Rhode Island Department of Transportation (RIDOT) · RIDOT Standard Specifications for Road & Bridge Construction

Section 802 — Temporary Bridges

Rhode Island RIDOT Standard Specifications for Road & Bridge Construction, Section 802. Full text, cross-references and related pay items on BuildSpec.

SECTION 802 — TEMPORARY BRIDGES 800-3 — TEMPORARY BRIDGES 802.01 DESCRIPTION. This work includes the construction, maintenance, load rating, and subsequent removal (including area restoration) of temporary bridges. 802.02 MATERIALS. Ensure that the materials used for the construction of temporary bridges conform to PART M. 802.03 CONSTRUCTION METHODS. General. Submit a load rating to the Bridge Engineering Section before opening the bridge to traffic according to the latest RIDOT Bridge Load Rating Guidelines. Provide the Department with 45 days notice before opening the bridge. Approaches.…

The full text is for BuildSpec members

Read the complete section, search across every adopted code, run the calculators and ask Copilot — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Start your free 14-day trialSign in