Incidental Construction (600-699)

651COMMUNICATION FACILITIES

NY · 2024 Standard SpecificationsBook pages 734733View official source ↗

650-3 04

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Engineer permit interruption of trenchless installation operations in these instances, the Contractor shall provide bulkheads and dewatering measures as approved by the Engineer.

650-3.04 Railroad Responsibility. Any settlement or upheaval of the railroad tracks resulting from the

casing installation and occurring within one year from the date the work is completed, will be corrected by the railroad company.

650-4 METHOD OF MEASUREMENT. The quantity to be paid for under this work will be the

number of feet of casing, measured to the nearest foot, satisfactorily installed to the required length, grade, and alignment in accordance with the contract documents and as directed by the Engineer.

650-5 Basis of Payment

650-5.01 General. The unit price bid per linear f oot shall include the cost of furnishing all labor,

materials, and equipment (including dewatering if required) necessary to satisfactorily complete the work. Rail hangers (if required) shall be furnished, installed, and removed as called for in the Temporary Track Support System item included in the contract documents. This work will be paid for separately. Costs incurred by the railroad company to correct settlement or upheaval of the railroad tracks resulting from the casing installation and occurring within one year from the date of work is completed, will be reimbursed to the railroad company directly by the State at no cost to the Contractor. Surveying for the presence/extent of ground movements during the trenchless installation shall be paid for separately. Payment will be made under: Item No. Item Pay Unit 650.10XX Trenchless Installation of Casing Under Highway Foot with a diameter less than or equal to 24”. 650.11XX Trenchless Installation of Casing Under Highway Foot with a diameter greater than 24” and less than or equal to 42”. 650.12XX Trenchless Installation of Casing Under Highway Foot with a diameter greater than 42”. 650.20XX Trenchless Installation of Casing Under Railroad Foot with a diameter less than or equal to 24”. 650.21XX Trenchless Installation of Casing Under Railroad Foot with diameter greater than 24” and less than or equal to 42”. 650.22XX Trenchless Installation of Casing Under Railroad Foot with a diameter greater than 42”. NOTE : XX denotes casing diameter size . SECTION 651 - COMMUNICATION FACILITIES

651-1 DESCRIPTION. The work in this section shall include special construction of communication

facilities which are required for outside agencies such as police and fire departments. The construction details for this work will be covered by special provisions in the contract documents. SECTION 652 - FURNISHING AND APPLYING SALTS

652-1 DESCRIPTION. Under this work the Contractor shall furnish and apply salt for soil

stabilization, as a dust palliative or for other purposes as specified.

Source: New York Standard Specifications, 2024 Edition. Pages 734733 of 1,264.