SECTION 675 - RAILROAD TRACK AND APPURTENANCES
675-1 DESCRIPTION. The work in this section shall include work required for railroad track and
appurtenances.
675-2 MATERIALS. Materials shall be as specified in the special specifications.
675-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
675-4 METHOD OF MEASUREMENT. As specified in the special specifications.
675-5 BASIS OF PAYMENT. As specified in the special specifications.