311.05 Processing Existing Base and Surface
192 SECTION 311
311.01 Description
This work consists of removing, processing, reusing, or disposing of existing aggregate surface course, base course, or asphalt surface.
311.02 Materials — Vacant
311.03 Equipment — Vacant
311.04 Construction Methods
Loosen or scarify the aggregate or other material to its full depth and width. Break aggregate or asphalt into pieces that will pass a 3 in [75 mm] sieve. Place the materials in windrows on the subgrade or shoulder. Avoid contamination of base or surface material due to exce ss soil or other foreign material. The Department will not pay for the costs of reworking damaged or contaminated material. Compact processed material used for base courses, shoulders, and drives in Method B, Method C, and Method D to at least 95 percent of maximum density in accordance with AASHTO T 99.
311.05 Method of Measuremen T
The Resident Engineer will measure Processing Existing Base and Surface, Method A , Method B , Method C , and Method D along the centerline to the nearest foot [meter]. CEMENT TREATED BASE 317.03
311.06 Basis of Payment
The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit:
317.01 Description
This work consists of constructing a cement treated base (CTB) using a soil, aggregate, and cement mixture.
317.02 Materials
Provide material in accordance with the following subsections: Material: Subsection: Portland Cement 701.02 Water 701.04 Fly Ash 702.01 Curing Agents 701.07.C Aggregates 703.02 Geotextiles for Bond Breakers 712.1 Provide aggregates that conform to the requirements of Subsection 703.02 , except ensure that the aggregate has an Aggregate Durability Index of at least 30, tested in accordance with AASHTO T 210.
317.03 Equipment
Use equipment for producing and placing the CTB in accordance with Subsection 301.03, “Equipment,” except, only use stationary plants and equipment that combines placement and initial compaction.