00550.00 500 Section 00550 - Precast Prestressed Concrete Members Description
00550.00 Scope - This Work consists of the manufacture, storage, transportation and installation of
precast prestressed concrete girders, box girders, slabs or other concrete members. Precast prestressed concrete members in this Specification will be referred to as members. 00550 .02 Design - Essential elements of design and section dimensions for members are as shown. Submit unstamped Working Drawings , stressing calculations, and detensioning sequence for all members for approval according to 00150.35.
00550.03 Alternate Designs - Agency design specifications will be furnished by the Agency upon
request. The Contractor may propose another type of prestressing system or different member dimensions provided the following requirements are met: • Before manufacturing the members, submit stamped design calculations, Working Drawings , and specifications for all modified members according to 00150.35. • With the calculations, show that the member meets all applicable ser vice and strength limit states used for the Agency design. • Do not increase member dimensions by more than 1 inch, except that bulb width and overall depth may be increased up to 2 inches from the dimensions shown. Where overall depth is increased, verify that the required minimum vertical roadway clearance has been maintained. • Do not incorporate alternate Materials or members into the Work until the proposal has been accepted by the Engineer. • Make any structural changes required to accommodate an approved alternate prestressing system or section at no additional cost to the Agency.
00550.04 Member Tolerances:
00550.05 Fabricator Certification and Q ualification - Certification under the PCI Plant Certification
Program is required for all plants producing precast prestressed concrete bridge members. Certification in Bridge Group B3 or Bridge Group B4 is mandatory for the fabrication of prestressed straight strand bridge members. Certification in Bridge Group B4 is mandatory for the fabrication of prestressed draped strand bridge members. Materials
00550.11 Materials - Furnish Material s meeting the following requirements:
00550.20 Backer Rod ........................................................................................... 02440.14 Concrete Coating ....................................................................................... 02210 Concrete ..................................................................................................... 02001 Deformed Bar Reinforcement ................................................................ 02510.10 Epoxy and Non-Epoxy Grouts .................................................................... 02080 Epoxy Coating ....................................................................................... 02510.11 Keyway Grout ........................................................................................ 02080.30 Portland Cement Concrete Repair Material ................................................ 02015 Hot Applied Joint Sealant ...................................................................... 02440.30 Prestressing Reinforcement ....................................................................... 02515 Tie Rods ................................................................................................ 02560.30
00550.12 Acceptance of Concrete - Acceptance of concrete will be according to Section 00165 and
the following:
00550.20 Prestressing Equipment - Provide hydraulic jacks equipped with calibrated pressure
gauges. Calibrate the jack and gauge combination and furnish a graph or table showing the calibration to the Engineer. 00550.25 502 If other types of jacks are used, furnish calibrated proving rings or other devices that accurately indicate the jacking forces. Recalibrate the jack and gauge combination annually or at any time the results are in question.
00550.25 Vibrators - Provide either internal or ex ternal vibrators in working condition meeting the
manufacturer's rating. When epoxy coated reinforcement is used, use internal vibrators fitted with a manufactured rubber head to minimize damage to the epoxy coating. Construction
00550.40 Forming - Provide forms that are mortar -tight and sufficiently rigid to conform to the
specified dimensions without appreciable distortion, warping or opening of joints. Before placing concrete in the forms, remove all dirt, sawdust, excess wat er and other foreign material. Tighten forms before depositing new concrete on or against hardened concrete.
00550.41 Placing Reinforcement - Place reinforcement according to the Plans , Section 00530, and
the Specifications.
00550.42 Pretensioning :
• Do not proceed with stressing prior to receiving the Engineer's approval of stressing calculations submitted according to 00550.02. • Provide a person, skilled i n the use of the system of prestressing to be used, to supervise the Work and assist the Engineer. • Hold the prestressing strands accurately in position and stress by jacks meeting the requirements of 00550.20. • Determine the force induced in the strands by measurement of elongation and, independently, by direct measurement of force using a pressure gauge dynamometer and load cell. If the difference in force determination for the two methods exceeds 5 percent, determine the cause and correct it. • Measure stra nd elongation on the first and last strands stressed, and on at least 10 percent of the other strands in the bed. • Record the jacking forces and the elongations produced. • In single straight strand tensioning, and in a completely open bed with no headers or other possible sources of friction, loads indicated by the gauging system may be used.
00550.43 Placing Concrete :
00550.44 Hot or Cold Weather - Produce and p lace concrete within the temperature range specified
in 02001.20(d). When the air temperature is, or is expected to be, below 40 °F or above 100 °F, observe the following precautions: • Do not place concrete on forms, reinforcing steel or appurtenances when the temperature of these facilities is below 40 °F. Provide heat to maintain their temperature at 40 °F minimum. • Do not place concrete when the form temperature is 100 ° F or more.
00550.45 Curing - Cure members with low -pressure steam or radiant heat inside a suitable
enclosure to contain the steam or heat, and minimize moisture and heat loss.
00550.46 Release of Prestress - Transfer bond stress to the concrete, or release end anchors, only
when the concrete has attained the minimum compressive strength shown or specified for such transfer of load. Cut or release the elements according to the sequence shown on the reviewed Working Drawings so lateral eccentricity of prestress will be a minimum. Determine the compressive strength of the concrete to establish time for detensioning by testing standard cylinders cast and cured identically with the member. Cast and test cylinders used to determine release time according to AASHTO T 22 and AASHTO T 23.
00550.47 Surface Finish - Apply the specified finish to each surface as shown or specified.
Where no finish is shown or specified, provide a Class 1 surface finish to all exposed concrete surfaces, except on the tops of members, unless shown otherwise. For concrete surfaces that are not exposed, provide a general surface finish except on the tops of members. For surfaces receiving a Class 1 surface finish (ground and coated), finish the surfaces when the member is in its final position and finish to a point 1 foot below the finished ground line. After the concrete has been floated to produce a uniform surface and hardened sufficiently, provide a uniform textured finish on the top of members using a tool with 1/8 inch wide tines spaced 3/4 inch apart that will mark the finished surface to a depth of 1/8 inch to 3/16 inch. Do not overlap the texturing. Produce the texture transverse to the roadway centerline and full member width. In addition for members with an overlay less than 3 inches thick, struck the concrete to grade and Cross Section and provide a uniform surface according to 00540.55. For the top of members used as a roadway surface, strike the concrete to grade and Cross Section and float it to produce a uniform smooth surface according to 00540.55. After the members are erected in the final position, provide deck roadway finish as shown. If not shown, provide deck roadway texturing according to 00540.50(c).
00550.48 Exposed Reinforcement - After a member is removed from the casting bed, clean any
projecting reinforcement of dirt, oil, grease, rust and corrosives and protect it from damage until concrete is cast around it.
00550.49 Lifting, Storing, Transporting, Erecting, and Bracing - Be responsible for the safety of
precast members during all stages of construction. Include lifting and storage details on the Working Drawings for all precast members. Lifting, storage, transporting, erecting, and bracing details will not be reviewed by the Engineer. Lifting, storage, transporting, erecting and bracing of members is the sole responsibility of the Contractor subject to the following requirements:
00550.50 Tie Rods - Furnish tie rods according to the Plans and Section 02560. Install as follows:
• Clean and lubricate tie rods and nuts before installation. • Lubricate galvanized tie rods and nuts with a lubricant from the QPL containing dye that visibly contrasts with the color of galvanizing or coating. • Install compressible washer type direct tension indicators under the turned nuts and tighten the nuts as recommended by the manufacturer until the gaps in the indicators are nil or as shown. A nil gap is defined as a gap when the number of spaces between the protrusions of a direct tension indicator in which the 0.005 inch feeler gauge is refused at each tie rod equals or exceeds 2, 3, 3, 4, or 4, when the number of spaces between protrusions in the direct tension indicator are 4, 5, 6, 7, or 8, respectively, and a visible gap exists in at least one space.
00550.51 Keyway Grouting for Slabs, Box Beams, and Integral Deck Members - After forms
have been removed from slabs, box beams and integral deck bulb tees, sandblast all keyways to remove residual form oil and any other foreign material. After the members are in place and the tie rods are tensioned (for slabs and box beams) or welded connections are made (integral deck bulb tee girders), clean the keyways of all foreign material and keep moist for 24 hours before grouting. For slabs and box beams, after the tie rods are tensioned, seal the space remaining at the bottom of the keyways with a backer rod as shown before grouting. Do not pour keyway grout unless the air temperature is above 45 °F and at or below the maximum air temperature recommended by the manufacturer. Water cure grout for the period of time indicated by the manufacturer.
00550.52 Hot Applied Joint Sealant for Integral Deck Members with AC Wearing Surface - After
grout is poured to the level of the keyway shown for slabs and box beams, remove loose grout, and other foreign material from exposed keyway walls. After keyway grout is fully cured, dry surfaces to be sealed immediately before installing hot applied joint sealant. Install hot applied joint sealant according to the manufacturer's directions. Cure the filler sufficiently to resist the pressures and temperatures of the paving operation before the wearing surface is placed.
00550.53 Differential Camber Correction for Adjacent Precast Prestressed Concrete Members
with No ACP Wearing Surface or with No Cast-in-place Concrete Deck - Correct differential Camber between adjacent slabs, box beams or integral deck bulb tee girders in a span (measured in place at the site) by a method approved by the Engineer if the variance between adjacent members or stages is 1/4 inch or more at the top edge corners at midspan. 00550.90 Equalize the Camber differences by either Patching with an epoxy or non-epoxy grout or other approved method, at no additional cost to the Agency. Before Patching, clean the area by sandblasting. Water cure the patch for the period of time indicated by the manufacturer. If Patching is used, slope it away from the joint on a 1V:6H Slope or flatter. Measurement
00550.80 Measurement - The quantities of Work performed under this Section will be measured on
the length basis, and will be the sum of the horizontal lengths shown for each type and size of member. Field measurement of each member length will not be made. The quantities will be determined by calculating the theoretical horizontal length shown, added together for a total for each type and size. Stirrup extension reinforcement will be measured according to 00530.80. Estimated quantities of reinforcement for the lump sum method will be listed in 00530.80(a) of the Special Provisions. Payment
00550.90 Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement