SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION 200-75 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION
212.01 Description.
This work includes: • The maintenance and cleaning of erosion, sediment, and pollution prevention control items • Performing inspection and documentation of RIDOT SWPPP and/or RIDOT SESC reports year-round Install a ll erosion, sediment, and pollution prevention controls and devices before the start of excavation when required by the SWPPP/SESC . There is no winter shutdown period associated with SECTION 212. SECTION 907 addresses dust control to reduce dust nuisance and hazards. Applicable Controls. Clean and maintain erosion, sediment, and pollution prevention controls according to SECTIONS 206 through 211. Definitions.
Part 200 — Earthwork and Erosion Control August 2025
200-76 SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION
212.02 Materials.
Provide materials used to repair and restore damaged erosion, sediment, and pollution prevention controls that comply with Subsections 206.02; 207.02; 208.02; 209.02; 210.02; and 211.02.
212.03 Construction Methods.
Maintain erosion, sediment, and pollution prevention controls . Provide erosion, sediment, and pollution prevention controls that prevent, under normal weather conditions, both the movement of soil materials and the intrusion of sediment -laden discharges into environmentally sensitive areas. Do not initiate or continue construction until all specified erosion, sediment, and pollution controls are in place, properly installed, and accepted by the Engineer. Routinely inspect erosion, sediment, and pollution prevention controls according to the SWPPP or SESC. Conduct these inspections at a minimum of every seven calendar days, within 24 hours of corrective actions occurring, and within 24 hours if the site receives 0.25 in. of rainfall from an individual storm event. After each inspection, implement corrective actions and perform all necessary cleaning, maintenance, and repairs when the maintenance of the erosion, sediment, and pollution controls is required . Initiate the requisite cleaning, maintenance, and repairs no later than the next consecutive calendar day after the SWPPP or SESC inspection was conducted and expeditiously perform the cleaning, maintenance, and repair work until the issue is remedied. If a holiday or weekend storm event occurs, ensure that the resources are available to restore and, if necessary, to replace any damaged erosion controls. Perform SWPPP or SESC inspections until the following criteria are met: • All disturbed areas are permanently stabilized, including storage/laydown areas. • All Project specific regulatory permit requirements have been met. Threshold for Cleaning Erosion, Sediment, and Pollution Prevention Controls. When directed by the Engineer and/or SWPPP inspector/Environmental Monitor, clean the erosion, sediment, and pollution controls after a rainstorm or when sediment deposits reach the heights indicated in the Table below.
Part 200 — Earthwork and Erosion Control August 2025
SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION 200-77 Minimum Threshold for Cleaning Control Type Threshold for Cleaning (Minimal)
Part 200 — Earthwork and Erosion Control August 2025
200-78 SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION ○ SWPPP/SESC reports from the inspector are incomplete/inaccurate, as determined by the Engineer, more than twice in a calendar year. ○ The Engineer determines that the certifying agency/organization does not meet these requirements. ○ A SWPPP/SESC report has been submitted with intentionally incorrect, inaccurate, or missing information, as determined by the Engineer. ● If the Engineer rejects a Certification or Professional Engineer registration, the Engineer, at his/her discretion, may contact the certifying agency/organization to provide the reason for the Engineer’s rejection of the certificate. ● If a Certification or Professional Engineer registration is rejected due to the first two items in the 4 th bullet above, the inspector shall submit a new certification. There is no time restriction. ● If a Certification or Professional Engineer registration is rejected due to the 3rd item in the 4th bullet above, the inspector shall submit a new certification no sooner than three months after rejection of the certification or registration. In special cases, the Engineer will forward the falsified documentation to RIDEM and/or EPA under the RIDOT Consent Decree reporting requirements.
Part 200 — Earthwork and Erosion Control August 2025
SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION 200-79 ● The Engineer has the authority to verify, enforce, and specify maintenance activities and to ensure that controls have been properly maintained. Failure to Maintain Erosion, Sediment, and Pollution Prevention Controls. The Engineer may determine that the required erosion, sediment, and pollution controls are not in place or have not been adequately maintained as recommended by the manufacturer, as specified in this Section or per permit requirements. The Department will deduct the daily charge from the Contractor’s payment for failure to comply. The daily charge per incident will continue for each consecutive calendar day thereafter until the deficiencies have been corrected as determined by the Engineer. The failure-to- comply charges are independent of other charges assessed by other agencies and/or entities.
Part 200 — Earthwork and Erosion Control August 2025
200-80 SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION ● Failure to minimize soil compaction where final vegetative stabilization will occur or where infiltration practices will be installed ● Failure to protect storm drain inlets by installing inlet protection measures that remove sediment from discharges before entry into a storm drain inlet ● Failure to use erosion controls and velocity dissipation devices within and along the length of any stormwater conveyance channel and at any outlets to slow down runoff to minimize erosion ● Failure to initiate and complete stabilization measures within the required deadlines ● Failure to properly install other necessary control measures ● Failure to provide effective controls for equipment and vehic ular fueling and maintenance activities ● Failure to effectively minimize the discharge of pollutants from equipment and vehicle washing ● Failure to implement appropriate controls to prevent/minimize the discharge of pollutants from any of the following: ○ Building materials/products ○ Landscaping chemicals and materials ○ Petroleum products and other chemicals ○ Hazardous and toxic waste ○ Construction and domestic wastes ○ Sanitary wastes ● Failure to provide effective controls for concrete washout ● Failure to provide effective control s for washing applicators/containers for stucco, paint, form release oils, curing compounds, or other hazardous materials ● Failure to comply with requirements for construction dewatering to minimize the discharge of pollutants
Part 200 — Earthwork and Erosion Control August 2025
SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION 200-81 previously on the same project. This includes any violations stated previously in SECTION 212 or otherwise identified in the SWPPP and/or SESC reports. Prior formal enforcement actions also include both EPA and S tate actions against the Contractor on the same Project. The Department will apply an escalation factor of 25 percent for the second time that failure-to-comply charges are assessed; an escalation factor of 50 percent will be applied to the third or subsequent time a failure-to-comply charge is assessed.
212.04 Method of Measurement.
Maintenance and Cleaning of Erosion, Sediment, and Pollution Prevention Controls will be measured as a lump sum item.
212.05 Basis of Payment.
The Department will pay for the completed and accepted quantities at the Contract unit price as follows. Pay Item Pay Unit Maintenance and Cleaning of Erosion, Sediment, and Pollution Prevention Controls LS
Part 200 — Earthwork and Erosion Control August 2025
200-82 SECTION 212 — MAINTENANCE AND CLEANING OF EROSION, SEDIMENT, AND POLLUTION PREVENTION The price constitutes full compensation for all labor, material, and equipment, including disposal, replacement, and incidentals to Subsections 206, 207, 208, 209, 210, and 211; the inspection and development of SWPPP and SESC reports ; and all resources, labor, materials, equipment, and incidentals required to complete the work, including: • Monthly progress payments under this item will be made according to Subsection 109.07. • Payment for authorized Contract time extensions at either the calculated monthly rate as defined above or on a basis according to Subsection 109.04. If the Contract is completed before the authorized completion date, the final monthly payment will be authorized after completion of the punch list and will include the remaining balance of the Contract lump sum price.