B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Incidental Construction (600-699)

652FURNISHING AND APPLYING SALTS

NY · 2024 Standard SpecificationsBook pages 734736View official source ↗

650-3 04

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Engineer permit interruption of trenchless installation operations in these instances, the Contractor shall provide bulkheads and dewatering measures as approved by the Engineer.

650-3.04 Railroad Responsibility. Any settlement or upheaval of the railroad tracks resulting from the

casing installation and occurring within one year from the date the work is completed, will be corrected by the railroad company.

650-4 METHOD OF MEASUREMENT. The quantity to be paid for under this work will be the

number of feet of casing, measured to the nearest foot, satisfactorily installed to the required length, grade, and alignment in accordance with the contract documents and as directed by the Engineer.

650-5 Basis of Payment

650-5.01 General. The unit price bid per linear f oot shall include the cost of furnishing all labor,

materials, and equipment (including dewatering if required) necessary to satisfactorily complete the work. Rail hangers (if required) shall be furnished, installed, and removed as called for in the Temporary Track Support System item included in the contract documents. This work will be paid for separately. Costs incurred by the railroad company to correct settlement or upheaval of the railroad tracks resulting from the casing installation and occurring within one year from the date of work is completed, will be reimbursed to the railroad company directly by the State at no cost to the Contractor. Surveying for the presence/extent of ground movements during the trenchless installation shall be paid for separately. Payment will be made under: Item No. Item Pay Unit 650.10XX Trenchless Installation of Casing Under Highway Foot with a diameter less than or equal to 24”. 650.11XX Trenchless Installation of Casing Under Highway Foot with a diameter greater than 24” and less than or equal to 42”. 650.12XX Trenchless Installation of Casing Under Highway Foot with a diameter greater than 42”. 650.20XX Trenchless Installation of Casing Under Railroad Foot with a diameter less than or equal to 24”. 650.21XX Trenchless Installation of Casing Under Railroad Foot with diameter greater than 24” and less than or equal to 42”. 650.22XX Trenchless Installation of Casing Under Railroad Foot with a diameter greater than 42”. NOTE : XX denotes casing diameter size . SECTION 651 - COMMUNICATION FACILITIES

651-1 DESCRIPTION. The work in this section shall include special construction of communication

facilities which are required for outside agencies such as police and fire departments. The construction details for this work will be covered by special provisions in the contract documents. SECTION 652 - FURNISHING AND APPLYING SALTS

652-1 DESCRIPTION. Under this work the Contractor shall furnish and apply salt for soil

stabilization, as a dust palliative or for other purposes as specified.

652-3 01

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3

652-2 MATERIALS. Materials for this work shall conform to the requirements of the following

subsections of Section 700 - Materials and Manufacturing : Calcium Chloride 712-02 Sodium Chloride 712-03

652-3 Construction Details

652-3.01 Stabilized Gravel Surface Course. The Contractor shall apply salt for stabilization in

accordance with the construction details specified in §411 -3.

652-3.02 Dust Control. The Contractor shall apply salt on the highway to control dust at the locations

and during periods as the Engineer may direct. The salt shall be applied on the dampened road surface by means of approved line spreader or equal equipment. An approved sprinkler or other approved method may be used to dampen the ro ad surface. The recommended application rates for calcium chloride are as follows: 1 1/2 pounds per square yard per application 4 1/10 pounds per square yard per year

652-4 METHOD OF MEASUREMENT. Salt shall be measured by the number of the tons furnished

and applied.

652-5 BASIS OF PAYMENT. The unit price bid per ton shall include all labor, material and equipment

necessary to complete the work including necessary water to dampen the road surface. Payment will be made under: Item No. Item Pay Unit 652.01 Furnishing and Applying Calcium Chloride Ton 652.02 Furnishing and Applying Sodium Chloride Ton SECTION 653 PAVEMENT RIDE QUALITY (New Section May, 2019)

653-1 DESCRIPTION. Collect and report pavement ride quality data from PCC (Portland Cement

Concrete) and/or Asphalt Pavements .

653-2 MATERIALS AND EQUIPMENT. Use a Department certified inertial profiler and operator

certified in accordance with Materials Method 653. Provide a copy of the certification letter to the Engineer before data collection.

653-3 Construction Details.

653-3.01 Pavement Ride Quality (PRQ) Data Collection. PRQ data consists of the longitudinal profile

of the pavement. Perform PRQ data collection when the pavement can be opened to construction traffic and/or after corrective actions, such as diamond grinding, have been completed. Perform three PRQ tests per lane in accordance with Materials Method 653.

653-3 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Notify the Engineer before PRQ testing takes place. Submit ride quality results to The Engineer in accordance with Materials Method 653 within 45 days of completion of paving. Submit results to the Engineer in accordance to Materials Method 653. After the data is analyzed, calculate the corresponding quality units.

653-3.02 Corrective Action . Correct all 0.1 -mile sections that fail to meet the requirements of Tables 653 -

1 and 653 -2. Perform PRQ testing again where corrective actions were performed to ensure that the International Roughness Index (IRI) values are below the values noted above. Perform additional corrective work until the IRI are below the above values.

A.Diamond Grinding: Diamond grind areas in accordance with Section 505 Diamond Grinding. All grinding must be performed for the full width of the driving lane.
1.Asphalt Pavement: The total amount of grinding can not be more than 5% of the lane -miles. The surface texture after diamond grinding is acceptable and no additional texturing is required.
2.PCC Pavement: If more than 20% of the reporting segment is ground for any reason, diamond grind 95%, minimum, of the entire reporting segment.
B.Remove and Replace:
1.Asphalt Pavement: Perform corrective work by removing and replacing to the depth necessary to correct the deviations.
2.PCC Pavement: Perform corrective work by removing and replacing full depth sections as necessary.

653-4 METHOD OF MEASUREMENT. The quantity to be measured for payment will be in quality

units. Quality Unit Calculation. PRQ pay adjustments will be based on Total Quality Units (TQU). Total Quality Units is the summation of the IRI Quality Units (IRIQU) and the Localized Roughness Quality Units (LRQU): TQU = (IRIQU) + (LRQU)

A.International Roughness Index Quality Units (IRIQU)
1.Determine Quality Units for each PRQ lot using Table 653 -01 for Asphalt Pavements and Table 653 -02 for PCC Pavements and Materials Method 653.
2.For PRQ lots of a length different from 528 ft, adjust the number of Quality Units as follows: IRIQU = Quality Units from appropriate table x (Length of PRQ lot (ft)/528(ft))
3.Determine the total number of IRI Quality Units for the project by summing the Quality Units from all PRQ lots.

653-3 02

NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 Table 653 -01 Determination of IRI Quality Units (IRIQU) for Asphalt Pavements Level 1 Level 2 PRQ lot IRI (in/mile) Quality Units PRQ lot IRI (in/mile) Quality Units ≤45 8 ≤50 4

46-59 (60-Iri)*0.5 51-64 (65-Iri)*0.25

60-74 0 65-79 0

75-90 (74-Iri) 80-95 (79-Iri)*0.5

>90 Corrective action >95 Corrective action Table 653 -02 Determination of IRI Quality Units (IRIQU) for PCC Pavements Level 1 Level 2 PRQ lot IRI (in/mile) Quality Units PRQ lot IRI (in/mile) Quality Units ≤50 8 ≤57 4

51-64 (65-Iri)*0.5 58-64 (65-Iri)*0.5

65-79 0 65-79 0

80-95 (79-Iri) 80-95 (79-Iri)*0.5

>95 Corrective action >95 Corrective action

B.Localized Roughness Measurement (LRQU)
1.Determine the localized roughness lane lot percentage based on Materials Method 653 Localized Roughness Summary Report. Calculate the Localized Roughness Quality Units (LRQU) based on the following equation: LRQU = lane percentage * total quality units in contract * ( -2)

653-5 Basis of Payment.

Include the cost of all labor and equipment necessary to satisfactorily complete the work. Payment of Quality Adjustments will be made based on the number of Quality Units multiplied by the fixed price for Quality Adjustment Items listed in the contract documents for the quantity placed on the day the Quality Units represent. Payment will be made under: Item No. Item Pay Unit 653.1010 Pavement Ride Quality Adjustment to Asphalt Level 1 Quality Unit 653.1020 Pavement Ride Quality Adjustment to Asphalt Level 2 Quality Unit 653.2010 Pavement Ride Quality Adjustment to PCC Level 1 Quality Unit 653.2020 Pavement Ride Quality Adjustment to PCC Level 2 Quality Unit SECTION 654 - IMPACT ATTENUATORS - PERMANENT (Last Revcised May, 2019)