522Structural Plate Corrugated Metal Structures On Footings

OH · 2023 (rev. 7/17/2026) Standard Specifications✓ Full text on BuildSpecBook pages 431–432 Save this section

Ask about Section 522

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

ITEM 522 STRUCTURAL PLATE CORRUGATED METAL STRUCTURES ON FOOTINGS

522.01 Description. This work consists of furnishing structural plate corrugated metal structures

of specified dimensions, including metal bearing angles or channels as required, and erecting same on concrete footings.

522.02 Materials. Furnish plates and bolts conforming to 707.03 or 707.23. Furnish steel bearing

angles or channels conforming to 707.03 or 711.01. Furnish aluminum bearing angles or channels conforming to 707.23.

522.03 General. Properly support the metal bearing angle or channel in the position shown on

the plans before placing footing concrete. Erect the plates according to the manufacturer’s assembly instructions. Hold the unsupported edges of all plates in position using temporary props. Progressively install a sufficient number of bolts to hold the plates in position. Do not tighten bolts unti l tightening will not interfere with the adjustment and matching of additional sections. If using drift pins or pry bars, take care to prevent chipping or injury to the galvanized coating. Tighten the bolts to a final minimum torque of 100 foot-pounds (140 Nm). Within the limits of backfill, field coat the exterior of the 707.03 conduit above the limits of the bedding. The coating material and application shall conform to AASHTO M 243M. Thoroughly seal around all plate seams and bolts. Allow asphalt mastic material to dry for 48 hours and tar base material to dry for 28 hours before placing the conduit backfill. Backfill according to the requirements for 611.

522.04 Method of Measurement. The Department will measure the actual number of feet

(meters) of the corrugated metal structure, installed in place. The Department will determine the length by taking the average of the two side measurements, end to end, at the point of bearing. Excavation will be paid for under Item 203 or 503 as shown on the plans. Concrete footings will be paid for as a separate pay item.

522.05 Basis of Payment. The Department will pay for accepted quantities at the contract price

as follows: Item Unit Description 522 Foot (Meter) ___' ___" (___ mm) Structural Plate Corrugated Metal Structure, ___-inch (___ mm)

Get an email when 522 changes

Ohio revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.