SECTION 207 — CHECK DAMS 200-59 — CHECK DAMS
207.01 Description.
This work includes providing the required check dams and dikes . Install a ll erosion, sediment, and pollution prevention controls and devices before initiating excavation when required by the SWPPP/SESC. Check dams include the following types. SECTION 907 addresses dust control to reduce dust nuisance and hazards. Sand Bag Erosion Dikes. This work includes the placement of sandbags across either riprap or earth ditches, forming a dike to create temporary sediment basins for pollution control. Stone Check Dams. This work includes the placement of stone in ditches or drainage swales. Compost Filter Sock Check Dams. This work includes a flexible mesh tube filled with composted material and staked to the ground with wooden stakes.
207.02 Materials.
Sand Bag Erosion Dikes. Use material for dumped stone that complies with Subsection M10.03.2 for Modified NSA Class R-4 riprap. Use filled sand bags that weigh a minimum of 60 lb. Stone Check Dams. Use filter stone that complies with Subsection M01.09, Table I, Column V. Compost Filter Sock Check Dams. Provide compost filter sock material according to AASHTO Designation R 51- 13. In addition, ensure that the compost material meets all applicable Federal and State regulations. For compost filter socks 18 in. or less in diameter, provide wooden stakes that are 1 in. × 1 in. and with a length that projects into the soil 1 ft, leaving 3 in. to 4 in. protruding above the filter sock. For compost filter socks greater than 18 in. in diameter, provide wooden stakes that are 2-in. × 2-in. and with a length that projects into the soil 1 ft, leaving 3 in. to 4 in. protruding above the filter sock. Place stakes at the ends and at 5-ft intervals, center on center.
207.03 Construction Methods.
Provide the required erosion and pollution controls before initiating any drainage, roadway , or bridge construction or for the disturbance of any soils.
Part 200 — Earthwork and Erosion Control August 2025
200-60 SECTION 207 — CHECK DAMS Sand Bag Erosion Dikes.
Part 200 — Earthwork and Erosion Control August 2025
SECTION 207 — CHECK DAMS 200-61 remove compost filter sock check dams until the adjacent exposed areas are relatively free from future uncontrolled discharges. Unless biodegradable, cut open the mesh filter sock material and remove the mesh. In general, the compost filter material may remain in place. Rake the material level to the surrounding grades, and then seed.
207.04 Method of Measurement.
Sand Bag Erosion Checks. Sand Bag Erosion Checks will be measured by the number of sand bags installed. Stone Check Dams. Stone Check Dams will be measured by the cubic feet of stone placed. Compost Filter Sock Check Dams. Compost Filter Sock Check Dams will be measured by the linear feet of continuous runs of the compost filter sock installed.
207.05 Basis of Payment.
The Department will pay for the completed and accepted quantities at the Contract unit prices as follows. Pay Item Pay Unit Sand Bag Erosion Checks PBag Stone Check Dams CF Compost Filter Sock Check Dams LF Sand Bag Erosion Checks. The price constitutes full compensation for all labor, equipment , and materials, including bags, sand, the subsequent removal of sand bags, removal and disposal of entrapped material, and all other incidentals required to finish the work, complete and accepted. Stone Check Dams. The price constitutes full compensation for all labor, materials, and equipment, including the subsequent removal of the stone, removal and disposal of entrapped material, and all incidentals required to finish the work, complete and accepted. Compost Filter Sock Check Dams. The price constitutes full compensation for all labor, materials, and equipment, including mesh filter socks, removal of mesh filter socks, compost filter material, stakes, removal of stakes,
Part 200 — Earthwork and Erosion Control August 2025
200-62 SECTION 207 — CHECK DAMS removal and disposal of entrapped material, backfill material, grading, raking and seeding as necessary to match the surrounding area, and all incidentals required to finish the work, complete and accepted. Cleaning and Maintenance. The cleaning and maintenance of Sand Bag Erosion Checks, Stone Check Dams, and Compost Filter Sock Ditch will be paid for under SECTION 212.