SECTION 637 - ENGINEER’S FIELD OFFICE, LABORATORY AND EQUIPMENT (Last Revised January, 2022)
637-1 DESCRIPTION. This work shall consist of providing, furnishing and maintaining an Engineer’s
Field Office and a Field Laboratory in good working condition and appearance for the exclusive use of, and occupancy by the inspection staff. The buildings shall be habitable environments, readily accessible to the public and free of any recognizable health or safety hazards. The work shall also consist of providing and maintaining equipment for use by the inspection staff.
637-1.01 Engineer’s Field Office. This work shall consist of providing for the Engineer’s use a building,
or a portion thereof, or a modular trailer of a specified type erected at a location approved by the Engineer.
637-1.02 Field Laboratory. This work shall consist of providing a Field Laboratory for soils and
materials testing at a location approved by the Engineer.
637-1.03 Concrete Cylinder Curing Equipment. This work shall consist of providing a concrete
cylinder curing box and a concrete cylinder curing tank.
637-1.04 Rain Gauge. This work shall consist of providing and maintaining a wireless rain gauge
system.
637-1 05
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-1.05 Inspection Boat. This work shall consist of providing and maintaining a motorized boat for
exclusive use by the Engineer and the Inspection Staff.
637-1.06 Office Technology Supplies. This work shall consist of providing technology-related materials
and supplies for use by the inspection staff.
637-1.07 Construction Testing Supplies - Consumables. This work shall consist of providing
consumable testing supplies to be used by inspection staff.
637-1.08 Partnering Workshop. This work shall consist of a partnering workshop coordinated and
facilitated by an independent facilitator. The Department and the Contractor will share the cost of the partnering workshop equally.
637-2 Materials.
637-2.01 Engineer’s Field Office. The Engineer’s Field Office shall be within a secured, weatherproof
building or mobile trailer. If two or more mobile trailer units are provided, they shall be joined with weatherproof connections. Mobile trailers shall be in new or like new condition. The Contractor may furnish equivalent facilities in an existing building, provided that the building is located to provide convenient service. The Contractor shall supply the Engineer with a copy of the Certificate of Occupancy for the existing building. The Engineer’s Field Office shall be in accordance with the requirements of the New York State Uniform Fire Prevention and Building Code, 19 NYCRR, and any applicable local codes. The Engineer’s Field Office shall be in a location with access to high speed broadband (non-satellite) Internet service. The electrical system shall be able to continuously operate all equipment and be provided with adequate receptacles. To accommodate computer equipment, the field office shall be provided with a dedicated 20 amp electrical service and a vacant floor-to-ceiling area with a 3 foot x 3 foot footprint along a wall for the installation of a computer hardware rack/cabinet. Electric light shall be provided by non glare-type luminaries to provide a minimum illumination level of 100 foot-candles at desk-height level. An ambient air temperature of 70°F ±5°F shall be maintained. Fire extinguishers and smoke and carbon monoxide detectors shall be provided and installed. The Engineer’s Field Office shall be partitioned to provide separate rooms, defined as either “small” or “large”, with adjoining doors. Table 637-1 below contains the minimum area requirements for each of the office types. TABLE 637-1 ENGINEER’S FIELD OFFICE AREA REQUIREMENTS Physical Requirement Engineer’s Field Office Type 1 2 3 4 5 Min. total floor area (sf) 530 860 1300 2500 2700 Min. number of small rooms 2 3 2 3 6 Min. floor area of small rooms (sf) 100 100 120 150 175 Min. number of large rooms 1 1 2 2 2
637-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-2 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-2 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Each desk shall also be provided with an adjustable chair with arms, 5 legs with casters and be adjustable from approximately 16 inches to 24 inches in height. Each desk shall have a dedicated electrical outlet receptacle. The required number of office desks and chairs to be provided is specified in Table 637-2.
637-2.02 Field Laboratory. The Field Laboratory shall be a secured, weatherproof room, building or
mobile structure not less than 100 square foot floor area in size. The floor covering shall be linoleum, tile or other serviceable finish. A local exhaust system shall be provided. An ambient air temperature of 70°F ±10°F shall be maintained. The Contractor may furnish equivalent facilities in an existing building, provided that the building is located to provide convenient service. The Contractor shall supply the Engineer with a copy of the Certificate of Occupancy for the existing building. The Field Laboratory shall be in accordance with the requirements of the New York State Uniform Fire Prevention and Building Code, 19 NYCRR, and any applicable local codes. The electrical system shall be able to continuously operate all equipment and be provided with adequate receptacles. Where an electric hotplate or stove is provided, service shall be increased over 20 amperes by an amount equal to the rating of the device provided. The Field Laboratory shall be sufficiently anchored to prevent damage from vibration caused by the laboratory equipment. Fire extinguishers and smoke and carbon monoxide detectors shall be provided and installed.
637-2 03
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-2.03 Concrete Cylinder Curing Equipment.
637-2 04
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 cylinders. When filled with lime water, the tank shall not leak enough so that the cylinders are exposed
637-2.04 Rain Gauge. The wireless rain gauge system shall meet the requirements below. All necessary
mounting materials and hardware, operating manuals and other pertinent media for the components shall be provided.
637-2.05 Inspection Boat. The boat provided shall comply with the following minimum requirements:
637-2 06
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-2.06 Office Technology Supplies. Materials as specified in the bid documents or by the Engineer.
637-2.07 Construction Testing Supplies – Consumables. Consumable testing materials as specified by
the Engineer.
637-2.08 Partnering Workshop. None specified.
637-3 CONSTRUCTION DETAILS. The equipment, with the exception of the office technology
supplies, shall be maintained by, and remain the property of, the Contractor.
637-3.01 Engineer’s Field Office. The Contractor shall be responsible, until use and occupancy is
relinquished by the State, for any and all damage, direct or indirect, of whatever nature, occurring to the property of the State and property of the inspection staff which is kept in the Engineer's Field Office. The Engineer will provide the Contractor with a detailed list of items kept in the office, with corresponding dollar values, and will provide the Contractor with updates when something on the list changes. Non- State-owned property shall only be those items used in the performance of contract-related work activities. Such property shall be replaced within 30 days of the reported damages and would include any loss caused by, but not limited to, fire, theft, vandalism or malicious mischief. The Contractor shall not be responsible for items kept in the Engineer's Field Office that are not on this list. The Contractor shall install the Engineer’s Field Office sign at a location approved by the Engineer. If the Engineer’s Field Office is not located within or adjacent to the contract limits, two (2) additional signs shall be displayed conspicuously within the contract limits in locations directed by the Engineer. The Engineer’s Field Office shall be fully equipped and made available for use and occupancy by the inspection staff prior to the start of any contract work, and shall be made available after contract final acceptance as directed in writing by the Regional Construction Engineer. All furniture and equipment shall be fully assembled, operational, clean and serviceable. The Engineer’s Field Office shall be cleaned weekly or more often if required, and the timing of the cleaning operations shall be coordinated with the Engineer. The Contractor shall remove and dispose of all rubbish generated in the office and shall keep the office free from pests. The Contractor shall remove snow from all areas subject to vehicular circulation and parking. After completion, all portable buildings or trailers, fencing, surfacing and utilities shall be removed from the location and the areas cleaned, loamed and restored as required.
637-3 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3
637-3.02 Field Laboratory. The Contractor shall be responsible for any and all damage, direct or
indirect, of whatever nature, occurring to the property of the State which is kept in the Field Laboratory. The Engineer will provide the Contractor with a detailed list of items kept in the laboratory, with corresponding dollar values, and will provide the Contractor with updates when something on the list changes. Non-State-owned property shall only be those items used in the performance of contract-related work activities. Such property shall be replaced within 30 days of the reported damages and would include any loss caused by, but not limited to, fire, theft, vandalism or malicious mischief. The Contractor shall not be responsible for items kept in the Field Laboratory that are not on this list. The Field Laboratory shall be fully equipped and made available for use and occupancy by the inspection staff prior to the start of any contract work. Such use and occupancy shall be made available after contract final acceptance as directed in writing by the Regional Construction Engineer. All furniture and equipment shall be fully assembled, operational, clean and serviceable. The Field Laboratory shall be cleaned weekly or more often if required, and the timing of the cleaning operations shall be coordinated with the Engineer. The Contractor shall remove and dispose of all rubbish generated in the laboratory and shall keep the laboratory free from pests. After completion, all portable buildings or trailers, fencing, surfacing and utilities shall be removed from the location, the areas cleaned, loamed and restored as required.
637-3.03 Concrete Cylinder Curing Equipment. Prior to the placement of any structural concrete, the
Contractor shall furnish the Engineer a concrete cylinder curing box and concrete cylinder curing tank that each have (2) locks with two keys for each lock. The locks shall fit each securing latch of the curing equipment. The concrete cylinder curing equipment shall remain exclusively available to the Engineer at a location approved by the Engineer. The Contractor shall provide and maintain all necessary utility connections to operate the curing equipment.
637-3.04 Rain Gauge. The Contractor shall provide, install and maintain the wireless rain gauge system
in accordance with the manufacturer’s instructions in a location approved by the Engineer. The Contractor shall make the system fully operational in a timely manner, at a minimum, prior to any soil disturbance at the site. The Contractor shall provide replacement due to breakdown, damage, loss, or theft within 24 hours of notification.
637-3.05 Inspection Boat. The Contractor shall furnish the boat (and operator for Type B Inspection
Boats) within 5 work days after written notification by the Engineer, and the boat (and operator for Type B Inspection Boats) shall, thereafter, be available at all times to the Engineer and other personnel authorized by the Engineer.
637-3.06 Office Technology Supplies. The Contractor shall provide office technology-related supplies
for the exclusive use of Department personnel and their authorized representatives. The supplies shall be provided within 2 work days of the Engineer’s request unless the Engineer agrees to a longer delivery time. The Department shall retain ownership of the technology-related materials and supplies.
637-3.07 Construction Testing Supplies - Consumables. The Contractor shall provide consumable
testing materials for the exclusive use of Department personnel and their authorized representatives. The supplies shall be provided within 5 work days of the Engineer’s request, unless the Engineer agrees to a longer delivery time. The Department shall retain ownership of the consumable testing materials, both materials used and those materials unused for which the Contractor has been paid, at the completion of the contract.
637-3.08 Partnering Workshop. The Contractor and the Regional Construction Engineer will jointly
select a facilitator and a location for the workshop. A list of potential facilitators is available from the Department. The facilitator shall present a one to two day Partnering Workshop for this contract between the time of award and the start of work. For long duration, multi-year projects, a subsequent follow-up
637-4 01
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 workshop may be convened, with the agreement of the Contractor and the Regional Construction Engineer, at an appropriate point during the progression of the work. The associated costs for this subsequent workshop will be reimbursed under this item.
637-4 Method of Measurement
637-4.01 Engineer’s Field Office. The Engineer’s Field Office will be measured for payment as the
number of months satisfactorily provided, measured to the nearest 0.25 months.
637-4.02 Field Laboratory. The Field Laboratory will be measured for payment as the number of units
satisfactorily provided.
637-4.03 Concrete Cylinder Curing Equipment. The concrete cylinder curing equipment will be
measured for payment as the number of concrete cylinder curing box and curing tank pairs furnished and installed.
637-4.04 Rain Gauge. The rain gauge will be measured for payment as the number of units furnished
and installed.
637-4.05 Inspection Boat. The inspection boat will be measured for payment on a monthly basis,
measured to the nearest 0.25 months.
637-4.06 Office Technology Supplies. Office technology supplies will be measured for payment on a
fixed price Dollars-Cents pay unit basis.
637-4.07 Construction Testing Supplies – Consumables. Construction testing supplies will be
measured for payment on a fixed price Dollars-Cents pay unit basis.
637-4.08 Partnering Workshop. The Partnering Workshop will be measured for payment on a Dollars-
Cents pay unit basis.
637-5 BASIS OF PAYMENT. For the items to be paid on a Dollars-Cents pay unit basis, the total cost
shown in the itemized proposal will be considered the price bid even though payment will be made only for actual equipment and materials supplied. The unit price amount is not to be altered in any manner by the bidder. Should the bidder alter the amount shown, the altered figure will be disregarded, and the original price will be used to determine the total amount bid for the contract.
637-5.01 Engineer’s Field Office. The unit price bid per month for the Engineer’s Field Office shall
include the cost of all labor, materials and equipment necessary to complete the work including property rental, utility charges and incidental expenses. Payment will be made for each month of availability for occupancy by the Engineer and inspection field staff. No payment will be made under Engineer's Field Office for each calendar day during which there are deficiencies in compliance with these requirements. The first calendar day shall commence 24 hours after notice to the Contractor of such a deficiency. This nonpayment shall be deducted from the next contract payment. The amount of such calendar day nonpayment will be determined by dividing the unit price bid per month by 30. If the cited deficiencies exceeds 72 hours or is permitted to recur, liquidated damages will be assessed at 20% of the rate shown in Table 108-1 Schedule of Liquidated Damages of §108-03 Failure to Complete Work on Time for each subsequent calendar day or part thereof that the cited deficiency resulting in nonpayment is not corrected.
637-5 02
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Monthly payments may be terminated prior to contract final acceptance by written notification by the Regional Construction Engineer that such office will no longer be required on the contract. Payment for each month's occupancy of the Engineer’s Field Office after the date of contract final acceptance will be made as part of the final contract payment. Failure of the Contractor to supply documentation required to complete the final estimate may result in nonpayment during this delaying period. During periods of contract extension of time where Engineering Charges are assessed, no payment will be made for occupancy and services, except that payment for each month's occupancy after the date of final acceptance will be made as part of the final estimate.
637-5.02 Field Laboratory. The unit price bid for each Field Laboratory shall include the cost of
furnishing all labor, materials and equipment necessary to complete the work including property rental, utility charges and incidental expenses. Payment will be made for each Field Laboratory when it has been placed on the work site and is fully operational.
637-5.03 Concrete Cylinder Curing Equipment. The unit price bid for each concrete cylinder curing
box and curing tank pair shall include the cost of all labor, materials, and equipment necessary to complete the work including property rental, relocation, repair or replacement, painting, cleaning, maintenance, and utility charges.
637-5.04 Rain Gauge. The unit price bid for each rain gauge shall include the cost of furnishing all labor,
materials and equipment necessary to complete the work including installing and maintaining all components of the wireless rain gauge system. Payment will be made for the rain gauge when it has been installed and is fully operational.
637-5.05 Inspection Boat. The unit price bid per month shall include the cost of furnishing all labor,
fuel, maintenance, repairs, registration permits, the operator (for Type B Inspection Boats), and other necessary incidentals for operation of the boat. A deduction of 1/30 of a month will be made for each 24- hour period, or portion thereof, during which the boat is unavailable to the Engineer, or personnel authorized by the Engineer, regardless of the reason for the boat's unavailability. When directed in writing by the Engineer, payment for each month of boat use after the date of acceptance will be made as part of the final estimate. Payment will begin the first month the boat is furnished and made available for use. Monthly payments may be terminated on a specified date prior to acceptance of the Contract by written notification by the Engineer that the boat will no longer be required.
637-5.06 Office Technology Supplies. Office technology supplies is a “draw down” item. As the
materials are supplied, the receipts shall be submitted to the Engineer. The Contractor will be reimbursed for receipted costs of materials plus 5% for profit and overhead (“materials” includes all labor, materials and equipment, including services and service contracts provided).
637-5.07 Construction Testing Supplies – Consumables. Construction testing supplies is a “draw-
down” item. As the materials are supplied, the receipts shall be submitted to the Engineer. The Contractor will be reimbursed for receipted costs of materials plus 5% for profit and overhead (“materials” includes all labor, materials and equipment, including delivery charges from vendor sources).
637-5.08 Partnering Workshop. The Department will reimburse the Contractor for 50% of the costs for
the facilitator and the facility upon submission of original receipts. Receipted costs eligible for 50% reimbursement include the fee for the facilitator and the costs for the facilitator’s travel and expenses; associated workshop costs such as charges for the rental of the meeting room, required audio/visual equipment and any handouts, notes or workshop materials. The costs for travel, lodging, meals and salaries of workshop attendees, other than those of the facilitator, will not be eligible for reimbursement under this item.
638-2.01 Aggregates.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 2026 VOLUME 3 Payment will be made under: Item No. Item Pay Unit 637.01 Field Laboratory Each 637.04 Concrete Cylinder Curing Equipment Each 637.11 Engineer’s Field Office – Type 1 Month 637.12 Engineer’s Field Office – Type 2 Month 637.13 Engineer’s Field Office – Type 3 Month 637.14 Engineer’s Field Office – Type 4 Month 637.15 Engineer’s Field Office – Type 5 Month 637.26 Rain Gauge Each 637.32 Inspection Boat - Type A Month 637.33 Inspection Boat - Type B Month 637.34 Office Technology and Supplies Dollars-Cents 637.35 Partnering Workshop Dollars-Cents 637.36 Construction Testing supplies – Consumables Dollars-Cents
Get an email when 637 changes
New York revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.