00240.00 214 Section 00240 - Temporary Drainage Facilities
Description
00240.00Scope - This Work consists of furnishing, installing, and removing temporary drainage
facilities.
Construction
00240.40Construction - Furnish and install temporary drainage facilities of sufficient capacity and
strength to carry traffic over the facility, and water flow in or under the facility. Determine the actual size, strength and type of facility needed. The sizes of facilities shown on the Plans are minimum only. Submit this determination and its basis to the Engineer for review. Do not install until approved.
Remove temporary drainage facilities when they are no longer needed. The facilities remain the property of the Contractor.
Measurement
00240.80Measurement - No measurement of quantities will be made for Work performed under this
Section.
Payment
00240.90Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract lump sum amount for the item "Temporary Drainage Facilities". Payment will be payment in full for furnishing, placing, maintaining, and removing temporary drainage facilities, and for furnishing all Equipment , labor, and Incidentals necessary to complete the Work as specified.