213Placement of Millings Beneath Guardrail

RI · 2022 (Aug 2025 compilation) Standard Specifications✓ Full text on BuildSpecBook pages 209–210 Save this section

Ask about Section 213

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 213 — PLACEMENT OF MILLINGS BENEATH GUARDRAIL 200-83 — PLACEMENT OF MILLINGS BENEATH GUARDRAIL

213.01 Description.

This work includes the placement of asphalt millings from cold planing operations at all guardrail locations less than 2 ft from the edge of the existing pavement.

213.02 Materials.

Millings include asphalt material ground or crushed so that 100 percent of the material passes a 1-in. sieve. Ensure that the millings are free of debris, topsoil, and soil clumps.

213.03 Construction Methods.

Obtain millings from stockpiled locations on the Project site or off-site sources. Do not use millings from off-site sources unless authorized by the Engineer. Ensure that the millings are free of debris, topsoil, and soil clumps. Unless otherwise direc ted by the Engineer, place millings according to the following: • For guardrail installations 4 ft or less from the face of guardrail to the edge of pavement, place the millings from 1 ft behind the post to the edge of pavement to a depth of 5 in. • For guardrail installations greater than 4 ft from the face of guardrail to the edge of pavement, place the millings for a width of 2 ft on center with the guardrail post to a depth of 5 in. Grade beneath the guardrail to ensure that the finished surface of the millings is flush with the asphalt berm or edge of pavement and shaped, compacted, and sloped to drain away from the pavement. Do not dismantle the guardrail to perform any work associated with this item. Restrict the stockpiling of millings to approved, on-site locations. Do not stockpile millings on the roadway shoulder or adjacent to a travel lane. Excavate and remove the material beneath the guardrail, in compliance with the SESC, to ensure that damage to the guardrail does not occur. Dispose of all material removed from beneath the guardrail, including excess millings.

213.04 Method of Measurement.

Placement of Millings Beneath Guardrail will be measured by the linear feet of guardrail for which millings were placed.

213.05 Basis of Payment.

The Department will pay for the completed and accepted quantities at the Contract unit price as follows.

Part 200 — Earthwork and Erosion Control August 2025

200-84 SECTION 213 — PLACEMENT OF MILLINGS BENEATH GUARDRAIL Pay Item Pay Unit Placement of Millings Beneath Guardrail LF Payment at the Contract unit price is full compensation for all resources, labor, materials, equipment, and incidentals required to finish the work, complete and accepted. Trimming and Fine Grading is not measured for payment. It will be included in the associated Item of work.

Get an email when 213 changes

Rhode Island revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction (Blue Book), 2022 (Aug 2025 compilation) Edition. Pages 209–210 of 951. View official source ↗

Ask about this section

Scoped to Rhode Island RIDOT Standard Specifications for Road & Bridge Construction, Section 213 — Placement of Millings Beneath Guardrail. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.