B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General Conditions

00442Controlled Low Strength Materials

OR · 2024 Standard SpecificationsBook pages 440440View official source ↗

00442.00 374 Section 00442 - Controlled Low Strength Materials

Description

00442.00Scope - This Work consists of furnishing and placing controlled low -strength

materials (CLSM).

00442.01Definition - Controlled low -strength material is highly flowable lean concrete mix; a mixture

of fly ash, cement, F ine Aggregates, water and admixtures, i f necessary.

Materials

00442.10Materials - Furnish Materials meeting the following requirements:

Fly Ash ................................................................................................. 02030.10 Portland Cement .................................................................................. 02010.10

00442.11Fine Aggregates - Furnish Fine Aggregates that are commercial quality concrete Sand

00442.12Proportioning of CLSM Mixture - Furnish the following, to the Engineer, prior to using

any CLSM on the Project:

• Written certification of proposed CLSM proportions and compressive strength. • 28-Day cylinder reports from a trial CLSM batch based on above certification. Include evidence that compressive strength requirements for specific applications are met.

00442.13Compressive Strength - CLSM shall attain a 28-Day compressive strength of

100 psi - 200 psi.

00442.14Acceptance - Acceptance will be based on the Engineer's review and approval of written

certification and trial batch cylinder reports as required by 00442.12.

Measurement

00442.80Measurement - No measurement of quantities will be made for C LSM

Payment

00442.90Payment - No separate or additional payment will be made for CLSM. Payment will be

included in payment made for the appropriate items under which this Work is required.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 440440 of 1,268.