SECTION 582 - REMOVAL AND REPLACEMENT OF STRUCTURAL CONCRETE (Last Revised September, 2025)
582-1 DESCRIPTION. The work shall consist of the removal and disposal of unsound structural
concrete from an existing structure and its replacement with new Performance Engineered Mixture (PEM) Portland Cement Concrete or an approved patching material, as indicated on the contract plans, or as ordered by the Engineer. All work shall be done at the locations indicated on the contract plans, or where ordered by the Engineer. All miscellaneous materials, not including bar reinforcement, encountered during the removal of unsound structural concrete, shall be removed, and disposed of unless otherwise indicated on the contract plans, or ordered by the Engineer.
582-2 MATERIALS. Materials used in this work shall conform to the following requirements:
Vertical and Overhead Patching Material 701-08 Water 712-01 Quilted Covers (for curing) 711-02 Plastic Coated Fiber Blankets (for curing) 711-03 Membrane Curing Compound 711-05 Admixtures 711-08
582-2.01 Replacement Concrete. Concrete shall conform to the requirements of §501- Portland Cement
Concrete Production and the appropriate mix design requirements specified in Table 2 of Materials Procedure (MP) 501-2 Mix Design and Approval Procedure for Performance Engineered Mixtures – Structural Concrete.
582-2.02 Vertical and Overhead Patching Material. The patching material used shall be a brand that
appears on the Department's Approved List.
582-3 Construction Details
582-3.01 Repair Determinations. The choice of replacement material will be indicated on the plans,
determined by the Engineer, or determined by the Contractor. The Contractor's determinations shall be made in accordance with the criteria of this subsection, and only in the absence of directions from the plans, or the Engineer. The Contractor's determinations shall be approved by the Engineer prior to the actual performance of the work.
582-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2 Maximum Aggregate Size. Average depth shall be determined by a measurement procedure acceptable to the Engineer.
582-3.02 Removal of Unsound Concrete. All unsound concrete shall be removed to a sound surface as
determined by the Engineer. If called for on the plans, the existing concrete shall be saw-cut to obtain a straight joint between the existing concrete and the new material. Care shall be exercised while removing the unsound concrete so as not to damage materials which are to remain in place. Exposed reinforcement remaining in place shall be cleaned in accordance with the requirements of §584-3.02A. Chipping hammers shall meet the requirements of §580-3.02.
582-3.03 Preparation of Surface
582-3 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
582-3.04 Placement. Air clean the surface with oil-free compressed air. After the surface preparation has
been accepted, every effort should be made to thoroughly wet the concrete surface, and all porous surfaces to be in contact with new concrete, for 12 hours. This may be accomplished by continuous wetting with soaker hoses or the use of burlap/burlene/etc. where moisture can be maintained. If, in the opinion of the Engineer, conditions or the situation prohibits this, then the surfaces should be wetted for as long as possible. Surfaces must be wetted by a means acceptable to the Engineer using potable water. The Contractor shall remove any puddles of free standing water with oil-free compressed air, and protect the surfaces from drying, so the existing concrete remains in a clean, saturated surface dry condition until placement of the new concrete. No material shall be placed if the ambient air, or concrete surface temperature is at, or below 45oF.
582-3.05 Form Removal. Form removal shall be in accordance with §555-3.09 with the following
exception: Forms shall be removed from thin concrete placements 24 curing hours after placement has been completed unless the Engineer determines the concrete is not strong enough to withstand damage. For purposes of this subsection, a thin concrete placement begins at the outermost surface of the new concrete and generally terminates at, or before, the midpoint of the main reinforcing steel. Concrete may be removed and replaced completely around one or two main reinforcing steel members to a depth no greater than 1 inch from the innermost surface of those members and still be considered a thin concrete placement. Main reinforcing steel members include reinforcing bars, but not spiral reinforcement or stirrups. Curing procedures shall be implemented immediately upon form removal.
582-3.06 Curing. Curing shall be performed according to the following:
582-4 Method of Measurement
582-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 2026 Volume 2
582-4.01 Removal and Replacement of Structural Concrete. Measurement shall be made as either the
number of cubic yards of concrete placed, or the number of square feet repaired as indicated on the contract plans, or where ordered or approved by the Engineer. No reductions in area will be made around corners.
582-4.02 Removal of Structural Concrete - Replacement with Vertical and Overhead Patching
Material. Measurement shall be made as the number of square feet of the plane projection of the repaired area as indicated on the contract plans, or where ordered or approved by the Engineer. Measurement shall be made prior to the placement of patching material.
582-5 Basis of Payment
582-5.01 Removal and Replacement of Structural Concrete. The unit price bid per cubic yard or per
square foot area shall include the cost of furnishing all labor, materials and equipment necessary to complete the work, except that bar reinforcement removal and replacement shall be paid for separately. Progress payments will be made in accordance with §582-5.03.
582-5.02 Removal of Structural Concrete - Replacement with Vertical and Overhead Patching
Material. The unit price bid per square foot shall include all labor, materials and equipment necessary to complete the work. Progress payments will be made in accordance with §582-5.03.
582-5.03 Progress Payments. Progress payments will be made when the concrete removal is completed.
Payment will be made at the unit price bid for 50% of the quantity removed. The balance of the quantity will be paid upon completion of the work. Payment will be made under: Item No. Item Pay Unit 582.0051 Removal and Replacement of Structural Concrete Cubic Yard 582.0052 Removal and Replacement of Structural Concrete Square Foot 582.0061 Removal of Structural Concrete- Replacement with Vertical and Overhead Patching Material Square Foot