00305Construction Survey Work

OR · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 323–323 Save this section

Ask about Section 00305

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

00305.90 257 PART 00300 - ROADWORK Description 00305 .00 Scope - Provide construction survey work according to the current edition on the date of Advertisement, of the ODOT Construction Surveying Manual for Contractors (see 00110.0 5(e)) .

00305.05 3D Engineered Models - If the Contractor elects to use the 3D Engineered Models to

control the work, provide unstamped 3D Construction Models according to 00150.35 which include the following: An automated machine guidance (AMG) work plan containing a detailed outline, list of the Pay Items and Work that will be controlled by the 3D Construction Models, and a narrative outlining any differences between the Agency prepared 3D Engineer ed Models and the 3D Construction Models. A copy of the 3D Construction Models that will be used by the Contractor’s Equipment for machine guidance or verification that include and represent the Agency prepared 3D Engineered Models with changes identified in the narrative. Provide files in LandXML format or as directed. Measurement

00305.80 Measurement - No measurement of quantities will be made for W ork performed under this

Section. Payment

00305.90 Payment - The accepted quantities of W ork will be paid for at the Contract lump sum

amount for the item "Construction Survey Work". Payment will be payment in full for furnishing all M aterial, Equipment, labor, and Incidentals necessary to complete the W ork as s pecified. No separate or additional payment will be made for any temporary protection and direction of traffic measures including flaggers and signing necessary for the performance of the construction survey work. No separate or additional payment will b e made for preparing surveying documents including but not limited to office time, preparing and checking survey notes, and all other related preparation work. Costs incurred caused by survey errors will be at no additional cost to the Agency. Repair any damage to the Work caused by Contractor's survey errors at no additional cost to the Agency. The Engineer may make an equitable adjustment, which may decrease the Contract Amount, if the required survey work is not performed.

Get an email when 00305 changes

Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 323–323 of 1,268. View official source ↗

Ask about this section

Scoped to Oregon 2024 Standard Specifications for Construction, Section 00305 — Construction Survey Work. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.