00545Reinforced Concrete Bridge Approach Slabs

OR · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 564–565 Save this section

Ask about Section 00545

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

00545.00 498 Section 00545 - Reinforced Concrete Bridge Approach Slab s Description 00545. 00 Scope - This Work consists of constructing reinforced portland cement concrete bridge approach slab s at the locations shown or as directed, and in close conformity to the lines, grades and dimensions shown or established. Materials

00545.10 Materials - Furnish Material s meeting the requirements of Section 00530 and

Section 02001, modified as follows: • Furnish Class HPC45 00 concrete for approach slab s, unless shown otherwise. When pipe under approach slabs are shown, provide one of following types: Class V reinforced concrete pipe meeting the requirements of 02410. 10(g) Schedule 80 polyvinyl chloride (PVC) pipe meeting the requirements of ASTM D1785 Type PSM polyvinyl chloride (PVC) sewer pipe meeting the requirements of ASTM D3034 SDR 26 Grade A or B galvanized steel pipe, STD weight class minimum, meeting the requirements of ASTM A53, hot -dip galvanized according to AASHTO M 111 ( ASTM A123) For pipe under approach slab s, provide pipe bedding, pipe zone material , and backfill meeting the requirements of 00405.12, 00405.13, and 00405.14. Provide granular structure backfill meeting the requirements of 00510.13.

00545.15 Quality Control - Provide quality control according to Section 00165.

Labor

00545.30 Quality Control Personnel - Provide technicians having CEBT, CDT, and CSTT technical

certifications. Construction

00545.40 General - Perform Work according to Section 00530 and Section 00540 except as

modified by this Section.

00545.41 Earthwork - Remove Pavement and Subgrade according to Section 00310 and

Section 00330.

00545.42 Surface Finish - For approach slabs with an asphalt concrete wearing surface, a finishing

machine and roadway texturing are not required. For approach slabs without an asphalt concrete wearing surface, texture the approach slab roadway surface by sawcutting according to 00540.50(c). Perform sawcutting on approach slab s no sooner than 14 D ays after the approa ch slab s are cast.

00545.43 Curing - Cure concrete according to 00540.51(a).

00545.90 499 00545.44 Expansion Joints - Construct expansion joints as shown, according to Section 00585, and as follows: • Install armored corners for strip seal joints in preformed blockouts a minimum of 14 D ays after the bridge deck and approach slabs are cast. Set the joint opening as shown. Support the armored corners securely in position before placing concrete in the j oint blockout. • Place compression joint seals or poured sealant joint seals a minimum of 14 D ays after the bridge deck and approach slabs are cast. • Place asphaltic plug joints a minimum of 14 Days after the approach slabs are cast and after final paving is complete.

00545.45 Pipes under Approach Slab s - Install pipes under approach slab s for future utilities as

shown and according to Section 00445.

00545.46 AC Paving - Compact AC abutting approach slabs according to Section 00744 and

Section 00745, as applicable.

00545.47 Bridge Rails - Construct bridge rails on approach slabs as shown and according

to Section 00587. Measurement

00545.80 Measurement - The quantities of reinforced concrete bridge approach slab s will be

measured on the area basis. The area will be determined by surface measurement of the width and length of each separately constructed approach slab. Surface texturing by sawcutting will be measured according to 00540.80. Expansion joints at approach slabs will be measur ed according to 00585.80. Bridge rails on approach slabs will be measured according to 00587.80. Payment

00545.90 Payment - The accepted quantities of reinforced concrete bridge approach slab s will be

paid for at the Contract unit price, per square yard, for the item "Reinforced Concrete Bridge Approach Slabs". Payment will be payment in full for furnishing and placing all Material s, and for furnishing all Equipment , labor, and Incidental s necessary to complete the Work as specified. Surface texturing by sawcutting will be paid for according to 00540.90. Expansion joints at approach slabs will be paid for according to 00585.90 Bridge rails on approach slabs will be paid for according to 00587.90. No separate or additional payment will be made for: • sawcutting and filling the joint in the wearing surface at the roadway end furnishing and placing pipe under the approach slab s for future utilities extra thickness of approach slab as shown required stage construction, including splices

Get an email when 00545 changes

Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 564–565 of 1,268. View official source ↗