from striking the pipe and its protective insulator during the placing of concrete.
576-4 Method of Measurement
576-4.01 Scuppers. Payment will be made at the unit price bid for each type of scupper furnished and
placed as shown on the plans and in accordance with the specifications.
576-4.02 Drainage Troughs. The trough shall be measured as the number of feet measured along the
center line of each polyvinyl chloride section, furnished and placed as shown on the plans and in accordance with the specifications.
576-4.03 Downspout System. The downspouts will be measured as the number of feet measured along
the center line of pipe between the extreme outer limits of downspouts, including hoppers, furnished and placed as shown on the plans and in accordance with the specifications.
576-5 Basis of Payment
576-5.01 Scuppers. The unit price bid for each type of scupper shall include the cost of furnishing all
labor, equipment and materials necessary to set the scupper to its proper line and grade. No additional payment will be made for furnishing and placing the grating for the Type B1 or B2 scupper.
576-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 576-5.02 Drainage Troughs. The unit price bid per foot shall include the cost of furnishing all labor, materials and equipment necessary to erect the trough and its threaded rod supports as indicated on the plans.
576-5.03 Downspout System
A.General. The unit price bid per foot shall include the cost of furnishing all labor, materials and equipment necessary to erect the pipe and pipe fittings, pipe supports, hoppers, nuts, bolts, washers, to provide cleanouts if indicated on the plans, straps to cap and plug the pipe if necessa ry, and to replace cracked or otherwise defective material necessary to complete the work.
B.Ductile Iron Downspouts. The unit price bid per foot shall also include the cost of furnishing and placing pipe hangers and brackets, grooved type couplings and paint.
C.PVC Downspouts and Protective Insulator. The unit price bid per foot shall also include the cost of furnishing and placing the protective insulator and all adaptor fittings required at the juncture of PVC Pipe and Ductile Iron Pipe.
D.Excavation. All required excavation will be paid for under pay item 206.02 Trench and Culvert Excavation and 206.04 Trench and Culvert Excavation - O.G. Payment will be made under: Item No. Item Pay Unit 576.01 Scuppers (Type A) Each 576.02 Scuppers (Type B) Each 576.10 Drainage Trough Foot 576.2001 Downspout System (Ductile Iron) Foot 576.21 Downspout System (PVC) Foot 576.2201 Downspout System (Ductile Iron and PVC) Foot SECTION 577 (VACANT) SECTION 578 - BONDED CONCRETE OVERLAY FOR STRUCTURAL SLABS
578-1 DESCRIPTION. Prepare the surfaces that will be in contact with slab reconstruction concrete and
place slab reconstruction concrete. Prepare the structural slab surface and place a Class E, bonded concrete overlay.
578-1.01 Scope. Concrete removal work will be paid for under the appropriate item(s). Minimum
thickness of the overlay concrete is 3 inches . Include the cost of any grade changes necessitated by this requirement in the unit bid price for overlay concrete.
578-1.02 Definitions
A.Overlay Concrete. Class E Concrete placed over existing and slab reconstruction concrete.
B.Slab Reconstruction Concrete. Concrete placed completely around the exposed top mat of bar reinforcement. Slab reconstruction concrete will be Class D for Method 1 and Class E for Method 2, as described in §578 -1.03 Placement Methods.