B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Part 700 — Drainage & Selected Utility Accessories

712Gate Box

RI · 2022 (Aug 2025 compilation) Standard Specifications✓ Full text on BuildSpecBook pages 359–360 Save this section

Ask about Section 712

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

— GATE BOX

712.01DESCRIPTION

This work includes removing and disposing existing water or gas gate boxes and subsequently providing new water or gas gate boxes at the required locations. 712. 02 MATERIALS. Castings. Use iron castings that conform to Subsection M05.05.9(f). Fabr ication. Document that the water and gas gate boxes conform to the requirements of the respective manufacturers, utility companies, and municipalities. Clean the gate boxes, including covers, and thereafter coat, paint, or dip all surfaces in an asphalt or asphalt base paint or coating. 712. 03 CONSTRUCTION METHODS. R emoval of Existing Boxes. Remove the existing gate valve boxes to not damage or disturb the valves or appurtenant fittings that remain. After the gate boxes have been removed, the boxes shall become the property of the Contractor. In stallation . Set the boxes to the required line and grade. All installations shall be approved by the applicable gas and/or water company. Fit the boxes to the valve and secure the boxes during backfilling. Tamp the backfill material in place. Construct the boxes to prevent the separation of the upper section from the lower section to prevent the upper section from turning when removing the lid. 712. 04 METHOD OF MEASUREMENT. Gate Box will be measured by the number of assemblies installed. 712. 05 BASIS OF PAYMENT. The Department will pay for the completed and accepted quantities as follows.

Part 700 — Drainage and Selected Utility Accessories August 2025

SECTION 712 — GATE BOX 700-35

Pay Item Pay Unit Gate Box EA The Contract prices constitute full compensation for all labor, materials, and equipment for providing the assemblies, including removal and disposal of existing gate boxes, excavation, backfill, concrete collar, and all incidentals required to finish the work, complete and accepted.

Sections that cite this one

Get an email when 712 changes

Rhode Island revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction (Blue Book), 2022 (Aug 2025 compilation) Edition. Pages 359–360 of 951. View official source ↗

Ask about this section

Scoped to Rhode Island RIDOT Standard Specifications for Road & Bridge Construction, Section 712 — Gate Box. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.