B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General Provisions (00100-00999)

413[SECTION NOT USED]

RI · 2024 Standard SpecificationsBook pages 232232View official source ↗

4−54 SECTION 414 WARM MIX ADDITIVE

414.01 DESCRIPTION . This work consists of incorporating a WMA (Warm Mix Additive) in HMA

(Hot Mix Asphalt).

414.02 MATERIALS. One unit of WMA shall be added to each ton of HMA . All WMA shall be

selected from the RIDOT Approved Materials List and shall be added at a dosage rate recommended by the manufacturer.

414.03 CONSTRUCTION METHODS. If HMA is designated as “with WMA”, the Contractor shall

use a WMA. If HMA is not designated as “with WM A”, the Contractor may request to use a WMA at his own discretion and expense. Additionally, the Engineer may direct the Contractor to use a WMA. If a WMA is used it shall be for an entire day’s production for that class of HMA.

414.04 METHOD OF MEASUREMENT. WMA will be measured by the number of units actually

used in accordance with the specifications and/or as directed by the Engineer.

414.05 BASIS OF PAYMENT The accepted quantity of the WMA will be paid for at its respective

contract unit price per each as listed in the Proposal.

Source: Rhode Island Standard Specifications (Bluebook), 2024 Edition. Pages 232232 of 826.