9−1PART 900 INCIDENTAL CONSTRUCTION AND SERVICES
901.01 DESCRIPTION . This work consists of providing galvanized coated steel beam guardrail
and end sections of various types and configurations at the locations indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. 901.01.1 Guardrail End Treatment, Non-Energy Absorbing Terminal and Guardrail End Treatment, Energy Absorbing Terminal. Work under these items shall consist of furnishing and installing a guardrail end treatment in the form of a non-energy or energy absorbing terminal section approved in accordance with MASH or NCHRP 350 and that passes, at a minimum, Test Level 3 (TL-3) crash test criteria at locations indicated on the Plans or as directed by the Engineer. As part of this work, an object marker shall be furnished and affixed to the approach end of the guardrail terminal in accordance with the latest MUTCD. 901.02 MATERIALS. 901.02.1 Metal Beam Rail. Metal Beam Rail shall conform to the applicable requirements of Subsection M.08.03 of these Specifications.
901.02.2 Guardrail Posts. Guardrail Posts shall conform to the applicable requirements of
Subsection M.08.07 of these Specifications.
901.02.3 Guardrail Hardware. Hardware shall conform to the applicable requirements of
Subsection M.08.08 of these Specifications.
901.02.4 Guardrail End Treatment, Non-Energy Absorbing Terminal and Guardrail End
Treatment, Energy Absorbing Terminal. The non-energy and energy absorbing terminals shall be products listed on the Department’s Approved Materials List, or approved equivalents. Any products not included on the Approved Materials Li st shall have been tested and verified to meet all the criteria for MASH or NCHRP 350, TL-3, and the Contractor shall provide supporting documentation such as an FHWA acceptance letter. The object marker affixed to the approach end of the guardrail terminal shall meet the requirements of the latest MUTCD. Every terminal shall have an object marker. The object marker shall conform to the size and shape of the approach end of the guardrail terminal with alternating black and retroreflective yellow stripes sloping dow nward at an angle of 45 degrees toward the side of the guardrail on which traffic is to pass. High intensity retroreflective sheeting shall be used for the object marker, and it shall conform to the requirements of AASHTO M 268, Type A, Standard Specification for Retroreflective Sheeting for Flat and Vertical Traffic Control Applications. The object marker shall have a smooth weather-resistant outer surface, a pre-coated pressure sensitive adhesive backing, and adhere to steel. The adhesive shall have no staining effect on the 9−2 retroreflective sheeting and shall be mildew resistant.
901.03 CONSTRUCTION METHODS. 901.03.1 Installation.
901.03.3 Submittals. Prior to installation of the “Guardrail End Treatment, Non-Energy Absorbing
Terminal” and “Guardrail End Treatment, Energy Abso rbing Terminal”, the Contractor shall furnish three (3) copies of the manufacturer’s installation manual to the Engineer. The Contractor shall submit for approval Shop Drawings for guardrail te rminals not on the Approved Materials List in accordance with the provisions of Subsection 105.02 of these Specifications.
901.04 Method of Measurement.
901.04.1 Steel Beam Guardrail. "Steel Beam Guardrail" of the various types indicated will be
measured by the number of linear feet, end-to-end of continuous sections, actually installed in accordance with the Plans and/or as directed by the Engineer. 901.04.2 Guardrail Posts in Ledge. When required, "Guardrail Posts in Ledge" will be measured by the number of such posts actually installed in accordance with the Plans and/or as directed by the Engineer. 901.04.3 End Sections. "End Sections" of the various types indicated will be measured by the number of such sections actually installed in accordance with the Plans and/or as directed by the Engineer. 901.04.4 Guardrail End Treatment, Non-Energy Absorbing Terminal and Guardrail End Treatment, Energy Absorbing Terminal. “Guardrail End Treatment, Non-Energy Absorbing Terminal” and “Guardrail End Treatment, Energy Absorbing Terminal” will be measured by the number of units installed in accordance with the Plans and/or as directed by the Engineer. 901.05 BASIS OF PAYMENT.
901.05.1 Steel Beam Guardrail. The accepted quantities of "Steel Beam Guardrail" of the various
types and configurations indicated on the Plans will be paid for at the respective contract unit prices per linear foot as listed in the Proposal. The prices so-stated constitute full and complete compensation for all labor, materials and equipment, including hardware, nuts, bolts, washers, 9−4 splice plates, reflectorized triangular delineators, posts driven in earth, and all incidentals required to finish the work, complete and accepted by the Engineer. 901.05.2 Guardrail Posts in Ledge. The accepted quantities of "Guardrail Posts in Ledge" will be paid for at the contract unit price per each as listed in the Proposal. The price so-stated constitutes full and complete compensation for all labor, materials and equipment, including rock excavation and all incidentals required to finish the work, complete in place and accepted by the Engineer. 901.05.3 End Sections. The accepted quantities of "End Sections" of the various types and configurations indicated on the Plans will be paid for at their respective contract unit prices per each as listed in the Proposal. The prices so-stated constitute full and complete compensation for all labor, materials and equipment, including hardware, nuts, bolts, washers, splice plates, and all incidentals required to finish the work, complete in place and accepted by the Engineer. 901.05.4 Guardrail End Treatment, Non-Energy Absorbing Terminal and Guardrail End Treatment, Energy Absorbing Terminal. The accepted quantities of “Guardrail End Treatment, Non-Energy Absorbing Terminal” and “Guardrail E nd Treatment, Energy Absorbing Terminal” will be paid for at their respective contract unit prices per each as listed in the Proposal. The prices stated constitute full and complete compensation for all labor, materials, equipment and all incidentals required to finish the work, complete and accepted by the Engineer. SECTION 902 STEEL BACKED TIMBER GUARDRAIL
902.01 DESCRIPTION. This work consists of providing steel backed timber guardrail and terminal
sections of various types and configurations at the locations indicated on the Plans or as directed by the Engineer, all in accordance with these Specifications. 902.02 MATERIALS.
902.02.1 Timber Rail, Blocks and Posts. Timber items shall be pressure-treated sawn structural
lumber, either spruce or fir, and shall conform to the requirements of AASHTO M168; Standard Specifications for Wood Products, and the applicable requirements of Subsections M.08.04 and
902.02.2 Guardrail Hardware Items. Hardware items shall include all metal fastenings required
for timber connections or for connecting timber to concrete or steel, and shall conform to the requirements of Subsections M.05.04.13 and M.08.08 of these Specifications, unless otherwise specified. Hardware items shall include such items as bolts, washers, nuts, tie rods, turnbuckles and other items as specified. Unless otherwise specified, hardware items shall be galvanized in accordance with Subsection M.05.04.13, Para. e of these Specifications. Steel backing plates, unless otherwise specified, shall be carbon steel conforming to AASHTO M270 (ASTM A709) Grade 36.