General Provisions (00100-00999)

808Pier-Mounted Pole Brackets

OK · 2019 Standard SpecificationsBook pages 818818View official source ↗

808.02 Pier -Mounted Pole Brackets

807.03 Equipment — Vacant

807.04 Construction Methods

Ensure the pole base is no larger than the top flange of the transformer base. The Department will allow slotted anchor bolt holes on the top and bottom flanges of the base. Provide each base with bolts, nuts, washers, and adapting washers as shown on the Plans to connect the base to the pole and anchor bolt s. Install and provide galvanized connecting bolts, nuts, washers, and adaptor plates in accordance with the base manufacturer’s recommendations, including bolt torque. Affix an installation and mounting instruction label, indicating AASHTO/FHWA approval and the year approved, inside each breakaway base, opposite the door. Use shims to level breakaway base poles in accordance with the manufacturer's recommendations. Double nut leveling is not allowed.

807.05 Method of Measuremen T — Vacant

807.06 Basis of Payment

The Department will pay for each pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit: BREAKAWAY BASE Each The Department will consider the cost of hardware, adapter plates, and plastic doors to be included in the contract unit price for Breakaway Base. PIER -MOUNTED POLE BRACKETS

808.01 Description

This work consists of providing and installing pier -mounted pole brackets.

808.02 Materials

Provide materials in accordance with the following sections, subsection, and external reference: Material: Section, Subsection, or External Reference: Structural Steel 724 Galvanizing AASHTO M 111 Electrical Conduit 709 High Strength Fasteners 724.02 LUMINAIRES 809.04

808.03 Equipment — Vacant

808.04 Construction Methods

Fabricate, galvanize, and construct the brackets and install on bridge piers as shown on the Plans.

808.05 Method of Measuremen T — Vacant

808.06 Basis of Payment

The Department will pay for this pay item at the contract unit price per the specified pay unit as follows: Pay Item: Pay Unit: PIER -MOUNTED POLE BRACKET Each SECTION 809 LUMINAIRES

809.01 Description

This work consists of providing and installing roadway and sign lighting luminaires.

809.02 Materials

Provide luminaires with a housing, ballast, reflector, refractor, and lamp of the type and lumen rating shown on the Plans. Submit to the Resident Engineer a list of luminaires to be used on the project that are listed on the QPL. For luminaires not listed on the QPL, submit two (2) hardcopies of a complete materials schedule and proposed equipment, including catalog cuts, diagrams, drawings, and other data, along with a New Product Evaluation Request form, to the Resident Engineer for approval. Fabricate, assemble, and install luminaires as shown on the Plans. Provide luminaires meeting t he Illumination Engineering Society of North America (IES) standards for the size and type of luminaire shown on the Plans. For each size and type of luminaire, submit the following to the Resident Engineer: Manufacturer’s photometric test data Manufactu rer certification that IES -approved test procedures were used

809.03 Equipment — Vacant

809.04 Construction Methods

Install luminaires in accordance with the manufacturer’s recommendations and as shown on the Plans.

Source: Oklahoma Standard Specifications for Highway Construction, 2019 Edition. Pages 818818 of 935.