ITEM 505 PILE DRIVING EQUIPMENT MOBILIZATION
505.01 Description. This work consists of mobilizing pile driving equipment to and from the project
site and, as necessary, to install the required piling. This work includes the fixed costs that are related to the installation of the required piling.
505.02 Basis of Payment. The Department will pay for accepted quantities, after the first service
pile is installed, at the contract price as follows: Item Unit Description 505 Lump Sum Pile Driving Equipment Mobilization