03020.00 1160 Section 03020 - Erosion Materials
Description
03020.00Scope - This Section includes the requirements for erosion control Materials
Materials
03020.10Commercially Manufactured Compost - Furnish commercially manufactured compost
that:
• Is processed through thermophilic composting meeting the EPA's definition of "Process to Further Reduce Pathogens". • Is from a commercial compost facility that holds a current DEQ composting permit or is registered with DEQ as a composting facility. • Meets the requirements of the US Composting Council (USCC) and its Seal of Testing Assurance (STA) program. • Contains a minimum 65 percent by volume of the following recycled plant waste: • Source -separated yard and garden wastes • Wood wastes • Agricultural crop residues • Wax-coated cardboard • Preconsumer vegetative food wastes • Other similar source -separated materials that the DEQ has determined to have a comparable low level of risk in hazardous substances, human pathogens, and physical contaminants. • Manure or biosolids based composts when approved. • Meets the following compost particl e size and media parameters:
Compost Particle Size Compost Type Sieve Size Fine* Medium* Coarse** Percent Passing (By Dry Weight) 3" 100 100 100 1" 99-100 95-100 90-100 3/4" 99-100 95-100 70-100 5/8" 95-100 90-100 70-100 1/2" 80-100 70-100 60-100 1/4" 75-100 70-90 30-60 * maximum 3 inch particle length ** maximum 6 inch particle length
03020.90 1161 Media Parameters Test Test Method Requirements Physical Contaminants* TMECC** 03.08 -A Less than 1.0% Organic Matter TMECC** 05.07 -A 35% (Minimum) pH TMECC** 04.11 -A 6.0 to 8.5 Soluble Salt Concentration TMECC** 04.10 -A 5 dS/m (Maximum) Total Carbon Total Nitrogen TMECC** 04.02 -D TMECC** 04.02 -D Carbon/Nitrogen Ratio Fine Medium Coarse <25:1 <30:1 <35:1 Stability TMECC** 05.08 -B ≤8 Maturity TMECC** 05.05 -A 80% or Greater Moisture Content TMECC** 03.09 -A 35-60% (Wet Weight) * Man-made Inert ** Test Methods for Evaluation of Compost and Composting
03020.90Acceptance - Acceptance of commercially manufactured compost Material will be the
following:
• Copies of STA lab analysis. • Copy of DEQ permit or registration of the compost producer.
Blank Page
INDEX - 1 INDEX A Access to the work ............................................................................................................. 38, 69, 116 ADA ......... See Temporary Pedestrian Accessible Route Plan , See curb ramps , See temporary curb ramp, See miscellaneous portland cement concrete structures Additives Adhesive Adjusting Admixtures ........................................................................................................................ See Additives Aggregates asphalt concrete pavement ................................................................................................. 757, 770 base .......................................................................................................................... 691, 693, 1133 emulsified asphalt concrete ................................................................................................ 735, 736 shoulder .................................................................................................................... 691, 693, 1135 Allowances Anchor bolts
INDEX - 2 guardrail ............................................................................................................................ 849, 1141 Application rates emulsified asphalt surface treatment .................................................................................. 729, 730 Approval of Arch corrugated metal pipe ....................................................................................................... 375, 1093 structural plate pipe .......................................................................................................... 389, 1097 Arrow signs sequential ................................................................................................................... 172, 175, 176 Asphalt in asphalt concrete pavement ............................................................................................. 759, 774 Asphalt concrete Asphalt concrete pavement aggregate ............................................................................................................................ 757, 770 broadband limits ................................................................................................................. 760, 775 cement, additives, treatment ............................................................................................... 759, 774 compaction ......................................................................................................................... 766, 788 hauling, depositing, and placing .......................................................................................... 741, 786 job mix formula ................................................................................................................... 760, 776 pavers ................................................................................................................................. 762, 782 rollers .................................................................................................................................. 762, 782 seasons and temperature limits .......................................................................................... 762, 784 smoothness ........................................................................................................................ 767, 791
INDEX - 3 tolerances and limits ........................................................................................................... 761, 777 Attenuators Authority Automated flagger assistance device ..................................................................... 178, 181, 183, 184 B Backfill trench .................................................................................................................................. 330, 333 Barbed wire fence ................................................................................................................ 999, 1157 Barrier Base aggregate .................................................................................................................. 691, 693, 1133 Bearings Beginning and end of contract time ........................................................................................ 114, 115 Bid rejection .................................................................................................................................. 23, 25 Bidder BidExpress® ....................................................................................................... 14, 15, 19, 21, 22, 23 Bills
INDEX - 4 Blasting Bolts Bonds Boulder excavation ................................................................................................................. 335, 336 Bridge decks Bridge rail ............................................................................................................................. 592, 1140 Bridges concrete .............................................................................................................. See Concrete bridges steel ........................................................................................................... See Structural steel bridges Broadband limits asphalt concrete pavement ................................................................................................. 760, 775 Brooming C Cable and wire
Cement asphalt for asphalt concrete pavement ............................................................................... 759, 774 Certificate Certified Payroll .................................................................................................................... 72, 81, 83 Chain link fence .................................................................................................................. 1000, 1157 Channelizing devices bicycle ................................................................................................................................. 160, 211 Clear zone Coating steel structures Coatings Cold plane pavement removal
INDEX - 6 Compaction aggregate base ................................................................................................................... 691, 696 asphalt concrete pavement ................................................................................................. 766, 788 Compactors .......................................................................................................................... See Rollers Concrete Concrete barrier Concrete bridges falsework ............................................................................................................................. 480, 482 mix tolerances and limits ................................................................................................... 476, 1047 surface finish ....................................................................................................................... 491, 494 Concrete overlays, structures ................................................................................................. 515, 533 Concrete pavement acceptance of concrete ....................................................................................................... 805, 824 classes of concrete ............................................................................................................. 804, 823 curing .................................................................................................................................. 814, 832
handling, measuring, and batching material ....................................................................... 810, 828 joints ................................................................................................................................... 812, 830 materials ............................................................................................................................. 804, 823 mix designs ......................................................................................................................... 805, 823 mixing concrete ................................................................................................................... 810, 828 placing concrete .................................................................................................................. 810, 828 preparation of base ............................................................................................................. 808, 827 quality control ...................................................................................................................... 805, 824 surface finishing .................................................................................................................. 813, 831 surface tolerances, testing and correction .......................................................................... 815, 833 thickness ............................................................................................................................. 817, 835 weather limitations .............................................................................................................. 808, 827 Concrete structures ................................................................................................ See Concrete bridges Concrete structures, miscellaneous Concrete, portland cement pipe ................................................................................................................................... 375, 1088 Conduit Continuously reinforced concrete pavement ....................................................... See Concrete pavement Contract
INDEX - 8 Contract payment Contraction joints ............................................................................................................ 812, 830, 843 Contractor Contractor furnished ......................................................................................................... 93, 713, 726 Contractor(s) Costs Culvert
Curb cuts ........................................................................................................................ See curb ramps temporary .................................................................................................................... 159, 211, 212 Curbs commercial grade concrete ................................................................................................. 400, 840 Curing portland cement concrete pavement ................................................................................... 814, 832 Cutoff D Damages Delay(s) Density requirements .................................................................................................... See Compaction Disposal
INDEX - 10 Doc Express® .................................................................................................................... 40, 75, 157 Drains Drilled shafts joints ........................................................................................................................... 438, 482, 907 Dust control E Earthwork ............................................................................................. See Embankment and Excavation blasting ............................................................................................................................... 270, 284 Embankment Emulsified asphalt chip seal Emulsified asphalt chip seal Emulsified asphalt concrete pavement
Emulsified asphalt surface treatment quality control ...................................................................................................................... 727, 728 Environmental protection Epoxy Equipment Erosion and sediment control manager .............................................................................................................................. 226, 232 Errors Establishment
INDEX - 12 Estimates Excavation Expansion joints portland cement concrete pavement ................................................................................... 812, 830 Extra work .............................................................................................................................. 140, 141 F Failure to barbed and woven wire ..................................................................................................... 999, 1157 bridge protective ............................................................................................................. 1001, 1158 chain link ......................................................................................................................... 1000, 1157 gates and gateways ........................................................................................................ 1001, 1158 grounding ........................................................................................................................ 1001, 1158 Fencing Fertilizer plants .................................................................................................................................. 976, 983 seeding ............................................................................................................................... 958, 963 Final
Finishing concrete pavement ............................................................................................................. 813, 831 First notification ............................................................................................................................ 8, 31 Flaggers Foot board measure (FBM) .................................................................................................... 123, 896 Footings sign supports ...................................................................................................................... 897, 899 Force account ......................................................................................................................... 140, 141 Frames, grates, covers and fittings ...................................................................................... 396, 1100 G Galvanizing General excavation boulder ................................................................................................................................ 268, 271 General provisions Geosynthetics ....................................................................................................................... 293, 1079
INDEX - 14 Girders Grades Grates, frames, covers, and fittings ...................................................................................... 396, 1100 Grinding asphalt concrete pavement ................................................................................................. 767, 792 Grooving pavement ................................................................................................................ 813, 831 Grounding Grout Grubbing ................................................................................................................................. 262, 263 Guardrail metal ................................................................................................................................. 849, 1141 H Handrail Hauling, depositing, and placing asphalt concrete pavement ................................................................................................. 764, 786 Hazardous
Highway Highway illumination ...................................................................................................... See Illumination Hydrants ............................................................................................................................. 1036, 1107 I Illumination luminaires ......................................................................................................................... 946, 1151 Impact attenuators Inspection Insurance
INDEX - 16 Irrigation J Job mix formula asphalt concrete pavement ................................................................................................. 760, 776 Joint filler Joints asphalt concrete pavement ......................................................................................... 764, 787, 788 emulsified asphalt concret e pavement ................................................................................ 743, 744 portland cement concrete pavement ................................................................................... 812, 830 K L Labor Landscape
Laws Legends .................................................................................................................................. 888, 892 Lighting Lining, pipe ............................................................................................................................. 342, 345 Longitudinal joints, portland cement concrete pavement ........................................................ 812, 831 Lumber and timber, structural ............................................................................................... 564, 1073 Luminaire ....................................................................................................................... See Illumination M Manholes and inlets adjusting ............................................................................................................................. 404, 406 materials ........................................................................................................................... 394, 1100 Manufacturer's representative
INDEX - 18 Markers Materials Materials on hand ............................................................................ 132, 135, 136, 697, 714, 727, 994 Mechanically stabilized earth retaining walls ..................................................... See MSE retaining walls Metal structures, miscellaneous guardrail posts .................................................................................................................. 849, 1141 Metal, incidental struc tures Methods of curing ................................................................................................................. See Curing Mix designs asphalt concrete pavement ................................................................................................. 760, 776 portland cement concrete pavement ......................................................................... 805, 823, 1043 structural concrete ............................................................................................................ 476, 1043 Mixing portland cement concrete pavement ................................................................................... 810, 828 Mixing temperatures
INDEX - 19 Moisture, excess in embankment construction ....................................................................... 270, 271 Mulch plants .................................................................................................................................. 979, 987 seeding ............................................................................................................................... 959, 963 N Notification ........................................... See First notification , See second notification , See third notification O Open graded Orange mesh fencing ........................................................................................... See work zone fencing Orange mesh fencing for delineation .................................................................... See work zone fencing
INDEX - 20 P Painting steel bridges ................................................................................... See Coating steel structures Pavement asphalt concrete ................................................................................................................. 757, 769 groove in portland cement concrete .................................................................................... 813, 831 joints for portland cement concrete ..................................................................................... 812, 830 Pavement markings Pavement repairs Pavers asphalt concrete pavement ................................................................................................. 762, 782 portland cement concrete pavement ................................................................................... 806, 825 Payment material on hand ................................................................................................................. 135, 137
Piles materials ................................................................................................................. 443, 1072, 1115 steel .................................................................................................................................. 451, 1115 Pilot cars Pipe air test ....................................................................................................................... 344, 382, 1088 boulder excavation .............................................................................................................. 268, 271 irrigation ............................................................................................................................ 375, 1012 structural plate .................................................................................................................. 389, 1097 water test .............................................................................................381, 1026, 1034, 1037, 1040 Pipe lining
INDEX - 22 Pipes Plans Plant mixed aggregate base and shoulders ........................................................................... 694, 695 Planting inspection ............................................................................................................................ 977, 990 mulch .................................................................................................................................. 979, 987 watering .............................................................................................................................. 980, 988 weather limitations .............................................................................................................. 971, 981 Pneumatic tired rollers Pollution control Portable changeable message sign ............................................................................... 158, 172, 175 Portland cement concrete .................................................................................................. See Concrete Posts fence ............................................................................................................................... 1070, 1157 guardrail .......................................................................................................................... 1068, 1141 sign ........................................................................................................................... 896, 911, 1070
INDEX - 23 Potable water disinfecting ...................................................................................................................... 1026, 1029 pipes and fittings ............................................................................................................. 1022, 1102 service connections ........................................................................................................ 1026, 1039 testing pipes and fittings ................................................................................................. 1026, 1040 Power and telephone lines, etc .................................................................................................. 43, 95 Power service Pre-coated aggregate asphalt chip seal Pre-coated aggregate asphalt surface treatment quality control ...................................................................................................................... 720, 722 Price adjustments ........................................................................................................... 128, 131, 140 Process control ......................................................................................................... See Quality control Protection cultural resources and sites ................................................................................................ 254, 255
INDEX - 24 work during suspension ...................................................................................................... 116, 162 Q Qualification of welders Quality control asphalt concrete pavement ......................................................................................... 774, 778, 784 emulsified asphalt chip seal ................................................................................................ 714, 715 emulsified asphalt concrete pavement ................................................................................ 737, 740 emulsified asphalt slurry seal .............................................................................................. 707, 708 emulsified asphalt surface treatment .................................................................................. 727, 728 portland cement concrete pavement ................................................................... 805, 807, 824, 826 pre-coated aggregate asphalt surface treatment ................................................................ 720, 722 Quantities of materials R Railing bridge ................................................................................................................................ 592, 1140 Reclaimed asphalt pavement ................................................................................................. 758, 773
Reinforced concrete Reinforcement for concrete .................................................................................................. 456, 1110 Removal Repair Restrictions Retaining walls cast-in-place concrete .......................................................... See Cast -in-place concrete retaining walls mechanically stabilized earth (MSE) .............................................................. See MSE retaining walls prefabricated modular .......................................................... See Prefabricated modular retaining walls
INDEX - 26 Roadway Rock base .................................................................................................................................... 691, 693 reinforcing bolts .................................................................................................................. 313, 324 Rollers asphalt concrete pavement ................................................................................................. 762, 783 pneumatic tired .......................................................................................... See Pneumatic tired rollers steel wheeled ................................................................................................ See Steel wheeled rollers S Salvaging Sampling and testing asphalt concrete pavement ................................................................................................. 762, 778 Sawcutting Scales Schedule
type ............................................................................................................................. 106, 107, 109 Seal cracks in portland cement concrete pavement ............................................................................... 815, 833 Sealers Season limitations ..................................................................... See Temperature and weather limitations Second notification ..................................................................................11, 46, 47, 94, 115, 117, 147 Sediment Fence ..................................................................................................................... 230, 237 Seeding fertilizer ............................................................................................................................... 958, 963 Selected Sequential arrow signs ................................................................................................... 172, 175, 176 Sheeting, sign Sidewalks
INDEX - 28 Sign(s) covers ................................................................................................................................. 172, 922 fabrication, alumi num ........................................................................................................ 918, 1144 legends ................................................................................................................... 919, 1145, 1146 portable changeable message .................................................................................... 158, 172, 175 temporary ............................................................................................................................ 171, 172 wood posts ........................................................................................................................ 896, 1070 Signals ......................................................................................................................... See Traffic signal Slag .................................................................................................................. 704, 1043, 1055, 1058 Slipform paving for portland cement concrete pavement .............................................................. 806, 810, 825, 829 Slope Slope protection Smoothness asphalt concrete pavement ................................................................................................ . 767, 791 portland cement concrete pavement ................................................................................... 815, 833 Soil amendments .................................................................................................................... 974, 982
Source of materials Specifications Steel casings Steel wheeled rollers Stone base ............................................................................................................................. 691, 693 Stone embankment ................................................................................................................ 266, 273 Striping ............................................................................................................... See Pavement markings Structural steel bridges materials ......................................................................................................................... 1117, 1120
INDEX - 30 Structure concrete .................................................................................................. See Concrete bridges Structures concrete overlay ................................................................................................................. 515, 533 Subgrade Submittals ................................................................................................................................... 40, 42 Surface finishes concrete bridges ................................................................................................................. 491, 494 Surface preparation Surface tolerances aggregate base and shoulders ........................................................................................... 691, 696 asphalt concrete pavement ................................................................................................. 767, 791 portland cement concrete pavement ................................................................... 813, 815, 831, 833 Surfacings
INDEX - 31 asphalt concrete pavement ................................................................................................. 757, 769 Suspension of work T Temperature and weather limitations asphalt concrete pavement ................................................................................................. 762, 784 MPCO ................................................................................................................................. 515, 517 plants .................................................................................................................................. 971, 981 portland cement concrete pavement ................................................................................... 808, 827 PPC .................................................................................................................................... 521, 522 seeding ............................................................................................................................... 960, 962 Temporary curb ramp .................................................................................................................... 159, 211, 212
INDEX - 32 Traffic Control Devices ............................................................................ See Work zone traffic control Testing Thickness aggregate courses .............................................................................................................. 691, 695 legends and bars ................................................................................................................ 888, 892 portland cement concrete pavement ................................................................................... 817, 835 Thickness tolerances subgrade ............................................................................................................................. 277, 300 Third notification ....................................................................................... 12, 36, 46, 47, 92, 115, 138 Timber guardrail posts .................................................................................................................. 849, 1068 Time
Tolerances bridge expansion joints ....................................................................................................... 587, 588 Tolerances and limits of mixtures asphalt concrete pavement ................................................................................................. 761, 777 Topsoil Traffic Traffic control .............................................................................................. See Work zone traffic control Traffic Control Traffic control supervisor Traffic control, Work Zone ................................................................ .......... See Work zone traffic control Traffic signal
INDEX - 34 Traffic control supervisor Trench backfill ................................................................................................................................. 330, 332 U V Video pipe inspection W Walks Warranties .................................................................................................................................. 93, 94 Warranty
pavement legends and bars ................................................................................................ 889, 892 Waste management Water ............................................................................................... See potable water , See potable water Weather and temperature limitations ......................................... See Temperature a nd weather limitations Weed control Welder qualifications Welding Wildlife Wire Wire reinforcement .................................................................................................................. 1110, 1111 Wiring Wood guardrail posts and blocks .............................................................................................. 1068, 1070
INDEX - 36 sign posts .......................................................................................................................... 896, 1070 structures .......................................................................................................................... 564, 1074 Work force account, payment ....................................................................................................... 140, 141 Work zone fencing .......................................................................................................... 167, 254, 263 Work Zone traffic control automated flagger device .................................................................................... 178, 181, 183, 184 tape and painted striping ..................................................................................................... 189, 190 Workers’ compensation .............................................................................................................. 80, 87 Working drawings
Woven wire fence ................................................................................................................. 999, 1157
NOTES
NOTES
NOTES