Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction
Section 513 — TEMPORARY BRIDGES
Illinois Standard Specifications for Road and Bridge Construction, Section 513. Full text, cross-references and related pay items on BuildSpec.
Temporary Bridges Art. 513.03 411 (b) Driving Piles. This work will be paid for at the contract unit price per foot (meter) for DRIVING PILES. (c) Extensions. Extensions for precast concrete and precast, prestressed concrete piles will be paid for according to Article 109.04. (d) Unplanned Splices. When the driven lengths exceed the estimated lengths specified in the plans, additional field splices for metal shell, steel, and timber piles required to provide those lengths will be paid for according to Article 109.04. (e) Test Piles. Furnishing and driving test piles will be paid for at the…
The rest of Section 513 — TEMPORARY BRIDGES is for members
You're reading the opening of Section 513 — TEMPORARY BRIDGES. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations