SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING 400-39 — RUBBERIZED ASPHALT CHIP SEALING
412.01 Description.
This specification covers all materials, equipment, construction, application, and post-placement procedures for the rubberized asphalt chip sealing of existing paved surfaces at the required locations. The work consist s of an application of rubberized asphalt binder followed by an application of pre-coated cover aggregate.
412.02 Materials.
Asphalt Cement. Use n eat asphalt cement that meets AASHTO M320 for PG 58- 28. Ensure that t he high temperature grade does not exceed PG 58. Granulated Rubber. Use granulated rubber that is vulcanized rubber from the ambient temperature processing of scrap pneumatic tires. Use granulated rubber that meets the following gradations; no substitutions will be accepted: Sieve Size Percent Passing #10 100 #16 90 – 100 #30 25 – 100 #80 0 – 20 The use of rubber of multiple types from multiple sources is acceptable if the overall blend of rubber meets the gradation requirements. Ensure that the length of the individual rubber does not exceed ⅛ in. Ensure that t he specific gravity of reclaimed vulcanized ground rubber is between 1.10 and 1.20. The rubber supplier shall supply the c ertification. Use rubber in the rubberized asphalt binder that is free of loose fabric, wire, and other contaminants. Up to 4 percent (by weight of rubber) calcium carbonate or talc may be added to prevent caking or sticking of the particles together. Ensure that the ground rubber is sufficiently dry to be free flowing and not produce foaming when blended with the hot PG binder. Cover Aggregate. Use cover aggregate that is virgin crushed quarry rock from a RIDOT approved source. Do not use processed gravel. For the material retained on the #4 sieve, ensure that not more than 10 percent of the particles have a flatness or elongation ratio greater than 3:1 (ASTM D4791). Ensure that t he aggregate wear, from resistance to abrasion, is a maximum of 30 percent as determined by the Los Angeles Abrasion test (AASHTO T96). Pre-heat t he aggregate to a temperature between 280°F and 320°F, and uniformly and completely precoat with a PG 64 -28 or PG 58-28 before application. Determine the asphalt content for the precoating by laboratory and field testing that is approved by the Engineer. Ensure that the gradation meets the following limits.
Part 400 — Asphalt Pavements August 2025
400-40 SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING Sieve Size Percent Passing ½ in. 100 ⅜ in. 85 – 100 #4 0 – 8 #8 0 – 4 #200 0 – 2 Note: Determine a suitable location for stockpiling the required aggregate and ensuring that stockpiles do not become contaminated. Clean up at the stockpile sites and at all roads between the stockpile and the Project location. A minimum of 30 days before construction, provide a representative sample of the proposed aggregate to the asphalt rubber supplier for testing. Perform gradation testing to determine the design application rates for the asphalt rubber binder and the cover aggregate. Perform a coating and stripping test (AASHTO T 182) to ensure compatibility of the asphalt rubber binder with the processed aggregate. Provide a copy of the test results to the Engineer before the start of work. Rubberized Asphalt. Add granulated rubber to the PG58-28 asphalt cement at a rate of 18 percent ±3 percent by total weight (i.e., asphalt cement plus granulated rubber). Ensure that the physical requirements of the rubberized asphalt meet ASTM D 6114 Type II. The supplier of the rubberized asphalt shall certify the percent of granulated rubber in the blend. Ensure that the temperature of the asphalt cement is between 325°F and 400°F at the time the granulated rubber is added. Combine and mix together the asphalt cement and granulated rubber in a blender unit and react for a minimum of one hour. Ensure that there are no agglomerations of rubber particles in excess of 2 in. in the least dimension in the mixing chamber. Maintain the temperature of the asphalt-rubber binder immediately after mixing between 325°F and 375°F for a minimum of 45 minutes before use. When a job delay occurs after full reaction, the rubberized asphalt may be allowed to cool. Reheat the rubberized asphalt slowly just before application but not to a temperature exceeding 375ºF. An additional quantity of granulated rubber or additive not exceeding 3 percent by volume of the rubberized asphalt may be added after reheating. Testing and Certification. Sample the rubberized asphalt once per lot at the point of manufacture, tested and certified by an AASHTO resource (formally AMRL) accredited laboratory approved for asphalt rubber binder testing. The laboratory shall certify that the rubberized asphalt meets the requirements of ASTM D 6114 Type II specifications. A lot is defined as each batch produced but not to exceed the volume of the manufacturer’s dedicated asphalt rubber reaction/storage tank. In addition to the ASTM D 6114 Type II specification, to ensure adequate blending residence time and binder quality, test every lot as follows:
Part 400 — Asphalt Pavements August 2025
SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING 400-41 Test (on the produced asphalt rubber binder) Result AASHTO T315 Original Binder 2mm DSR @ 82 G*/sin (d) >1.00 kPA Report all data to the Engineer. Reporting. Before starting work, submit a Quality Control Plan from the a sphalt rubber supplier that meets the format requirements of AASHTO R 26. Submit a weekly manufacturer’s report for each lot of asphalt rubber produced that includes the following as a minimum: • Total quantity of asphalt binder in tons • Tons and percentage of ground rubber based on total asphalt rubber binder • ASTM D6114 certified test results • AASHTO T 315 Original Binder 2mm DSR @ 82 Engineering. Determine the asphalt content and mixing time of the pre- coated aggregate to obtain a uniform and complete pre-coating. Forward samples to the Engineer for approval. Design the rubberized asphalt chip seal surface treatment. No later than two weeks before work commences, submit for the approval of the Engineer the surface treatment design with supporting test data, specifying the additives for the rubberized asphalt, application rate of the rubberized asphalt, and the source, composition, and application rate of the cover aggregate. Include samples of each material with the submittal. Once the materials and design are approved, no substitution will be permitted unless approved by the Engineer.
412.03 Construction Methods.
Equipment.
Part 400 — Asphalt Pavements August 2025
400-42 SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING percentage of ground rubber based on total asphalt rubber binder. Report all data to the awarding authority as outlined in Subsection 412.02.6. ● A dedicated asphalt rubber reaction/storage tank equipped with a heating system to maintain the proper temperature of the binder and an internal mixing unit capable of maintaining a homogeneous mixture of asphalt and ground rubber.
Part 400 — Asphalt Pavements August 2025
SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING 400-43 ensure that the tires do not contact the road surface until after the cover aggregate has been applied. Equip the unit with an electronic radar type sensor to measure ground speed and that will automatically adjust the cover aggregate application rate depending on the width of application and the speed of the spreader. Ensure that the sensor can apply cover aggregate at a uniform coverage on any grade from 0 to 6 percent. Equip the spreader with an integral hopper with a minimum capacity of 5 tons of cover aggregate that can be filled by trucks to ensure that the truck tires never contact the rubberized asphalt treated road surfaces until the cover aggregate has been properly applied. To maintain constant cover aggregate application, use a self-locking truck hitch that permits towing of aggregate trucks without stopping the spreader and that can maintain positive engagement over irregular terrain.
4.75 HMA shim course produced according to SECTION 401. Apply a tack coat to the surface
before the shim course is placed. Mill high spots, localized bumps, and joints to raise the surface to grade or by using other treatments as approved by the Engineer. At the limits of the work, ensure that there is a smooth transition of the profile between the existing pavement and the rubberized asphalt chip seal. Remove and properly dispose of all pavement markings, with the exception of temporary markings (waterborne paint) . Use fast drying waterborne pavement markings to replace the removed existing pavement markings. Protect manholes, valve boxes, and other service entrances from the applied material. Cover and seal bridge joints, appurtenances, drainage openings, etc. , to prevent clogging and prevent the entry of loose aggregate. Do not begin application of the rubberized asphalt chip seal until the surface preparation has been approved by the Engineer.
Part 400 — Asphalt Pavements August 2025
400-44 SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING Construction Procedures.
Part 400 — Asphalt Pavements August 2025
SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING 400-45 Engineer. On a daily basis, remove any debris associated with the performance of the work.
412.04 Method of Measurement.
Rubberized Asphalt Chip Sealing will be measured by the number of square yards of rubberized asphalt chip seal placed. Removal of pavement markings will be measured by the LF.
412.05 Basis of Payment.
The Department will pay for the completed and accepted quantities at the Contract unit price as follows. Pay Item Pay Unit Rubberized Asphalt Chip Sealing SY The price constitutes full compensation for traffic control and pilot car; mobile cell phones; surface preparation; furnishing, transporting, handling, placing, and rolling the material specified; all sweeping and removal of excess aggregate; site cleanup; and furnishing all labor, tools, equipment, and incidentals required to finish the work, complete and accepted. The shim course will be paid for under separate items in the C ontract. The cost of tack coat for shim course is incidental and not paid separately. Removal of pavement markings is paid under Subsection T20.05.
Part 400 — Asphalt Pavements August 2025
400-46 SECTION 412 — RUBBERIZED ASPHALT CHIP SEALING Include the cost for the temporary waterborne pavement markings to replace the removed pavement markings in the unit bid price for “Remove Existing Pavement Marking Lines.”
Get an email when 412 changes
Rhode Island revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.