03020.00 1160 Section 03020 - Erosion Materials

Description

03020.00Scope - This Section includes the requirements for erosion control Materials

Materials

03020.10Commercially Manufactured Compost - Furnish commercially manufactured compost

that:

• Is processed through thermophilic composting meeting the EPA's definition of "Process to Further Reduce Pathogens". • Is from a commercial compost facility that holds a current DEQ composting permit or is registered with DEQ as a composting facility. • Meets the requirements of the US Composting Council (USCC) and its Seal of Testing Assurance (STA) program. • Contains a minimum 65 percent by volume of the following recycled plant waste: • Source -separated yard and garden wastes • Wood wastes • Agricultural crop residues • Wax-coated cardboard • Preconsumer vegetative food wastes • Other similar source -separated materials that the DEQ has determined to have a comparable low level of risk in hazardous substances, human pathogens, and physical contaminants. • Manure or biosolids based composts when approved. • Meets the following compost particl e size and media parameters:

Compost Particle Size Compost Type Sieve Size Fine* Medium* Coarse** Percent Passing (By Dry Weight) 3" 100 100 100 1" 99-100 95-100 90-100 3/4" 99-100 95-100 70-100 5/8" 95-100 90-100 70-100 1/2" 80-100 70-100 60-100 1/4" 75-100 70-90 30-60 * maximum 3 inch particle length ** maximum 6 inch particle length

03020.90 1161 Media Parameters Test Test Method Requirements Physical Contaminants* TMECC** 03.08 -A Less than 1.0% Organic Matter TMECC** 05.07 -A 35% (Minimum) pH TMECC** 04.11 -A 6.0 to 8.5 Soluble Salt Concentration TMECC** 04.10 -A 5 dS/m (Maximum) Total Carbon Total Nitrogen TMECC** 04.02 -D TMECC** 04.02 -D Carbon/Nitrogen Ratio Fine Medium Coarse <25:1 <30:1 <35:1 Stability TMECC** 05.08 -B ≤8 Maturity TMECC** 05.05 -A 80% or Greater Moisture Content TMECC** 03.09 -A 35-60% (Wet Weight) * Man-made Inert ** Test Methods for Evaluation of Compost and Composting

03020.90Acceptance - Acceptance of commercially manufactured compost Material will be the

following:

• Copies of STA lab analysis. • Copy of DEQ permit or registration of the compost producer.

Blank Page

INDEX - 1 INDEX A Access to the work ............................................................................................................. 38, 69, 116 ADA ......... See Temporary Pedestrian Accessible Route Plan , See curb ramps , See temporary curb ramp, See miscellaneous portland cement concrete structures Additives Adhesive Adjusting Admixtures ........................................................................................................................ See Additives Aggregates asphalt concrete pavement ................................................................................................. 757, 770 base .......................................................................................................................... 691, 693, 1133 emulsified asphalt concrete ................................................................................................ 735, 736 shoulder .................................................................................................................... 691, 693, 1135 Allowances Anchor bolts

INDEX - 2 guardrail ............................................................................................................................ 849, 1141 Application rates emulsified asphalt surface treatment .................................................................................. 729, 730 Approval of Arch corrugated metal pipe ....................................................................................................... 375, 1093 structural plate pipe .......................................................................................................... 389, 1097 Arrow signs sequential ................................................................................................................... 172, 175, 176 Asphalt in asphalt concrete pavement ............................................................................................. 759, 774

Asphalt concrete

Asphalt concrete pavement

aggregate............................................................................................................................ 757, 770

broadband limits ................................................................................................................. 760, 775

cement, additives, treatment ............................................................................................... 759, 774

compaction ......................................................................................................................... 766, 788

hauling, depositing, and placing .......................................................................................... 741, 786

job mix formula ................................................................................................................... 760, 776

pavers ................................................................................................................................. 762, 782

rollers .................................................................................................................................. 762, 782

seasons and temperature limits .......................................................................................... 762, 784

smoothness ........................................................................................................................ 767, 791

INDEX - 3

tolerances and limits ........................................................................................................... 761, 777

Attenuators

Authority

Automated flagger assistance device ..................................................................... 178, 181, 183, 184

B

Backfill

trench .................................................................................................................................. 330, 333

Barbed wire fence ................................................................................................................ 999, 1157

Barrier

Base

aggregate.................................................................................................................. 691, 693, 1133

Bearings

Beginning and end of contract time ........................................................................................ 114, 115

Bid

rejection .................................................................................................................................. 23, 25

Bidder

BidExpress®....................................................................................................... 14, 15, 19, 21, 22, 23

Bills

INDEX - 4

Blasting

Bolts

Bonds

Boulder excavation ................................................................................................................. 335, 336

Bridge decks

Bridge rail ............................................................................................................................. 592, 1140

Bridges

concrete ..............................................................................................................See Concrete bridges

steel ........................................................................................................... See Structural steel bridges

Broadband limits

asphalt concrete pavement ................................................................................................. 760, 775

Brooming

C

Cable and wire

INDEX - 5

Cement

asphalt for asphalt concrete pavement ............................................................................... 759, 774

Certificate

Certified Payroll .................................................................................................................... 72, 81, 83

Chain link fence .................................................................................................................. 1000, 1157

Channelizing devices

bicycle ................................................................................................................................. 160, 211

Clear zone

Coating steel structures

Coatings

Cold plane pavement removal

INDEX - 6

Compaction

aggregate base ................................................................................................................... 691, 696

asphalt concrete pavement ................................................................................................. 766, 788

Compactors .......................................................................................................................... See Rollers

Concrete

Concrete barrier

Concrete bridges

falsework............................................................................................................................. 480, 482

mix tolerances and limits................................................................................................... 476, 1047

surface finish....................................................................................................................... 491, 494

Concrete overlays, structures ................................................................................................. 515, 533

Concrete pavement

acceptance of concrete ....................................................................................................... 805, 824

classes of concrete ............................................................................................................. 804, 823

curing .................................................................................................................................. 814, 832

INDEX - 7

handling, measuring, and batching material ....................................................................... 810, 828

joints ................................................................................................................................... 812, 830

materials ............................................................................................................................. 804, 823

mix designs ......................................................................................................................... 805, 823

mixing concrete ................................................................................................................... 810, 828

placing concrete .................................................................................................................. 810, 828

preparation of base ............................................................................................................. 808, 827

quality control...................................................................................................................... 805, 824

surface finishing .................................................................................................................. 813, 831

surface tolerances, testing and correction .......................................................................... 815, 833

thickness ............................................................................................................................. 817, 835

weather limitations .............................................................................................................. 808, 827

Concrete structures ................................................................................................See Concrete bridges

Concrete structures, miscellaneous

Concrete, portland cement

pipe ................................................................................................................................... 375, 1088

Conduit

Continuously reinforced concrete pavement ....................................................... See Concrete pavement

Contract

INDEX - 8

Contract payment

Contraction joints............................................................................................................ 812, 830, 843

Contractor

Contractor furnished ......................................................................................................... 93, 713, 726

Contractor(s)

Costs

Culvert

INDEX - 9

Curb cuts ........................................................................................................................ See curb ramps

temporary.................................................................................................................... 159, 211, 212

Curbs

commercial grade concrete................................................................................................. 400, 840

Curing

portland cement concrete pavement ................................................................................... 814, 832

Cutoff

D

Damages

Delay(s)

Density requirements .................................................................................................... See Compaction

Disposal

INDEX - 10

Doc Express® .................................................................................................................... 40, 75, 157

Drains

Drilled shafts

joints ........................................................................................................................... 438, 482, 907

Dust control

E

Earthwork ............................................................................................. See Embankment and Excavation

blasting ............................................................................................................................... 270, 284

Embankment

Emulsified asphalt chip seal

Emulsified asphalt chip seal

Emulsified asphalt concrete pavement

INDEX - 11

Emulsified asphalt surface treatment

quality control...................................................................................................................... 727, 728

Environmental protection

Epoxy

Equipment

Erosion and sediment control

manager.............................................................................................................................. 226, 232

Errors

Establishment

INDEX - 12

Estimates

Excavation

Expansion joints

portland cement concrete pavement ................................................................................... 812, 830

Extra work .............................................................................................................................. 140, 141

F

Failure to

barbed and woven wire ..................................................................................................... 999, 1157

bridge protective ............................................................................................................. 1001, 1158

chain link ......................................................................................................................... 1000, 1157

gates and gateways ........................................................................................................ 1001, 1158

grounding ........................................................................................................................ 1001, 1158

Fencing

Fertilizer

plants .................................................................................................................................. 976, 983

seeding ............................................................................................................................... 958, 963

Final

INDEX - 13

Finishing

concrete pavement ............................................................................................................. 813, 831

First notification ............................................................................................................................ 8, 31

Flaggers

Foot board measure (FBM) .................................................................................................... 123, 896

Footings

sign supports ...................................................................................................................... 897, 899

Force account......................................................................................................................... 140, 141

Frames, grates, covers and fittings ...................................................................................... 396, 1100

G

Galvanizing

General excavation

boulder ................................................................................................................................ 268, 271

General provisions

Geosynthetics....................................................................................................................... 293, 1079

INDEX - 14

Girders

Grades

Grates, frames, covers, and fittings ...................................................................................... 396, 1100

Grinding

asphalt concrete pavement ................................................................................................. 767, 792

Grooving pavement ................................................................................................................ 813, 831

Grounding

Grout

Grubbing................................................................................................................................. 262, 263

Guardrail

metal ................................................................................................................................. 849, 1141

H

Handrail

Hauling, depositing, and placing

asphalt concrete pavement ................................................................................................. 764, 786

Hazardous

INDEX - 15

Highway

Highway illumination ...................................................................................................... See Illumination

Hydrants ............................................................................................................................. 1036, 1107

I

Illumination

luminaires ......................................................................................................................... 946, 1151

Impact attenuators

Inspection

Insurance

INDEX - 16

Irrigation

J

Job mix formula

asphalt concrete pavement ................................................................................................. 760, 776

Joint filler

Joints

asphalt concrete pavement ......................................................................................... 764, 787, 788

emulsified asphalt concrete pavement ................................................................................ 743, 744

portland cement concrete pavement ................................................................................... 812, 830

K

L

Labor

Landscape

INDEX - 17

Laws

Legends.................................................................................................................................. 888, 892

Lighting

Lining, pipe ............................................................................................................................. 342, 345

Longitudinal joints, portland cement concrete pavement........................................................ 812, 831

Lumber and timber, structural............................................................................................... 564, 1073

Luminaire....................................................................................................................... See Illumination

M

Manholes and inlets

adjusting ............................................................................................................................. 404, 406

materials ........................................................................................................................... 394, 1100

Manufacturer's representative

INDEX - 18

Markers

Materials

Materials on hand ............................................................................132, 135, 136, 697, 714, 727, 994

Mechanically stabilized earth retaining walls ..................................................... See MSE retaining walls

Metal structures, miscellaneous

guardrail posts .................................................................................................................. 849, 1141

Metal, incidental structures

Methods of curing ................................................................................................................. See Curing

Mix designs

asphalt concrete pavement ................................................................................................. 760, 776

portland cement concrete pavement ......................................................................... 805, 823, 1043

structural concrete ............................................................................................................ 476, 1043

Mixing

portland cement concrete pavement ................................................................................... 810, 828

Mixing temperatures

INDEX - 19

Moisture, excess in embankment construction ....................................................................... 270, 271

Mulch

plants .................................................................................................................................. 979, 987

seeding ............................................................................................................................... 959, 963

N

Notification........................................... See First notification, See second notification, See third notification

O

Open graded

Orange mesh fencing ........................................................................................... See work zone fencing

Orange mesh fencing for delineation .................................................................... See work zone fencing

INDEX - 20

P

Painting steel bridges ................................................................................... See Coating steel structures

Pavement

asphalt concrete ................................................................................................................. 757, 769

groove in portland cement concrete .................................................................................... 813, 831

joints for portland cement concrete ..................................................................................... 812, 830

Pavement markings

Pavement repairs

Pavers

asphalt concrete pavement ................................................................................................. 762, 782

portland cement concrete pavement ................................................................................... 806, 825

Payment

material on hand ................................................................................................................. 135, 137

INDEX - 21

Piles

materials ................................................................................................................. 443, 1072, 1115

steel .................................................................................................................................. 451, 1115

Pilot cars

Pipe

air test ....................................................................................................................... 344, 382, 1088

boulder excavation .............................................................................................................. 268, 271

irrigation ............................................................................................................................ 375, 1012

structural plate .................................................................................................................. 389, 1097

water test .............................................................................................381, 1026, 1034, 1037, 1040

Pipe lining

INDEX - 22

Pipes

Plans

Plant mixed aggregate base and shoulders ........................................................................... 694, 695

Planting

inspection............................................................................................................................ 977, 990

mulch .................................................................................................................................. 979, 987

watering .............................................................................................................................. 980, 988

weather limitations .............................................................................................................. 971, 981

Pneumatic tired rollers

Pollution control

Portable changeable message sign ............................................................................... 158, 172, 175

Portland cement concrete.................................................................................................. See Concrete

Posts

fence ............................................................................................................................... 1070, 1157

guardrail .......................................................................................................................... 1068, 1141

sign ........................................................................................................................... 896, 911, 1070

INDEX - 23

Potable water

disinfecting ...................................................................................................................... 1026, 1029

pipes and fittings ............................................................................................................. 1022, 1102

service connections ........................................................................................................ 1026, 1039

testing pipes and fittings ................................................................................................. 1026, 1040

Power and telephone lines, etc .................................................................................................. 43, 95

Power service

Pre-coated aggregate asphalt chip seal

Pre-coated aggregate asphalt surface treatment

quality control...................................................................................................................... 720, 722

Price adjustments ........................................................................................................... 128, 131, 140

Process control......................................................................................................... See Quality control

Protection

cultural resources and sites ................................................................................................ 254, 255

INDEX - 24

work during suspension ...................................................................................................... 116, 162

Q

Qualification of welders

Quality control

asphalt concrete pavement ......................................................................................... 774, 778, 784

emulsified asphalt chip seal ................................................................................................ 714, 715

emulsified asphalt concrete pavement ................................................................................ 737, 740

emulsified asphalt slurry seal .............................................................................................. 707, 708

emulsified asphalt surface treatment .................................................................................. 727, 728

portland cement concrete pavement ................................................................... 805, 807, 824, 826

pre-coated aggregate asphalt surface treatment ................................................................ 720, 722

Quantities of materials

R

Railing

bridge ................................................................................................................................ 592, 1140

Reclaimed asphalt pavement ................................................................................................. 758, 773

INDEX - 25

Reinforced concrete

Reinforcement for concrete .................................................................................................. 456, 1110

Removal

Repair

Restrictions

Retaining walls

cast-in-place concrete .......................................................... See Cast-in-place concrete retaining walls

mechanically stabilized earth (MSE) .............................................................. See MSE retaining walls

prefabricated modular .......................................................... See Prefabricated modular retaining walls

INDEX - 26

Roadway

Rock

base .................................................................................................................................... 691, 693

reinforcing bolts .................................................................................................................. 313, 324

Rollers

asphalt concrete pavement ................................................................................................. 762, 783

pneumatic tired .......................................................................................... See Pneumatic tired rollers

steel wheeled ................................................................................................ See Steel wheeled rollers

S

Salvaging

Sampling and testing

asphalt concrete pavement ................................................................................................. 762, 778

Sawcutting

Scales

Schedule

INDEX - 27

type ............................................................................................................................. 106, 107, 109

Seal cracks

in portland cement concrete pavement ............................................................................... 815, 833

Sealers

Season limitations ..................................................................... See Temperature and weather limitations

Second notification ..................................................................................11, 46, 47, 94, 115, 117, 147

Sediment Fence ..................................................................................................................... 230, 237

Seeding

fertilizer ............................................................................................................................... 958, 963

Selected

Sequential arrow signs ................................................................................................... 172, 175, 176

Sheeting, sign

Sidewalks

INDEX - 28

Sign(s)

covers ................................................................................................................................. 172, 922

fabrication, aluminum ........................................................................................................ 918, 1144

legends ................................................................................................................... 919, 1145, 1146

portable changeable message .................................................................................... 158, 172, 175

temporary............................................................................................................................ 171, 172

wood posts........................................................................................................................ 896, 1070

Signals......................................................................................................................... See Traffic signal

Slag .................................................................................................................. 704, 1043, 1055, 1058

Slipform paving

for portland cement concrete pavement.............................................................. 806, 810, 825, 829

Slope

Slope protection

Smoothness

asphalt concrete pavement ................................................................................................. 767, 791

portland cement concrete pavement ................................................................................... 815, 833

Soil amendments.................................................................................................................... 974, 982

INDEX - 29

Source of materials

Specifications

Steel casings

Steel wheeled rollers

Stone base ............................................................................................................................. 691, 693

Stone embankment ................................................................................................................ 266, 273

Striping ............................................................................................................... See Pavement markings

Structural steel bridges

materials ......................................................................................................................... 1117, 1120

INDEX - 30

Structure concrete ..................................................................................................See Concrete bridges

Structures

concrete overlay ................................................................................................................. 515, 533

Subgrade

Submittals................................................................................................................................... 40, 42

Surface finishes

concrete bridges ................................................................................................................. 491, 494

Surface preparation

Surface tolerances

aggregate base and shoulders ........................................................................................... 691, 696

asphalt concrete pavement ................................................................................................. 767, 791

portland cement concrete pavement ................................................................... 813, 815, 831, 833

Surfacings

INDEX - 31

asphalt concrete pavement ................................................................................................. 757, 769

Suspension of work

T

Temperature and weather limitations

asphalt concrete pavement ................................................................................................. 762, 784

MPCO ................................................................................................................................. 515, 517

plants .................................................................................................................................. 971, 981

portland cement concrete pavement ................................................................................... 808, 827

PPC .................................................................................................................................... 521, 522

seeding ............................................................................................................................... 960, 962

Temporary

curb ramp.................................................................................................................... 159, 211, 212

INDEX - 32

Traffic Control Devices............................................................................ See Work zone traffic control

Testing

Thickness

aggregate courses .............................................................................................................. 691, 695

legends and bars ................................................................................................................ 888, 892

portland cement concrete pavement ................................................................................... 817, 835

Thickness tolerances

subgrade ............................................................................................................................. 277, 300

Third notification ....................................................................................... 12, 36, 46, 47, 92, 115, 138

Timber

guardrail posts .................................................................................................................. 849, 1068

Time

INDEX - 33

Tolerances

bridge expansion joints ....................................................................................................... 587, 588

Tolerances and limits of mixtures

asphalt concrete pavement ................................................................................................. 761, 777

Topsoil

Traffic

Traffic control.............................................................................................. See Work zone traffic control

Traffic Control

Traffic control supervisor

Traffic control, Work Zone .......................................................................... See Work zone traffic control

Traffic signal

INDEX - 34

Traffic control supervisor

Trench

backfill ................................................................................................................................. 330, 332

U

V

Video pipe inspection

W

Walks

Warranties .................................................................................................................................. 93, 94

Warranty

INDEX - 35

pavement legends and bars................................................................................................ 889, 892

Waste management

Water ............................................................................................... See potable water, See potable water

Weather and temperature limitations ......................................... See Temperature and weather limitations

Weed control

Welder qualifications

Welding

Wildlife Wire

Wire

reinforcement .................................................................................................................. 1110, 1111

Wiring

Wood

guardrail posts and blocks .............................................................................................. 1068, 1070

INDEX - 36

sign posts.......................................................................................................................... 896, 1070

structures .......................................................................................................................... 564, 1074

Work

force account, payment....................................................................................................... 140, 141

Work zone fencing .......................................................................................................... 167, 254, 263

Work Zone traffic control

automated flagger device.................................................................................... 178, 181, 183, 184

tape and painted striping..................................................................................................... 189, 190

Workers’ compensation .............................................................................................................. 80, 87

Working drawings

INDEX - 37

Woven wire fence ................................................................................................................. 999, 1157

NOTES

NOTES

NOTES

Get an email when 03020 changes

Oregon revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Oregon Standard Specifications for Construction, 2024 Edition. Pages 1226–1268 of 1,268. View official source ↗

Ask about this section

Scoped to Oregon 2024 Standard Specifications for Construction, Section 03020 — Erosion Materials. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.