583-1 Description
583-1.01 Work. The work shall consist of removal and disposal of unsound structural concrete and
replacement with shotcrete where indicated in the contract documents and where ordered by the Engineer. The Contractor has the option of using either the Dry Mix Process or the Wet Mix Process.
583-1.02 Definitions
A Shotcrete. This is mortar conveyed through a hose and pneumatically projected at high velocity onto a surface.
583-2 MATERIALS. Materials used in this work shall conform to the following requirements:
Portland Cement, Types 1 or 2 701-01 Quilted Covers (for curing) 711-02 Concrete Sand 703-07 Plastic Coated Fiber Blankets 711-03 Water 712-01 Membrane Curing Compound 711-05 Wire Fabric For Concrete Reinforcing1 709-02 Expansion Bolt Anchors GSA FF -S-325,Group III,Type 1 or Group VIII,Type 1 Hook Bolts Inserted in Expansion Bolt Anchors ASTM A307 Grade A NOTE. The wire fabric shall be galvanized in accordance with ASTM A641M regular coatings. The wire fabric shall be fabricated from No. 12 wire spaced 2 inches (nominal) in each direction or No. 10 wire spaced 3 inches (nominal) in each direction. Wire used shall have a minimum yield strength of 35 ksi .
583-2.01 Equipment
583-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 maintained at a pressure at least 16 psi greater than the air pressure. The nozzle shall be capable of delivering a conical discharge stream.
583-2.02 Qualification Test. If encasement of reinforcing bars is required, this test shall be performed to
qualify the shotcrete operator and the equipment, prior to beginning work. Each shotcrete operator shall be qualified by constructing a 2 x 2 foot test panel fabricated to duplicate the project shotcreting. Reinforcement shall be placed in the panel to provide a minimum 1 inch (front and rear) embedment and be of the same size and spacing encountered in the structure. Panels shall be shot in the v ertical, horizontal, and overhead positions as expected to be encountered. After setting, the test panel shall be broken open in a manner approved by and in the presence of the Engineer, to verify the reinforcement embedment. If voids are discovered, the work shall not proceed; additional panels shall be constructed until results acceptable to the Engineer are achieved. Small non -interconnected voids, as determined by the Engineer, shall not constitute failure. Additional qualification panels will be required whenever, in the opinion of the Engineer, the shotcrete operation significantly changes.
583-3 Construction Details
583-3.01 Preparation of Surfaces. All unsound concrete shall be removed until there are no offsets in
the cavity which would cause an abrupt change in thickness, except for a transition from above to below reinforcement. Minimum 1/2 inch square shoulders shall be left at the perimeter of the cavity. The final cut surface shall be sound and properly shaped. The sound surface shall be blast cleaned. Abrasive material used for blastcleaning shall contain no more than one percent free sili ca by weight. Air clean the surface with oil -free compressed air. After the surface preparation has been accepted, every effort should be made to thoroughly wet the concrete surface and all porous surfaces to be in contact with new concrete for 12 hours. This may be acc omplished by continuous wetting with soaker hoses or the use of burlap/burlene/etc. where moisture can be maintained. If in the opinion of the Engineer conditions or the situation prohibits this then the surfaces should be wetted for as long as possible. Surfaces must be wetted by a means acceptable to the Engineer using potable water. The Contractor shall remove any puddles of free standing water with oil -free compressed air, and protect the surfaces from drying, so the existing concrete remains in a cl ean, saturated surface dry condition until placement of the new concrete. TABLE 583 -1 SIZE AND SPACING OF HOOK -TYPE BOLTS (inches) Thickness of Placement Underside & Vertical Surfaces Nominal Size and Spacing1 Topside Nominal Size and Spacing1 2 1/4 dia. @ 18 ctrs. 1/4 dia. @ ctrs. 24 4 3/8 dia. @ 24 ctrs. 3/8 dia. @ ctrs. 36 5 3/8 dia. @ 21 ctrs. 3/8 dia. @ ctrs. 36 6 3/8 dia. @ 20 ctrs. 3/8 dia. @ ctrs. 36 7 3/8 dia. @ 18 ctrs. 3/8 dia. @ ctrs. 36 8 1/2 dia. @ 23 ctrs. 1/2 dia. @ ctrs. 36 9 1/2 dia. @ 22 ctrs. 1/2 dia. @ ctrs. 36 10 1/2 dia. @ 21 ctrs. 3/4 dia. @ ctrs. 24
583-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 11 1/2 dia. @ 20 ctrs. 3/4 dia. @ ctrs. 24 12 1/2 dia. @ 18 ctrs. 3/4 dia. @ ctrs. 24 NOTE: 1. Bolt diameters may be increased but not decreased. Spacing may be decreased but not increased. No material shall be placed if the ambient air, or concrete surface temperature is at, or below 45oF. Reinforcement may consist of either existing reinforcing bars or welded galvanized wire fabric, depending on the conditions and shall be clean and free from loose mill scale, loose rust, oil or other coatings that interfere with bonding. Chipping hammers shall meet the requirements of §580 -3.02. Sufficient clearance shall be provided around the reinforcement to permit complete encasement with sound shotcrete. The minimum clearance between the reinforcement and the form or other backup material shall be 1 inch . Where the chipped area is equal to or less than 2 inches in depth, the use of wire fabric or mechanical concrete anchors will not be required except for overhead surfaces. Where the chipped areas are overhead, and are 1 inch in depth or greater, galvanized wire fabric and mechanical concrete anchors shall be used. Mechanical concrete anchors shall be placed as required by Table 583 -1. Where the chipped area is over 2 inches in depth and existing bar reinforcement is available, galvanized wire fabric shall be attached to the bars with tie wires. If existing bar reinforcement is not available, wire fabric shall be installed by means of mechanical concrete anchors in accordanc e with the requirements of Table 583 -1. Wire fabric shall be cut in sheets of the proper size and shall be carefully bent in such a manner as to follow closely the contours of the areas to be repaired. The wire fabric shall be securely tied to the hook - type bolts or the reinforcing bars. Where sheets meet, they shall be lapped a minimum of 4 inches and shall be securely fastened together. Expansion bolt anchors shall be placed in holes drilled in the existing concrete surface to the diameter and depth recommended by the manufacturer of the expansion bolt anchors. Hook -type bolts of the proper length shall be inserted and securely attached to the expansion bolt anchors so as to provide a positive connection to sound concrete. Where the chipped area is 6 inches or greater in depth, the Contractor shall place galvanized wire fabric in layers 4 inches apart. Where it is necessary to place more than one layer of galvanized wire fabric in an area to be repaired, the innermost layer shall be covered by a shotcreting prior to the installation of the next outermost layer. Existing reinforcement which has lost significant section shall be repaired in a manner satisfactory to the Engineer as extra work.
583-3.02 Preparation of Materials
583-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 Sand -cement mixtures shall be applied within 75 minutes of the time the sand initially contacts the cement. Sand -cement mixtures which exceed the 75 minute limit shall not be incorporated in the work. They shall be disposed of in a manner acceptable to t he engineer.
583-3.03 Placement
583-3 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 anticipated shooting positions. The shotcrete operator shall completely fill the test panel, after which it shall be screeded or cut with a trowel such that it contains a 4 inches uniform depth of shotcrete. The test panels shall then be covered with wet quilted covers or wet polyethylene - coated blankets; put in a shaded, protected place; kept wet and cured for a minimum of seven days. The test panels shall be sent to the Departm ent of Transportation's Materials Bureau for testing at fourteen days. Cor es will be drilled from the panels and compressive strengths at fourteen days will be reported to the Engineer. Additional information on the conditions of the shotcrete such as sand pockets, voids, and laminations will also be reported with the strength results.
583-5 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Sections 200 - 599 STANDARD SPECIFICATIONS (USC) January 1, 202 4 Volume 2 583-4 METHOD OF MEASUREMENT. The quantity to be paid for under this item will be the number of square feet of finished shotcrete installed. Measurement will be taken as the plane projection of the finished surface. Measurement shall be made prior to the placement of shotcrete.
583-5 BASIS OF PAYMENT. The unit price bid per square foot shall include the cost of furnishing all
labor, materials and equipment necessary to complete the work.
583-5.01 Removal of Structural Concrete - Replacement with Shotcrete. No Reinforcement Bar
Encasement. The unit price bid per square foot shall include the cost of furnishing all labor, materials and equipment necessary to complete the work.
583-5.02 Removal of Structural Concrete - Replacement with Shotcrete, Reinforcement Bar
Encasement. The unit price bid per square foot shall include the cost of furnishing all labor, materials and equipment necessary to complete the work, except that replacement of deteriorated reinforcement shall be paid for separately. Payment shall not be made until cores verify acceptability. Payment will be made under: Item No. Item Pay Unit 583.02 Removal of Structural Concrete - Replacement with Shotcrete, No Reinforcement Bar Encasement Square Foot 583.03 Removal of Structural Concrete - Replacement with Shotcrete, with Reinforcement Bar Encasement Square Foot SECTION 584 - SPECIALIZED OVERLAYS FOR STRUCTURAL SLABS
584-1 DESCRIPTION. Prepare the surfaces that will be in contact with slab reconstruction concrete and
place slab reconstruction concrete. Prepare the structural slab surface and place a specialized concrete overlay.
584-1.01 Scope. Concrete removal work will be paid for under the appropriate item(s). Minimum