ITEM 523 DYNAMIC LOAD TEST
523.01 Description. This work consists of establishing a driving criteria for all the piles of a
specified shape, cross-section, and ultimate bearing capacity or as specified on the plans to be installed in the structure. This shall be accomplished by applying dynamic loads with a pile hammer during driving of production piles to determine driving requirements. Apply the dynamic load to the piles using a pile hammer that is operating at its normal operating level. Perform restrike tests when specified in the plans
523.02 General. Perform dynamic tests on two successfully tested piles. A successfully tested
pile is one that provides adequate data to provide pile driving criteria as described in 523.04. Test the first two piles driven for each pile size and UBV combination defined in the Plans; the two piles tested should be the two piles furthest apart within the same substructure unit and phase. Perform signal matching analysis of the dynamic test data on at least one of the two test piles. Perform the test according to ASTM D4945 to determine driving requirements to achieve the required ultimate bearing values for the piles to be installed in the structure. Perform restrike tests after piles have been driven and a minimum time specified in the plans has elapsed. When performing a restrike, warm the hammer before restriking the pile by applying at least 20 blows to another pile. Each restrike consists of perfo rming dynamic testing on two piles and performing a signal matching analysis on one of the two piles tested. Test the same two piles as were tested for the dynamic load test item. Use the hammer selected for driving the test piles to drive all piles represented by the test piles. If the Contractor subsequently finds it necessary to use a different hammer or multiple hammers to drive piles represented by dynamic load testing, or if the hammer performance varies subsequent to the dynamic test, complete additional tests at no additional cost to the Department.
523.03 Equipment. Supply all required dynamic testing equipment necessary to run the test set
forth in ASTM D4945. Supply personnel with an Advanced Master, or Expert Level Certification in High Strain Dynamic Pile Testing (HSDPT) from either Foundation QA or the Pile Driving Contractors Association (PDCA) to operate this equipment. Supply the Engineer a copy of the certificate showing that personnel operating dynamic testing equipment are currently certified. Supply all personnel and equipment needed to strike the test piles with the pile hammer.
523.04 Test Report. Perform the dynamic test and signal matching analysis and immediately
provide the Engineer driving criteria for any piles to be driven within the next 48 hours. Within 48 hours after performing the dynamic pile test or restrike tests, supply the Engineer with a written report confirming driving requirements for piles represented by the test. In clude in the report, the required blow count for:
523.05 Basis of Payment. The Department will pay for dynamic load testing after being
provided the written test at the contract price as follows: Item Unit Description 523 Each Dynamic Load Testing 523 Each Restrike