NEW YORK STATE DEPARTMENT OF TRANSPORTATION Section 600 STANDARD SPECIFICATIONS (USC) January 1, 202 4 VOLUME 3 670.50TCWW Luminaire Each T= Type of Lamp and Mounting: 1=High Pressure Sodium Vapor, Std. Mount; 2=High Pressure Sodium Vapor, Underbridge Mt.; 3=Low Pressure Sodium Vapor, Underbridge Mt.; 4=Mercury Vapor, Std Mount; 5=Mercury Vapor, Underbridge Mount C= Cutoff Characteristics 1=Short, Cutoff; 2=Medium, Semi -cutoff; 3=Long, Non -cutoff; 4=Medium, Cutoff; 5= Long, Semi -cutoff; 6=Medium, Non -cutoff; 7=Short, Non -cutoff 8=Short, Full Cutoff; 9=Medium, Full Cutoff WW= Wattages 03=35 watts; 05=50 watts; 07=70 watts;15=150 watts; 20=200 watts 25=250 watts;40=400 watts; 01=1000 watts; 55=55 watts; 09=90 watts; 10=100 watts; 13=135 wa tts; 17=175 watts; 70=700 watts 670.60 Photoelectric Controls Each 670.70XX Single Conductor Cable Foot XX = 02 03 04 05 06 07 10 20 30 40 Gage = 2 4 6 8 10 12 1/0 2/0 3/0 4/0 670.71XX Single Conductor Direct Burial Cable Foot XX = 01 02 03 04 05 06 07 Gage = 4/0 2/0 1/0 2 6 10 12 670.7501 Ground Wire No. 6 AWG. Foot 670.80 Remove and Store Lamppost Assembly Each 670.81 Remove and Dispose of Lamppost Assembly Each 670.82 Remove Lamppost Foundation Each 670.90 Relocate Lamppost Assembly Each 670.91 Relocate Bracket Arm With Luminaire Each SECTIONS 671 THRU 674 ( VACANT ) SECTION 675 - RAILROAD TRACK AND APPURTENANCES
675-1 DESCRIPTION. The work in this section shall include work required for railroad track and
appurtenances.
675-2 MATERIALS. Materials shall be as specified in the special specifications.
675-3 CONSTRUCTION DETAILS. The extent of work and construction requirements will be
covered by special specifications in the contract documents.
675-4 METHOD OF MEASUREMENT. As specified in the special specifications.
675-5 BASIS OF PAYMENT. As specified in the special specifications.