504.01 324 sum price. Excavation deeper than 1 foot (0.3 m) below plan elevation may be provided for as Extra Work, as described in 109.05. If Co fferdams and Excavation Bracing is a separate pay item, the lump sum price includes any extra cost involved for cofferdams for additional depth up to 3 feet (0.9
504.01 Description
504.02 Materials
504.03 Driving
504.04 Method of Measurement
504.05 Basis of Payment
504.01 Description. This work consists of furnishing and driving steel sheet
piling to be left in place, including furnishing and installing any specified anchors or other attachments to structures.
504.02 Materials. Furnish new sheet piling conforming t o 711.03. The
Contractor may use used sheet piling in good condition that conforms to project requirements provided it is inspected and approved by the Engineer.
504.03 Driving. Drive steel sheet piling to the tip elevation shown on the plans.
Thread each sheet pile with adjacent sheets. Use corner piles, junction piles, and interlocking connectors as necessary so that all sheet piles are interlocked.
504.04 Method of Measurement. The Department will measure Steel Sheet
Piling Left In Place [Minimum Section Modulus of ____ cubic inches per foot (____