Division 500 — Structures

581Removal of Bridge Overlays

NY · 2026 (Jan) Standard Specifications✓ Full text on BuildSpecBook pages 626–627 Save this section

Ask about Section 581

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 581 - REMOVAL OF BRIDGE OVERLAYS

581-1 DESCRIPTION. The work shall consist of the removal and disposal of bridge overlays,

reinforcement, if present, and any miscellaneous materials encountered, as shown on the contract plans.

581-2 MATERIALS. Not specified.

581-3 CONSTRUCTION DETAILS. Not specified.

582-2 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2

581-4 METHOD OF MEASUREMENT. The work shall be measured by the area of bridge overlay,

removed and disposed of. The quantities will be determined from field measurements.

581-5 BASIS OF PAYMENT. The unit price bid per square foot shall include the cost of furnishing all

labor and equipment to complete the work. Payment will be made under: Item No. Item Pay Unit 581.01 Removal of Bituminous Concrete Overlay (Bridge) Square Foot 581.02 Removal of Cement Concrete Overlay (Bridge) Square Foot

Get an email when 581 changes

New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications (US Customary Units), 2026 (Jan) Edition. Pages 626–627 of 1,489. View official source ↗

Ask about this section

Scoped to New York Standard Specifications (Construction and Materials), Section 581 — Removal of Bridge Overlays. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.