810— Seeding

SC · 2025 Standard Specifications✓ Full text on BuildSpecBook pages 865–866 Save this section

Ask about Section 810

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Division 800 — Section 810

800-34 Section 810 — Seeding

1 Ensure that all seeding conforms to the Special Provisions , the applicable SCDOT Supplemental Specifications, the OMR Standard Method of Tests, and the Supplemental Technical Specification SC-M-810-4 .

Division 800 — Section 811

800-35 Section 811

This Section has been Reserved for Future Use.

Division 800 — Section 812

800-36 Section 812 — Erosion Control Measures

812.1 Description 1 Provide erosion control measures as specified. 812.2 Materials 1 None specified. 812.3 Construction 1 In addition to the erosion control measures specified in the Plans, Standard Specifications , Supplemental Technical Specifications , and Special Provisions, all land disturbing activities (clearing and grubbing, excavation, borrow and fill) are subject to the requirements in the following permits and regulations: •South Carolina Code of Regulations §63-380, “Standard Plan for Erosion, Sediment, and Stormwater Runoff Control .” The regulation can be found at the South Carolina Legislature website. •Erosion and Sediment Reduction Act of 1983 (Title 48, Chapter 18 of the South Carolina Code of Laws of 1983, as amended). Section 70 authorizes the SCDES to administer the regulation with respect to lands under the jurisdiction of the South Carolina Department of Transportation. The code can be found at the South Carolina Legislature website. •National Pollutant Discharge Elimination System (NPDES) General Permit Number SCR160000, effective January 1, 2013 (or latest version). The Environmental Protec tion Agency , in accordance with the Federal Clean Water Act, has granted to the SCDES the authority to administer the federal NPDES permit program in the State of South Carolina. T he permit m ay be viewed a t the SCDOT website. 2 In accordance with the NPDES General Permit SCR160000 Section 2.1.F, the Prime Contractor hired by SCDOT for a project will become a Secondary Operator with SCDOT upon signing the awarded contract. The Secondary Operator must sign the SCDOT Construction Certification Form (800.06) before any work is performed on the project. 3 By signing the Contract , the C ontractor accepts/understands the terms and conditions of the Storm Water Pollution Prevention Plan (SWPPP) as required by the NPDES General Permit SCR160000 and may be legally accountable to SCDES for compliance with the terms and conditions of the SWPPP. In addition, the C ontractor is responsible for ensuring that all subcontractors comply with the SWPPP and the permit requirements.

Referenced in this section

Get an email when 810 changes

South Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: South Carolina Standard Specifications for Highway Construction, 2025 Edition. Pages 865–866 of 908. View official source ↗