03020.00 1160 Section 03020 - Erosion Materials
Description
03020.00Scope - This Section includes the requirements for erosion control Materials
Materials
03020.10Commercially Manufactured Compost - Furnish commercially manufactured compost
that:
• Is processed through thermophilic composting meeting the EPA's definition of "Process to Further Reduce Pathogens". • Is from a commercial compost facility that holds a current DEQ composting permit or is registered with DEQ as a composting facility. • Meets the requirements of the US Composting Council (USCC) and its Seal of Testing Assurance (STA) program. • Contains a minimum 65 percent by volume of the following recycled plant waste: • Source -separated yard and garden wastes • Wood wastes • Agricultural crop residues • Wax-coated cardboard • Preconsumer vegetative food wastes • Other similar source -separated materials that the DEQ has determined to have a comparable low level of risk in hazardous substances, human pathogens, and physical contaminants. • Manure or biosolids based composts when approved. • Meets the following compost particl e size and media parameters:
Compost Particle Size Compost Type Sieve Size Fine* Medium* Coarse** Percent Passing (By Dry Weight) 3" 100 100 100 1" 99-100 95-100 90-100 3/4" 99-100 95-100 70-100 5/8" 95-100 90-100 70-100 1/2" 80-100 70-100 60-100 1/4" 75-100 70-90 30-60 * maximum 3 inch particle length ** maximum 6 inch particle length
03020.90 1161 Media Parameters Test Test Method Requirements Physical Contaminants* TMECC** 03.08 -A Less than 1.0% Organic Matter TMECC** 05.07 -A 35% (Minimum) pH TMECC** 04.11 -A 6.0 to 8.5 Soluble Salt Concentration TMECC** 04.10 -A 5 dS/m (Maximum) Total Carbon Total Nitrogen TMECC** 04.02 -D TMECC** 04.02 -D Carbon/Nitrogen Ratio Fine Medium Coarse <25:1 <30:1 <35:1 Stability TMECC** 05.08 -B ≤8 Maturity TMECC** 05.05 -A 80% or Greater Moisture Content TMECC** 03.09 -A 35-60% (Wet Weight) * Man-made Inert ** Test Methods for Evaluation of Compost and Composting
03020.90Acceptance - Acceptance of commercially manufactured compost Material will be the
following:
• Copies of STA lab analysis. • Copy of DEQ permit or registration of the compost producer.
Blank Page
INDEX - 1 INDEX A Access to the work ............................................................................................................. 38, 69, 116 ADA ......... See Temporary Pedestrian Accessible Route Plan , See curb ramps , See temporary curb ramp, See miscellaneous portland cement concrete structures Additives Adhesive Adjusting Admixtures ........................................................................................................................ See Additives Aggregates asphalt concrete pavement ................................................................................................. 757, 770 base .......................................................................................................................... 691, 693, 1133 emulsified asphalt concrete ................................................................................................ 735, 736 shoulder .................................................................................................................... 691, 693, 1135 Allowances Anchor bolts
INDEX - 2 guardrail ............................................................................................................................ 849, 1141 Application rates emulsified asphalt surface treatment .................................................................................. 729, 730 Approval of Arch corrugated metal pipe ....................................................................................................... 375, 1093 structural plate pipe .......................................................................................................... 389, 1097 Arrow signs sequential ................................................................................................................... 172, 175, 176 Asphalt in asphalt concrete pavement ............................................................................................. 759, 774
Asphalt concrete
Asphalt concrete pavement
aggregate............................................................................................................................ 757, 770
broadband limits ................................................................................................................. 760, 775
cement, additives, treatment ............................................................................................... 759, 774
compaction ......................................................................................................................... 766, 788
hauling, depositing, and placing .......................................................................................... 741, 786
job mix formula ................................................................................................................... 760, 776
pavers ................................................................................................................................. 762, 782
rollers .................................................................................................................................. 762, 782
seasons and temperature limits .......................................................................................... 762, 784
smoothness ........................................................................................................................ 767, 791
INDEX - 3
tolerances and limits ........................................................................................................... 761, 777
Attenuators
Authority
Automated flagger assistance device ..................................................................... 178, 181, 183, 184
B
Backfill
trench .................................................................................................................................. 330, 333
Barbed wire fence ................................................................................................................ 999, 1157
Barrier
Base
aggregate.................................................................................................................. 691, 693, 1133
Bearings
Beginning and end of contract time ........................................................................................ 114, 115
Bid
rejection .................................................................................................................................. 23, 25
Bidder
BidExpress®....................................................................................................... 14, 15, 19, 21, 22, 23
Bills
INDEX - 4
Blasting
Bolts
Bonds
Boulder excavation ................................................................................................................. 335, 336
Bridge decks
Bridge rail ............................................................................................................................. 592, 1140
Bridges
concrete ..............................................................................................................See Concrete bridges
steel ........................................................................................................... See Structural steel bridges
Broadband limits
asphalt concrete pavement ................................................................................................. 760, 775
Brooming
C
Cable and wire
INDEX - 5
Cement
asphalt for asphalt concrete pavement ............................................................................... 759, 774
Certificate
Certified Payroll .................................................................................................................... 72, 81, 83
Chain link fence .................................................................................................................. 1000, 1157
Channelizing devices
bicycle ................................................................................................................................. 160, 211
Clear zone
Coating steel structures
Coatings
Cold plane pavement removal
INDEX - 6
Compaction
aggregate base ................................................................................................................... 691, 696
asphalt concrete pavement ................................................................................................. 766, 788
Compactors .......................................................................................................................... See Rollers
Concrete
Concrete barrier
Concrete bridges
falsework............................................................................................................................. 480, 482
mix tolerances and limits................................................................................................... 476, 1047
surface finish....................................................................................................................... 491, 494
Concrete overlays, structures ................................................................................................. 515, 533
Concrete pavement
acceptance of concrete ....................................................................................................... 805, 824
classes of concrete ............................................................................................................. 804, 823
curing .................................................................................................................................. 814, 832
INDEX - 7
handling, measuring, and batching material ....................................................................... 810, 828
joints ................................................................................................................................... 812, 830
materials ............................................................................................................................. 804, 823
mix designs ......................................................................................................................... 805, 823
mixing concrete ................................................................................................................... 810, 828
placing concrete .................................................................................................................. 810, 828
preparation of base ............................................................................................................. 808, 827
quality control...................................................................................................................... 805, 824
surface finishing .................................................................................................................. 813, 831
surface tolerances, testing and correction .......................................................................... 815, 833
thickness ............................................................................................................................. 817, 835
weather limitations .............................................................................................................. 808, 827
Concrete structures ................................................................................................See Concrete bridges
Concrete structures, miscellaneous
Concrete, portland cement
pipe ................................................................................................................................... 375, 1088
Conduit
Continuously reinforced concrete pavement ....................................................... See Concrete pavement
Contract
INDEX - 8
Contract payment
Contraction joints............................................................................................................ 812, 830, 843
Contractor
Contractor furnished ......................................................................................................... 93, 713, 726
Contractor(s)
Costs
Culvert
INDEX - 9
Curb cuts ........................................................................................................................ See curb ramps
temporary.................................................................................................................... 159, 211, 212
Curbs
commercial grade concrete................................................................................................. 400, 840
Curing
portland cement concrete pavement ................................................................................... 814, 832
Cutoff
D
Damages
Delay(s)
Density requirements .................................................................................................... See Compaction
Disposal
INDEX - 10
Doc Express® .................................................................................................................... 40, 75, 157
Drains
Drilled shafts
joints ........................................................................................................................... 438, 482, 907
Dust control
E
Earthwork ............................................................................................. See Embankment and Excavation
blasting ............................................................................................................................... 270, 284
Embankment
Emulsified asphalt chip seal
Emulsified asphalt chip seal
Emulsified asphalt concrete pavement
INDEX - 11
Emulsified asphalt surface treatment
quality control...................................................................................................................... 727, 728
Environmental protection
Epoxy
Equipment
Erosion and sediment control
manager.............................................................................................................................. 226, 232
Errors
Establishment
INDEX - 12
Estimates
Excavation
Expansion joints
portland cement concrete pavement ................................................................................... 812, 830
Extra work .............................................................................................................................. 140, 141
F
Failure to
barbed and woven wire ..................................................................................................... 999, 1157
bridge protective ............................................................................................................. 1001, 1158
chain link ......................................................................................................................... 1000, 1157
gates and gateways ........................................................................................................ 1001, 1158
grounding ........................................................................................................................ 1001, 1158
Fencing
Fertilizer
plants .................................................................................................................................. 976, 983
seeding ............................................................................................................................... 958, 963
Final
INDEX - 13
Finishing
concrete pavement ............................................................................................................. 813, 831
First notification ............................................................................................................................ 8, 31
Flaggers
Foot board measure (FBM) .................................................................................................... 123, 896
Footings
sign supports ...................................................................................................................... 897, 899
Force account......................................................................................................................... 140, 141
Frames, grates, covers and fittings ...................................................................................... 396, 1100
G
Galvanizing
General excavation
boulder ................................................................................................................................ 268, 271
General provisions
Geosynthetics....................................................................................................................... 293, 1079
INDEX - 14
Girders
Grades
Grates, frames, covers, and fittings ...................................................................................... 396, 1100
Grinding
asphalt concrete pavement ................................................................................................. 767, 792
Grooving pavement ................................................................................................................ 813, 831
Grounding
Grout
Grubbing................................................................................................................................. 262, 263
Guardrail
metal ................................................................................................................................. 849, 1141
H
Handrail
Hauling, depositing, and placing
asphalt concrete pavement ................................................................................................. 764, 786
Hazardous
INDEX - 15
Highway
Highway illumination ...................................................................................................... See Illumination
Hydrants ............................................................................................................................. 1036, 1107
I
Illumination
luminaires ......................................................................................................................... 946, 1151
Impact attenuators
Inspection
Insurance
INDEX - 16
Irrigation
J
Job mix formula
asphalt concrete pavement ................................................................................................. 760, 776
Joint filler
Joints
asphalt concrete pavement ......................................................................................... 764, 787, 788
emulsified asphalt concrete pavement ................................................................................ 743, 744
portland cement concrete pavement ................................................................................... 812, 830
K
L
Labor
Landscape
INDEX - 17
Laws
Legends.................................................................................................................................. 888, 892
Lighting
Lining, pipe ............................................................................................................................. 342, 345
Longitudinal joints, portland cement concrete pavement........................................................ 812, 831
Lumber and timber, structural............................................................................................... 564, 1073
Luminaire....................................................................................................................... See Illumination
M
Manholes and inlets
adjusting ............................................................................................................................. 404, 406
materials ........................................................................................................................... 394, 1100
Manufacturer's representative
INDEX - 18
Markers
Materials
Materials on hand ............................................................................132, 135, 136, 697, 714, 727, 994
Mechanically stabilized earth retaining walls ..................................................... See MSE retaining walls
Metal structures, miscellaneous
guardrail posts .................................................................................................................. 849, 1141
Metal, incidental structures
Methods of curing ................................................................................................................. See Curing
Mix designs
asphalt concrete pavement ................................................................................................. 760, 776
portland cement concrete pavement ......................................................................... 805, 823, 1043
structural concrete ............................................................................................................ 476, 1043
Mixing
portland cement concrete pavement ................................................................................... 810, 828
Mixing temperatures
INDEX - 19
Moisture, excess in embankment construction ....................................................................... 270, 271
Mulch
plants .................................................................................................................................. 979, 987
seeding ............................................................................................................................... 959, 963
N
Notification........................................... See First notification, See second notification, See third notification
O
Open graded
Orange mesh fencing ........................................................................................... See work zone fencing
Orange mesh fencing for delineation .................................................................... See work zone fencing
INDEX - 20
P
Painting steel bridges ................................................................................... See Coating steel structures
Pavement
asphalt concrete ................................................................................................................. 757, 769
groove in portland cement concrete .................................................................................... 813, 831
joints for portland cement concrete ..................................................................................... 812, 830
Pavement markings
Pavement repairs
Pavers
asphalt concrete pavement ................................................................................................. 762, 782
portland cement concrete pavement ................................................................................... 806, 825
Payment
material on hand ................................................................................................................. 135, 137
INDEX - 21
Piles
materials ................................................................................................................. 443, 1072, 1115
steel .................................................................................................................................. 451, 1115
Pilot cars
Pipe
air test ....................................................................................................................... 344, 382, 1088
boulder excavation .............................................................................................................. 268, 271
irrigation ............................................................................................................................ 375, 1012
structural plate .................................................................................................................. 389, 1097
water test .............................................................................................381, 1026, 1034, 1037, 1040
Pipe lining
INDEX - 22
Pipes
Plans
Plant mixed aggregate base and shoulders ........................................................................... 694, 695
Planting
inspection............................................................................................................................ 977, 990
mulch .................................................................................................................................. 979, 987
watering .............................................................................................................................. 980, 988
weather limitations .............................................................................................................. 971, 981
Pneumatic tired rollers
Pollution control
Portable changeable message sign ............................................................................... 158, 172, 175
Portland cement concrete.................................................................................................. See Concrete
Posts
fence ............................................................................................................................... 1070, 1157
guardrail .......................................................................................................................... 1068, 1141
sign ........................................................................................................................... 896, 911, 1070
INDEX - 23
Potable water
disinfecting ...................................................................................................................... 1026, 1029
pipes and fittings ............................................................................................................. 1022, 1102
service connections ........................................................................................................ 1026, 1039
testing pipes and fittings ................................................................................................. 1026, 1040
Power and telephone lines, etc .................................................................................................. 43, 95
Power service
Pre-coated aggregate asphalt chip seal
Pre-coated aggregate asphalt surface treatment
quality control...................................................................................................................... 720, 722
Price adjustments ........................................................................................................... 128, 131, 140
Process control......................................................................................................... See Quality control
Protection
cultural resources and sites ................................................................................................ 254, 255
INDEX - 24
work during suspension ...................................................................................................... 116, 162
Q
Qualification of welders
Quality control
asphalt concrete pavement ......................................................................................... 774, 778, 784
emulsified asphalt chip seal ................................................................................................ 714, 715
emulsified asphalt concrete pavement ................................................................................ 737, 740
emulsified asphalt slurry seal .............................................................................................. 707, 708
emulsified asphalt surface treatment .................................................................................. 727, 728
portland cement concrete pavement ................................................................... 805, 807, 824, 826
pre-coated aggregate asphalt surface treatment ................................................................ 720, 722
Quantities of materials
R
Railing
bridge ................................................................................................................................ 592, 1140
Reclaimed asphalt pavement ................................................................................................. 758, 773
INDEX - 25
Reinforced concrete
Reinforcement for concrete .................................................................................................. 456, 1110
Removal
Repair
Restrictions
Retaining walls
cast-in-place concrete .......................................................... See Cast-in-place concrete retaining walls
mechanically stabilized earth (MSE) .............................................................. See MSE retaining walls
prefabricated modular .......................................................... See Prefabricated modular retaining walls
INDEX - 26
Roadway
Rock
base .................................................................................................................................... 691, 693
reinforcing bolts .................................................................................................................. 313, 324
Rollers
asphalt concrete pavement ................................................................................................. 762, 783
pneumatic tired .......................................................................................... See Pneumatic tired rollers
steel wheeled ................................................................................................ See Steel wheeled rollers
S
Salvaging
Sampling and testing
asphalt concrete pavement ................................................................................................. 762, 778
Sawcutting
Scales
Schedule
INDEX - 27
type ............................................................................................................................. 106, 107, 109
Seal cracks
in portland cement concrete pavement ............................................................................... 815, 833
Sealers
Season limitations ..................................................................... See Temperature and weather limitations
Second notification ..................................................................................11, 46, 47, 94, 115, 117, 147
Sediment Fence ..................................................................................................................... 230, 237
Seeding
fertilizer ............................................................................................................................... 958, 963
Selected
Sequential arrow signs ................................................................................................... 172, 175, 176
Sheeting, sign
Sidewalks
INDEX - 28
Sign(s)
covers ................................................................................................................................. 172, 922
fabrication, aluminum ........................................................................................................ 918, 1144
legends ................................................................................................................... 919, 1145, 1146
portable changeable message .................................................................................... 158, 172, 175
temporary............................................................................................................................ 171, 172
wood posts........................................................................................................................ 896, 1070
Signals......................................................................................................................... See Traffic signal
Slag .................................................................................................................. 704, 1043, 1055, 1058
Slipform paving
for portland cement concrete pavement.............................................................. 806, 810, 825, 829
Slope
Slope protection
Smoothness
asphalt concrete pavement ................................................................................................. 767, 791
portland cement concrete pavement ................................................................................... 815, 833
Soil amendments.................................................................................................................... 974, 982
INDEX - 29
Source of materials
Specifications
Steel casings
Steel wheeled rollers
Stone base ............................................................................................................................. 691, 693
Stone embankment ................................................................................................................ 266, 273
Striping ............................................................................................................... See Pavement markings
Structural steel bridges
materials ......................................................................................................................... 1117, 1120
INDEX - 30
Structure concrete ..................................................................................................See Concrete bridges
Structures
concrete overlay ................................................................................................................. 515, 533
Subgrade
Submittals................................................................................................................................... 40, 42
Surface finishes
concrete bridges ................................................................................................................. 491, 494
Surface preparation
Surface tolerances
aggregate base and shoulders ........................................................................................... 691, 696
asphalt concrete pavement ................................................................................................. 767, 791
portland cement concrete pavement ................................................................... 813, 815, 831, 833
Surfacings
INDEX - 31
asphalt concrete pavement ................................................................................................. 757, 769
Suspension of work
T
Temperature and weather limitations
asphalt concrete pavement ................................................................................................. 762, 784
MPCO ................................................................................................................................. 515, 517
plants .................................................................................................................................. 971, 981
portland cement concrete pavement ................................................................................... 808, 827
PPC .................................................................................................................................... 521, 522
seeding ............................................................................................................................... 960, 962
Temporary
curb ramp.................................................................................................................... 159, 211, 212
INDEX - 32
Traffic Control Devices............................................................................ See Work zone traffic control
Testing
Thickness
aggregate courses .............................................................................................................. 691, 695
legends and bars ................................................................................................................ 888, 892
portland cement concrete pavement ................................................................................... 817, 835
Thickness tolerances
subgrade ............................................................................................................................. 277, 300
Third notification ....................................................................................... 12, 36, 46, 47, 92, 115, 138
Timber
guardrail posts .................................................................................................................. 849, 1068
Time
INDEX - 33
Tolerances
bridge expansion joints ....................................................................................................... 587, 588
Tolerances and limits of mixtures
asphalt concrete pavement ................................................................................................. 761, 777
Topsoil
Traffic
Traffic control.............................................................................................. See Work zone traffic control
Traffic Control
Traffic control supervisor
Traffic control, Work Zone .......................................................................... See Work zone traffic control
Traffic signal
INDEX - 34
Traffic control supervisor
Trench
backfill ................................................................................................................................. 330, 332
U
V
Video pipe inspection
W
Walks
Warranties .................................................................................................................................. 93, 94
Warranty
INDEX - 35
pavement legends and bars................................................................................................ 889, 892
Waste management
Water ............................................................................................... See potable water, See potable water
Weather and temperature limitations ......................................... See Temperature and weather limitations
Weed control
Welder qualifications
Welding
Wildlife Wire
Wire
reinforcement .................................................................................................................. 1110, 1111
Wiring
Wood
guardrail posts and blocks .............................................................................................. 1068, 1070
INDEX - 36
sign posts.......................................................................................................................... 896, 1070
structures .......................................................................................................................... 564, 1074
Work
force account, payment....................................................................................................... 140, 141
Work zone fencing .......................................................................................................... 167, 254, 263
Work Zone traffic control
automated flagger device.................................................................................... 178, 181, 183, 184
tape and painted striping..................................................................................................... 189, 190
Workers’ compensation .............................................................................................................. 80, 87
Working drawings
INDEX - 37
Woven wire fence ................................................................................................................. 999, 1157
NOTES
NOTES
NOTES
Get an email when 03020 changes
Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.