00706.00 704 Section 00706 - Emulsified Asphalt Slurry Seal Surfacing Description
00706.00 Scope - This Work consists of applying one or more layers of slurry seal consisting of
Emulsified Asphalt , water, Aggregate, and additives on a prepared surface as shown or directed. Materials
00706.10 Emulsified Asphalt - Furnish CQS -1h Emulsified Asphalt meeting the following
requirements when tested according to AASHTO T 59: Saybolt Viscosity, seconds at 77 °F ..................... 15 - 50 Residue from Distillation, Weight % ..................... 57% minimum Sieve Test, % Retained on No. 20 Sieve ............. 0.1 maximum Particle Charge, Electroplate ................................ (informational) Settlement (Storage Stability), 24 hour ................. 1% maximum Cement Mixing Test ............................................. (informational) The residue shall meet the following requirements : Penetration at 77 °F, 3.5 ounces, 5 sec ............... 40 - 90 minimum Solubility in CS 2 or TCE ........................................ 97.5 minimum Ductility at 77 °F, inch ........................................... 15.7 minimum
00706.11 Polymer Modified Emulsion - Furnish CQS -1h polymer modified emulsion. The polymer
modifier shall be either a solid synthetic rubber or latex material. Combine the polymer modifier with the base asphalt or asphalt emulsi on, prior to loading at the manufacturing plant, at the minimum rate of 2.5 to 3 percent polymer solids by weight of asphalt. The polymer modified emulsion shall be compatible with the mix design developed for the conventional slurry seal. Each shipment of Emulsified Asphalt shall be accompanied by a certificate of analysis or certificate of compliance from the manufacturer.
00706.12 Aggregate - The Aggregate used shall be clean, angular, durable, well graded and
uniform. The Aggregate shall consist of broken stone, crushed G ravel, slag or a combination of them. To assure the Material is totally crushed, 100 percent of the parent Aggregate shall be larger than the largest stone in the gradation to be used. Aggregate gradation shall meet one of the following types: 00706.15 TYPE I - Parking Areas, Urban and Residential Streets, Airport Runways TYPE II - Urban and Residential Streets, Airport Runways TYPE III - Primary and Interstate Routes Sieve Size Percent Passing Percent Passing Percent Passing Stockpile Tolerance 3/8" 100 100 100 0 No. 4 100 90 - 100 70 - 90 ± 5% No. 8 90 - 100 65 - 90 45 - 70 ± 5% No. 16 65 - 90 45 - 70 28 - 50 ± 5% No. 30 40 - 65 30 - 50 19 - 34 ± 5% No. 50 25 - 42 18 - 30 12 - 25 ± 4% No. 100 15 - 30 10 - 21 7 - 18 ± 3% No. 200 10.0 - 20.0 5.0 - 15.0 5.0 - 15.0 ± 2.0% The job mix gradation shall be within the gradation band for the desired type. After the target gradation has been submitted then the percent passing each sieve shall not vary by more than the stockpile tolerance and still remain within the gradation band.
00706.13 Additives and Mineral Filler - Liquid retardant and mineral fillers may only be used when
their quantity can be metered. The use of additives in the slurry mix, (or individual Materials), shall comply initially with the quantities predetermined by the mix design, or with field adjustments if required, after approval by the Engineer . Portland cement, hydrated lime, limestone dust, fly ash or other approved filler required by the mix design shall meet the requirements of ASTM D242, and shall be considered as part of the dry Aggregate.
00706.14 Water - Water shall be potable, free of harmful salts and contaminants, and compatible
with the slurry mix. Water used in mixing or curing shall be reasonably clean and free of oil, sugar, organic matter or other substance injurious to the finished product.
00706.15 Job Mix Formula - Prior to the pre -construction conference, submit a signed slurry seal
mix design for the specific Materials to be used on the Project. Show the percentages of each individual Material required on the mix design report . The complete mix design shall be made with the same Aggregate gradation that will be used on the Project. After the mix design has been approved no substitution will be allowed unless approved. Water, not exc eeding 11 percent by weight to asphalt emulsion, shall be used to develop a good mix.
00706.17 Quality Control - Be responsible for qualit y control as required by Section 00165. Perform
quality control sampling and testing as follows:
00706.20 Equipment - Provide suitable surface preparation Equipment , traffic control Equipment ,
hand tools and any other support Equipment required as necessary to perform the Work .
00706.21 Mixing Equipment - The machines shall be specifically designed and manufactured to lay
slurry seal. Mix slurry seal in continuous pug mill mixers; a self -propelled machine specifically designed and manufactured to accurately deliver and proportion the Aggregate, Emulsifi ed Asphalt , mineral filler, control setting additive and water to a revolving blade mixer that discharges the thoroughly mixed product on a continuous flow basis. Concrete transit mixer trucks shall not be used. Minimum slurry seal machine size shall be 7 cubic yards. In the case of Equipment failure have a minimum of two machines on -site with another off site for immediate backup. The machine shall be capable of mixing materials at pre-set proportions regardless of the speed of the machine and without changing machine settings. The mixing machine shall be equipped with an approved fine feeder that provides an accurate metering device or method to introduce a predetermined proportion of mineral filler into the mixer at the same time and location that the Aggregate is fed. Use the fine feeder whenever added mineral filler is a part of the Aggregate blend. 00706.22 708 The mixing machine shall be equipped with a water pressure system and fog type spray bar adequate for complete fogging of the surface preceding spreading Equipment .
00706.22 Spreading Equipment - Spreader Box - Attach to the mixer machine a mechanical type
squeegee distributor equipped with flexible material that is in contact with the Pavement surface to prevent the loss of slurry from the distributor. Adjust the distributor to prevent the loss of slurry on varying grades and crown and to assure uniform spread. There shall be a steering device and a flexible strike-off. The spreader box shall have an adjustable width. Keep the spreader box reasonably clean, and do not allow buildups of asphalt and Aggregate. Only one tail rubber will be allowed. Any type of drag used shall be subject to approval by the Engineer and kept in a completely flexible condition at all times.
00706.23 Rollers - If required by Special Provision, rollers shall be self-propelled, steel-wheeled or
pneumatic-tired type and be equipped with a water spray system. Steel-wheeled rollers shall be capable of providing a weight of not less than 2,400 pounds per foot width of the compression roll or rolls. Pneumatic-tired rollers shall be capable of exerting a ground pressure of not less than 80 pounds per square inch of tire contact area. Labor
00706.30 Quality Control Personnel - Provide a technician having a CAT-I technical certification.
Construction
00706.40 Weather Limitations - Do not apply the slurry seal if either the Pavement or air
temperature is below 50 °F and falling. The slurry seal may be applied when both the Pavement and air temperature are above 45 °F and rising. Do not apply if there is a danger that the finished product will freeze before 24 hours. Do not apply when weather conditions prolong opening to traffic beyond a reasonable time. Do not apply in the rain. Replace slurry damaged by rain after application according to the Specifications, and as determined by Engineer, at no additional cost to the Agency. Clean the street of all remaining slurry mix materials prior to re-application. Adjust the rate of application of the fog spray during the Day to suit temperatures, surface texture, humidity and dryness of Pavement surface. Do not spray additional water into the spreader box.
00706.41 Preparation of Surface - Submit details of the proposed street cleaning for approval by
the Engineer prior to the preconstruction conference. Remove any organic materials in cracks or joints not removed during crack sealing as part of the Pavement preparation. 00706.43 Pavement preparation shall consist of removal of all oil spills, flushing and sweeping. Complete flushing, as needed, prior to sweeping. Finish sweeping with a vacuum sweeper no more than 24 hours prior to application of the slurry seal. If there is a delay of more than 48 hours between sweeping and slurry sealing caused by weather conditions or other unforeseen circumstances, re-sweep as determined by the Engineer, at no additional cost to the Agency. Prepare the Pavement on which the slurry seal is to be placed as follows, as directed.
00706.42 General - The surface may be wetted by fogging ahead of the slurry box, if required by
local conditions. Apply water used in wetting the surface at such a rate that the entire surface is damp with no apparent flowing water in front of the slurry box. The slurry mixture shall be of the desired consistency upon leaving the mixer. Do not add additional elements. Carry a sufficient amount of slurry in all parts of the spreader at all times so that complete coverage is obtained. Do not allow lumping, balling or unmixed Aggregate in the spreader box. Do not allow segregation of the emulsion and Aggregate fines from the Coarse Aggregates. If the Coarse Aggregate settles to the bottom of the mix, remove the slurry from the Pavement. Do not allow excessive breaking of the emulsion in the spreader box. Do not leave streaks, such as caused by oversized Aggregate, in the finished Pavement. Maximum mixing time in the pug mill shall be 4 minutes.
00706.43 Application Rate - The minimum rate of application of dry Aggregate per square yard will
be determined by the Engineer. The depth of the slurry seal shall be sufficient to correct surface conditions, fill surface voids, and provide sealing and a minimum wearing surface. The maximum allowable vehicle speed for the rate of application shall be 180 feet per minute. Failure to demonstrate 00706.44 the proper rate of application will result in suspension of the Work until the Contractor can demonstrate otherwise, at no additional cost to the Agency. ISSA TB112 gives a method to determine expected application rates. The slurry seal mixture shall be of proper consistency at all times to provide the application rate required by the surface condition. The average application rate, as measured by the Engineer, shall be according to the following table: Recommended Use Application Rate TYPE I Parking Areas, Urban and Residential Streets, Airport Runways 6.7 - 10.0 lbs./sq. yd. TYPE II Urban and Residential Streets, Airport Runways 10.0 - 16.7 lbs./sq. yd. TYPE III Primary and Interstate Routes 15.0 - 25.0 lbs./sq. yd.
00706.44 Applying Slurry Seal Sample Strip - The strip shall consist of two Panels approximately
50 feet long, placed side by side to form a typical seam between them. The width of the Panels shall be the same as the Contractor plans to use on the streets. Place the strip at least 24 hours prior to the beginning of the actual Work. Use the strip to calculate and monitor the rate of application in relation to weight of material per area, and to define the speed of the Equipment related to the rate of application. If it is determined by the Engineer on the basis of this test strip that there are deficiencies in the mix design, method of application and rate of application, the Engineer may require the Contractor to revise the mix design, or repair or modify the Equipment or application. After all changes are made, lay a new sample strip.
00706.45 Joints - Construct a uniform line along the edge and a good seal at curb lines. Construct
the flow line at curbs to allow storm drainage flow to catch basins without bonding along the curb line. In the case of a concrete gutter, cover the gutter line joint with the slurry seal, but do not overlap onto the gutter. Remove any overlap, as determined by the Engineer, at no additional cost to the Agency. Streets that have been recently slurry sealed that cross this Project shall not be slurry sealed again. The slurry joints and Panels shall be straight, neat and uniform and follow the contour of the existing curb or concrete gutter. The width of the Panels shall be the same as demonstrated in the sample strip. Floating (adding additional water other than what is required for the approved mix design) of the emulsion or slurry mixture in the pug mill or spreader box to cover or overlap missed areas will be prohibited. Keep lines straight at intersections to provide a good appearance.
00706.46 Handwork - Use approved squeegees to spread slurry in areas not accessible to the slurry
mixer. Limit handwork at the beginning and end of the Panels to prevent segregation of the Rock from the emulsion and to minimize cosmetic drag mop marks or defects in the finished product. The same type finish as applied by the spreader box shall be required. Complete handwork prior to setting of the slurry.
00706.47 Curing - The rate of curing of the slurry seal shall be such that a street may be opened to
traffic after application without tracking or damage to the surface. Protect the area for the full curing period with suitable barricades or markers. The Agency will not be responsible for any damage to the slurry seal prior to opening the area. Repair all damage to the slurry, to the satisfaction of the Engineer, at no additional cost to the Agency. 00706.90
00706.48 Rolling - If required by Special Provision, apply a minimum of two full Coverage Passes to
the surfaced areas by the roller, or as directed.
00706.49 Cleanup - Remove all debris associated with the performance of the Work on a daily basis.
Temporary
00706.51 Provision for Traffic - Be responsible for notifying all abutting property owners along the
streets according to the approved schedule, or an approved revision of the schedule, 48 hours prior to the specific Work. Remove all traffic control promptly when it is determined that the street may be open to traffic. Do not seal any street that requires closing overnight without the approval of the Engineer. If the slurry seal does not cure in a timely manner and remains trackable overnight, apply a covering of 1/4 inch minus Material to prevent tracking and related property damage prior to permitting traffic on the street at no additional cost to the Agency. Be responsible for all damage to the uncured slurry or to private or public property due to tracking of the uncured Material. Measurement
00706.80 Measurement - Crack sealing will be measured on the length basis, of Material in place.
Slurry seal will be measured on the area basis. Asphalt concrete Pavement repair will be measured according to 00748.80. Payment
00706.90 Payment - The accepted quantities of Work performed under this Section will be paid for
at the Contract unit price, per unit of measurement, for the following items: Pay Item Unit of Measurement