Division 500 — Structures

505Pile Driving Equipment Mobilization

OH · 2023 (rev. 7/17/2026) Standard Specifications✓ Full text on BuildSpecBook pages 310–311 Save this section

Ask about Section 505

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

ITEM 505 PILE DRIVING EQUIPMENT MOBILIZATION

505.01 Description. This work consists of mobilizing pile driving equipment to and from the project

site and, as necessary, to install the required piling. This work includes the fixed costs that are related to the installation of the required piling.

505.02 Basis of Payment. The Department will pay for accepted quantities, after the first service

pile is installed, at the contract price as follows: Item Unit Description 505 Lump Sum Pile Driving Equipment Mobilization

Get an email when 505 changes

Ohio revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Construction and Material Specifications, 2023 (rev. 7/17/2026) Edition. Pages 310–311 of 892. View official source ↗

Ask about this section

Scoped to Ohio Construction & Material Specifications, Section 505 — Pile Driving Equipment Mobilization. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.