713ADJUST CURB STOP, WATER GATE AND GAS GATE BOXES

RI · 2024 Standard SpecificationsBook pages 331332View official source ↗

7−25

712.05 BASIS OF PAYMENT. The accepted quantities of "Water Gate Boxes" and/or "Gas Gate

Boxes" will be paid for at their respective contract unit prices per each such assembly as listed in the Proposal. The prices so-stated constitute full and complete compensation for all labor, materials, and equipment for providing said assemblies, including removal and disposal of existing gate boxes, excavation, backfill, and all incidentals required to finish the work, complete and accepted by the Engineer.

713.01 DESCRIPTION. This work consists of adjusting existing utility gate boxes and curb stops

to new grades indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. 713.02 MATERIALS. Materials required for the adjustment of boxes shall conform to the applicable paragraphs of Subsection 712.02 , of these Specifications.

713.03 CONSTRUCTION METHODS. Utility gate boxes and curb stops shall be carefully

loosened from the surrounding material and adjusted to the designated new grades. In this regard, the use of gate box adapters will be allowed. The Contractor shall then carefully place approved granular material around the gate boxes and curb stops and hand tamp this material until it is well compacted. When paved areas are open to traffic, the exposed vertical faces of exposed utility structures shall be painted with iridescent reflective orange paint if less than or equal to 1-3/4 inches. An asphalt ramp shall be provided in case s where the exposed vertical face exceeds 1-3/4 inches. The Contractor shall maintain access to the curb stops and utility gate boxes at all times. When an existing gate box or curb stop is det ermined by the Engineer to be unadjustable, a new gate box or curb stop shall be furnished and installed in accordance with the applicable provisions of SECTION 712; WATER AND GAS GATE BOXES , of these Specifications.

713.04 METHOD OF MEASUREMENT. "Adjust Curb Stop Boxes,” "Adjust Water Gate Boxes,”

and "Adjust Gas Gate Boxes" will be measured by the number of such units actually adjusted in accordance with the Plans and/or as directed by the Engineer. 713.05 BASIS OF PAYMENT. The accepted quantities of "Adjust Curb Stop Boxes,” "Adjust Water Gate Boxes,” and "Adjust Gas Gate Boxes" will be paid for at their respective contract unit prices per each such unit as listed in the Proposal. Each and every adjustment authorized by the Engineer will be paid for. The prices so-stated constitute full and complete compensation for all labor, materials, equipment and all incidentals required to finish the work, complete and accepted by both the Engineer and the representative of the particular utility company involved. 7−26 SECTION 714 POST TYPE HYDRANTS

714.01 DESCRIPTION. This work consists of installing or removing and relocating post type

hydrants to locations indicated on the Plans, or as directed by the Engineer, all in accordance with these Specifications.

714.02 MATERIALS. All materials shall conform to the applicable requirements established by

both the water company or municipality that ow ns the particular system involved, and these Specifications. All new and relocated post type hydrants shall be a break-away type. The Contractor shall provide documentation to the effect that the hydrants, fittings and all appurtenances conform to the requirements of the respective manufacturers, water companies and municipalities.

714.03 CONSTRUCTION METHODS. The Contractor will be required to notify the applicable

water company and/or municipality and the local fi re company at least 24 hours in advance of any work involving the hydrants. All installations fo r new and relocated hydrants shall be subject to the approval of the applicable water company or m unicipality. Additional requirements for the installation of hydrants, including but not limited to pressure testing, disinfection, inspection and thrust block installations must be performed in accordance with the AWWA and the established practices and requirements of the owner.

714.03.1 Relocation of Post Type Hydrant. Hydrants to be relocated shall be carefully removed

and transported to a stockpile location as directed by the Engineer. Upon removal of the hydrant, the Contractor shall note the depth of the standpipe section such that the proper height can be placed to ensure that the break-away coupling is at the proper height. At the stockpile area, the hydrants shall be cleaned and made ready for use. Hydrants shall be relocated and installed in accordance with the established practices of the water company or municipality that owns the water system.

714.03.2 New Hydrant Installation . Hydrants shall be installed in accordance with the

established practices of the water company or munici pality that owns the system. The Contractor is required to set the seating flange/breakaway coup ling above finish grade within the limits shown on the Plans.

714.04 METHOD OF MEASUREMENT. "Remove and Relocate Post Type Hydrant" and “Post

Type Hydrant” will be measured by the number of such assemblies actually relocated or installed in accordance with the Plans and/or as directed by the Engineer. Hydrants which have been set with the seating flange/breakaway coupling outside the limits shown on the Plans will not be accepted.

714.05 BASIS OF PAYMENT. The accepted quantities of "Remove and Relocate Post Type

Hydrant" and “Post Type Hydrant” will be paid for at the contract unit price per each such assembly as listed in the Proposal. The prices so-stated shall constitute full and complete compensation for all labor, materials, tools and equipment, including excavation, removal, hauling, stockpiling, backfill, compaction, piping, plugs, disinfection, testing, thrust blocks, bedding materials and all incidentals required to finish the work, complete and accepted by the Engineer and the respective water company or municipality.

Source: Rhode Island Standard Specifications (Bluebook), 2024 Edition. Pages 331332 of 826.