Ohio Department of Transportation (ODOT) · Construction & Material Specifications

Section 423 — Crack Sealing, Hot Applied

Ohio Construction & Material Specifications, Section 423. Full text, cross-references and related pay items on BuildSpec.

ITEM 423 CRACK SEALING, HOT APPLIED 423.01 Description. This work consists of preparing and sealing pavement cracks with a hot applied crack sealant. 423.02 Materials. Furnish hot applied crack sealant, of the type specified, conforming to: Type I ........................................... 702.17.A Type II ......................................... 702.17.B Type IV ........................................ 702.17.D Type V .......................................... 702.17.E Furnish crack sealant or mastic materials according to 702.17. 423.03 Equipment. Equipment used in the performance of this…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in