622.01 664 SECTION 622 – SHOTCRETE
622.01 Description ................................ ................................ ................... 664
622.02 Materials ................................ ................................ ...................... 664
622.03 Propor tioning and Quality Assurance of Shotcrete ...................... 664
622.04 Preconstruction Test Panels ................................ ......................... 667
622.05 Production Test Panels ................................ ................................ . 668
622.06 Test Panel Curing and Testing ................................ ..................... 668
622.07 Mixing and Batching Shotcrete ................................ .................... 669
622.08 Equipment ................................ ................................ .................... 669
622.09 Method of Measurement ................................ .............................. 669
622.10 Basis of Payment ................................ ................................ .......... 670
DESCRIPTION
622.01 Description
This work consists of constructing shotcrete in reasonably close conformance with the Plans or as established by the Engineer. MATERIALS
622.02 Materials
Provide materials as specified in: Portland Cement , Type I ................................ ........................ 901.01 Fine Aggregate ................................ ................................ ....... 903.01 Coarse Aggregate ................................ ................................ .. 903.22 Water ................................ ................................ ...................... 921.01 Fly Ash ................................ ................................ ................... 921.15
622.03 Proportioning and Quality Assurance of Shotcrete
622.03 1.
622.03 666 Table 622.03-1: Shotcrete Performance Requirements Parameter Value 3-Day Compressive Strength (psi) 2000 28-Day Compressive Strength (psi) 4000 Minimum Cementitious per cubic yard 660 Maximum Water/Cement (pound/pound) 0.45 Air Content (%) 7-10 (1) 7-Day Maximum Absorption (%) 8
622.04 Preconstruction Test Panels
Furnish two preconstruction test panels for each proposed mixture being considered and for each shooting position to be encountered on the Project. Make preconstruction test panels prior to production and as part of the mix design submittal process , using the same equipment, materials, mixture, proportions, and procedures proposed for the work. 622.05 668 Construct the preconstruction test panels with minimum dimensions of 30 x 30 inches square and at least 4 inches thick. Slope the sides at 45 degrees over t he full panel thickness of release rebound. Construct one preconstruction test panel to include the maximum anticipated reinforcing congestion shown on the Plans. Cores extracted from the test panel shall demonstrate encapsulation of the reinforcement i n accordance with ACI 506.2 equal to core Grade 2 or better. Construct the second preconstruction test panel without reinforcement and extract nine 3 -inch diameter cores for absorption and compressive strength testing.
622.05 Production Test Panels
Provide nine 3 -inch diameter cores from a minimum of one production test panel or, instead of production test panels, taken from the shotcrete facing during the first production application of shotcrete and henceforth for every 5,000 square feet of shotcrete placed. Cut at least nine 3-inch diameter core samples from each production test panel for absorption and compressive strength testing. If choosing to take cores from the wall face instead of making production t est panels, take cores at the locations designated by the Engineer. Fill core holes in the wall facing by dry packing with non -shrink patching mortar after cleaning and dampening the holes. Do not fill core holes with shotcrete. Construct p roduction test panels simultaneously with the shotcrete facing installation at times designated by the Engineer. Production test panels shall be a minimum full thickness of 18 x 18 inches square and at least 4 inches thick. The Contractor may extract test specimens f rom test pan els in the field or may transport them to another location for extraction. Keep panels in their forms during transport .
622.06 Test Panel Curing and Testing
Immediately after shooting the test panels, field moist cure the panels by covering and tightly wrapping with a sheet of material meeting ASTM C171 until they are delivered to the testing lab or test specimens are extracted. Do not immerse test panels in water. Do not further disturb test panels for the first 24 hours after shooting. 622.07 669 Clearly mark preconstruction/production cores and containers to identify core locations. If for production testing, mark the section of the wall represented by the cores o n the cores and container. Immediately wrap cores in wet burlap or material meeting ASTM C171, and seal in a plastic bag. Deliver cores to the Engineer or testing lab, as directed by the Engineer, within 48 hours of shooting the panels. When the test le ngth of a core is less than twice the diameter, the correction factors given in AASHTO T 24 will be applied to obtain the compressive strength of individual cores. The remainders of the panels shall become the property of the Contractor.
622.07 Mixing an d Batching Shotcrete
Aggregate and cement may be batched by weight or by volume in accordance with AASHTO M 241 (ASTM C685). Ready mix shotcrete shall comply with AASHTO M 157. Batch, deliver, and place shotcrete within 90 minutes of mixing. The use of retarding admixtures may extend application time beyond 90 minutes if approved by the Engineer. Premixed and packaged shotcrete mix may be provided for on -site mixing. The packages shall contain materials conforming to 622.02 and be from a source on the Department’s Producer List . Place the material within the time limit following mixing recommended by the manufacturer. EQUIPMENT
622.08 Equipment
Use mixing equipment that thoroughly blends the materials in sufficient quality to maintain placing continuity. COMPENSATION
622.09 Method of Measurement
The Department will measure completed and accepted quantities of shotcrete in square feet, by taking measurements over and parallel to the actual area of the applied shotcrete. 622.10 670 622.10 Basis of Payment The Department will pay for accepted quantities at the contract prices as follows: Item Pay Unit Shotcrete Square Feet Such payment is full compensation for furnishing all labor, materials, tools, equipment, and incident als required to place the shotcrete, including surface preparation. 623.01 671 SECTION 623 – BRIDGE EXPANSION JOINTS
623.01 Scope of Work ................................ ................................ ............. 671
623.02 Modular Roadway Expansion Joints ................................ ............ 671
623.03 Strip Seal Expansion Joints ................................ .......................... 675
623.04 Method of Measurement ................................ .............................. 678
623.05 Basis of Payment ................................ ................................ .......... 678
DESCRIPTION
623.01 Scope of Work
This work consist s of fabricating and installing shop fabricated bridge expansion joint systems , of the general size, configuration, and joint movement specified.
623.02 Modular Roadway Expansion Joints
This Subsection is applicable to expansion joints having a required movement in excess of 4 inches.