Article 1 — Description
Fabricate and erect structural steel and other metals used for steel structures or for steel portions of structures .
Article 2 — Materials
2.1 Base Metal . Use metal that meets Item 442, “Metal for Structures.”
2.2 Approved Electrodes and Flux -Electrode Combinations . Use only electrodes and flux -electrode
combinations conforming to AWS A5 specifications a nd pertinent classif ications for the applicable welding processes. When requested, submit a current Certificate of Conformance (COC) containing al l test results as required by the applicable AWS A5 specification and welding code. Provide proof of Buy America compliance for welding consumables when requested. For bridge main member fabrication, submit the COC annually .
2.3 High -Strength Bolts . Use fasteners that meet Item 447, “Structural Bolting.” Use galvanized fasteners on
field connections of bridge members when ASTM F3125, Grade A325 bolts are specified and steel is painted.
2.4 Paint Systems. Provide the paint system (surface preparation, primer, intermediate, and appearance coats as required) shown on the plans. Provide System IV if no system is specified.
2.4.1 Standard Paint S ystems. Standard paint systems for painting new steel include the following.
2.4.1.1. System III -B. Provide paint in accordance with DMS -8101 , “Structural Steel Paints —Performance.” Provide inorganic zinc (IOZ) prime coat, epoxy intermediate coat, and urethane appearance coat for all outer surfaces except those to be in contact with concrete. Provide epoxy zinc prime coat for touchup of IOZ. 2.4.1.2. System IV . Provide paint in accordance with DMS -8101 . Provide IOZ prime coat and acrylic latex appearance coat for all outer surfaces except those to be in contact with concrete. Provide epoxy zinc prime coat for touchup of IOZ.
2.4.2 Paint Inside Tub Girders and Closed Boxes. Provide IOZ primer meeting the requirements of DMS -8101
to all interior surfaces, including faying surfaces and splice plates.
2.4.3 Special Protection System . Provide the type of paint system shown on the plans or in conformance with
special p rovisions to this Item. Special Protection Systems must have completed AASHTO Product Evaluation & Audit Solutions Structural Steel Coatings (SSC) testing regimen as a complete system, with full data available from AASHTO, and be approved before use.
2.4.4 Galvanizing . Provide galvanizing , as required, in accordance with Item 445, “Galvanizing.”
2.4.5 Paint over Galvanizing . Paint over galvanized surfaces, when required, in accordance with Item 445.
2.4.6 Field Painting . Provide field paint, as required, in accordance with Item 446, “Field Cleaning and Painting
Steel.” 645 3. CONSTRUCTION
3.1 General Requirements.
3.1.1 Applicable Codes . Perform all fabrication of bridge members in accordance with AASHTO/NSBA Steel
Bridge Collaboration S2.1. Follow all applicable provisions of the appropriate AWS code (D1.5 or D1.1) except as otherwise shown on the plans or in accordance with this Item. Weld sheet steel (thinner than 1/8 in.) in accordance with ANSI/AWS D1.3, Structural Welding Code— Sheet Steel . Unless otherwise stated, requirements of this Item are in addition to the requirements of S2.1 for bridge members. Follow the more stringent requirement in case of a conflict between this Item and S2.1. Perform all bolting in accordance with Item 447. Fabricate railroad underpass structures in accordance with the AREMA Manual for Railway Engineering and this Item. In the case of a conflict between this Item and the AREMA manual, the more stringent requirements apply .
3.1.2 Notice of Fabrication . Give adequate notice before commencing fabrication as specified in Table 1. Include
a schedule for all major fabrication processes and dates when inspections are to occur. Table 1 Notice of Commencing Fabrication Plant Lo cation Notice Requi red In Texas 7 days In the contiguous United States 21 days Outside the contiguous United States 60 days Perform no Department work in the plant before the Engineer authorizes fabrication. The Contractor must bear all costs associated with the Department’s inspection when changes to their fabrication schedules occur and are not adequately conveyed to the Department in accordance with Table 1. When any structural steel is fabricated outside the contiguous 48 states, the additional cost of inspection will be in accordance with Article 6.4., “Sampling, Testing, and Inspection.”
3.1.3 Bridge Members . Primary bridge members include:
web and flanges of plate, tub, and box girders; rolled beams and cover plates; floor beam webs and flanges; arch ribs and arch tie beams or girders; truss members; diaphragm members for curved plate girders or beams; pier diaphragm members for tub girders; splice plates for primary members; and any other member designated as “primary” or “main” on the plans. Secondary bridge members include: bracing (diaphragms, cross frames, and lateral bracing); and all other miscellaneous bridge items not considered primary bridge members .
3.1.4 Responsibility . The Contractor is responsible for the correctness and completeness of shop drawings and
for the fit of shop and field connections. 646 3.1.5. Qualification of Plants and Personnel . 3.1.5.1. Plants . Fabrication plants that produce bridge members must be approved in accordance with DMS- 7370 , “Steel Bridge Member Fabrication Plant Qualification.” The Department’s MPL has a list of approved bridge member fabrication plants. Fabrication plants that produce the following non-bridge steel members must be approved in accordance with DMS -7380 , “Steel Non -Bridge Member Fabrication Plant Qualification” : Item 610, “Roadway Illumination Assemblies,” Item 613, “High Mast Illumination Poles ,” Item 614, “High Mast Illu mination Assemblies ,” Item 650, “Overhead Sign Support s,” Item 654, “Sign Walkways,” Item 686, “Traffic Signal Pole Assemblie s,” and Special Specification, “Intelligent Transportation System (ITS) Pole with Cabinet.” The Materials and Tests Division (MTD) maintains a list of approved non- bridge fabrication plants on the Department MPL that produce these members . Fabrication plants that produce metal bridge rail must be approved in accordance with DMS -7395 , “Metal Railing Fabrication Plant Qualification.” The Department’s MPL has a list of approved metal bridge railing fabrication plants . 3.1.5.2. Personnel . Provide a QC staff qualified in conformance with the applicable AWS code. Provide an adequate number of qualified QC personnel for each specific production operation. QC must be onsite and independent of production personnel, as the Engineer determines. QC personnel must be proficient in using the applicable plans, specifications, and test methods, and in verifying compliance with the plant QC and production procedures. Welding inspectors must be current AWS Certified Welding Inspectors for bridge member plants and for non- bridge member plants requiring Department approval in accordance with DMS -7380 and DMS -7395 . The QC staff must provide inspection of all materials and workmanship before the Department’s inspection. Provide the Department inspector with adequate personnel and equipment needed to move material for inspection access. QC is solely the Contractor’s responsibility . 3.1.5.3. Nondestructive Testing (NDT). Personnel performing NDT must be qualified in conformance with the applicable AWS code and the employer’s Written Practice. Level III personnel who qualify Level I and Level II technicians must be certified by ASNT within the areas in which the NDT Level III is qualified. In addition, NDT technicians must pass hands -on tests administered by MTD . This will remain curr ent provided they continue to perform testing on Department materials as evidenced by test reports requiring their signature. A technician who fails any of the hands -on tests must wait 3 mo. or as approved before retesting. Qualification to perform NDT will be revoked when the technician’s employment is terminated or when the technician does not perform a test on a Department project for 6 consecutive mo . The technician must pass a new hands -on test to be re- certified. Testing of similar weld joints for non- Department projects may be considered by the Engineer instead of re -testing , provided sufficient documentation is submitted with the signature of the project’s Engineer. These requirements also apply to testing agencies and individual third- party contract ors. 3.1.5.4. Welding Procedure Specifications (WPSs) Qualification Testing . For fabricators qualified in accordance with DMS -7370, DMS -7380, or DMS -7395 , laboratories performing procedure qualification testing for WPSs must be accredited by a nationally recognized agency that performs testing in accordance with ISO/International Electrotechnical Commission (IEC) 17025 in the mechanical field of testing.
3.1.6 Drawings .
3.1.6.1. Erection Drawings . Submit erection drawings prepared by a licensed professional engineer, including calculations, for approval in accordance with Item 5, “Control of the Work ,” at least 4 weeks before erecting any portion of field- spliced (welded or bolted) girders, railroad underpasses, trusses, arches, or other 647 members for which erection drawings are required on the plans. Include drawings and calculations for any temporary structures used to support partially erected members. Erection drawings are not required for rolled I-beam units unless otherwise shown on the plans. Prepare erection drawings following the procedures outlined in Section 2.2 of AASHTO/NSBA Steel Bridge Collaboration S10.1. A t minimum, include: plan of work area showing structure location relative to supports and all obstructions; equipment to be used, including allowable load information; erection sequence for all pieces; member weights and center of gravity location of pieces to be lifted; locations of cranes, holding cranes, and temporary supports (falsework), including when to release load from temporary supports and holding cranes; details of falsework , including specific bracing requirements with maximum allowable design wind speed clearly indicated; girder lifting points; diaphragm and bracing requirements; and minimum connection requirements when more than the standard requirements. Perform erection engineering evaluation of the structural adequacy and stability of constructing the bridge system for each step of the steel erection. Do not proceed if site conditions differing from those depicted on the approved erection drawings could affect temporary support stresses, erected girders, or public safety in any manner. Revise erection drawings and resubmit to the Engineer for approval before proceeding. 3.1.6.2. Shop Drawings . Prepare and electronically submit shop drawings before fabrication for each detail of the general plans requiring the use of structural steel, forgings, wrought iron, or castings in accordance with the Bridge Division Guide to Shop Drawing Submittal s available on the D epartment’s website , and as directed for other items the standard specifications require. Indicate joint details on shop drawings for all welds. Provide a title block on each sheet in the lower right corner that includes: project identification data, including federal and state project numbers, sheet numbering for the shop drawings, name of the structure or stream for bridge structures, name of owner or developer, name of the fabricator or supplier, and name of the Contractor. Provide one complete approved 11 × 17- in. set in hardcopy to the Department I nspector at the fabrication plant. Stamp it “For Materials and Tests Division Inspector.” The Engineer may require additional complete hardcopy sets. 3.1.6.2.1. Bridge Members . Prepare drawings in accordance with AASHTO/NSBA Steel Bridge Collaboration G1.3, “Shop Detail Drawing Presentation, ” unless otherwise approved. Print a bill of material on each sheet, including the Charpy V -Notch (CVN) and fracture- critical requirements, if any, for each piece. Indicate fracture- critical areas of members . 3.1.6.2.2. N on-Bridge Members. Furnish shop drawings for non- bridge members when shown on the plans or in conformance with pertinent Items .
3.1.7 Welding Procedure Specifications (WPSs) . Submit WPSs and test reports in conformance with the
applicable AWS code to MTD before fabrication begins and notify the Engineer which procedures will be used for each joint or joint type. Do not begin fabrication until the Engineer approves WPSs. 648 Post the approved WPSs for the welding being performed on each welding machine or use another approved method of ensuring the welder always has access to the procedure information.
3.1.8 Documentation . Provide a completed Material Statement Form 1818 (D -9-USA- 1) with supporting
documentation [such as mill test reports (MTRs) ] that the producing mil l issues and qualified personnel verif y. Ensure the documentation legibly reflects all information the applicable ASTM specifications require. Supply documents electronically to the Department. Provide a copy of the shipping or storage invoice, as material is shipped or placed in approved storage, that reflects: member piece mark identification and calculated weight per piece from the C ontract drawings, number of pieces shipped or in storage, total calculated weight for each invoice per bid item, and the unique identification number of the shipping or storage invoice. The Inspector’s acceptance of material or finished members will not prohibit subsequent rejection if the material or members are found to be damaged or defective. Replace rejected material prom ptly.
3.1.9 Material Identification . Assembly- mark individual pieces and issue cutting instructions to the shop using a
system that will maintain identity of the original piece. Identify structural steel by standard and grade of steel. Also differentiate between material toughness requirements (CVN or fracture -critical) as well as any other special physical requirements. In addition, identify structural steel for primary members by mill identification numbers (heat numbers). Use an approved identification system. Use either paint or low -stress stencils to make identification markings on the metal. Mark the material as soon as it enters the shop and carry the markings on all pieces through final fabrication. Transfer the markings before cutting steel for primary members of bridge structures into smaller pieces. Loss of identification marking on any piece, with no other positive identification, or loss of heat number identification on any primary member piece will render the piece unacceptable for use. Unidentifiable material may be approved for use after testing to establish acceptability to the satisfaction of the Engineer. Have an approved testing facility perform testing and a licensed professional engineer sign and seal the results. Low-stress stencil marks must have a radius instead of a sharp point. Acceptable stencils include dot, vibration, and rounded- V stencils. Label these stencils so that they are easily distinguishable from other stencils that are not low -stress.
3.2 Welding .
3.2.1 Details.
3.2.1.1. Rolled Edges . Trim plates with rolled edges used for webs by thermal cutting. 3.2.1.2. Weld Tabs . Use weld tabs at least 2 in. long for manual and semi -automatic processes, at least 3 in. long for automatic processes, and in all cases at least as long as the thickness of the material being welded. Use longer weld tabs as required for satisfactory wor k. Duplicate the configuration of the weld tab to the joint detail being fabricated. 3.2.1.3. Weld Termination . Terminate fillet welds approximately 1/4 in. from the end of the attachment except for galvanized structures and flange- to-web welds, for which the fill et weld must run the full length of the attachment, unless otherwise shown on the plans. 3.2.1.4. No-Paint Areas at Field -Welded Connections . Keep surfaces within 4 in. of groove welds or within 2 in. of fillet welds free of shop paint. 3.2.1.5. Galvanized Assemblies. Compl etely seal all edges of tightly contacting surfaces by welding before galvanizing. 649 3.2.1.6. Submerged- Arc Welding (SAW) . Do not use hand- held semiautomatic SAW for welding bridge members unless altered to provide automatic guidance or otherwise approved. 3.2.1.7. Non-Bridge Member Weathering Steel Welds. Provide weld metal with atmospheric corrosion resistance and coloring characteristics similar to that of the base metal for weathering steel structures fabricated in accordance with AWS D1.1 .
3.2.2 Shop Splices .
3.2.2.1. Shop Splice Locati ons. Keep at least 6 in. between shop splices and stiffeners or cross -frames. Obtain approval for shop splices added after shop drawings are approved. 3.2.2.2. Grinding Splice Welds . Grind shop groove welds in flange plates smooth and flush with the base metal on all surfaces , whether the joined parts are of equal or unequal thickness. Grind so the finished grinding marks run in the direction of stress and keep the metal below the blue brittle range (below 350°F). Groove welds in web plates, except at locations of i ntersecting welds, need not be ground unless shown on the plans except as required to meet AWS welding code requirements.
3.2.3 Joint Restraint . Never restrain a joint on both sides when welding.
3.2.4 Stiffener Installation.
3.2.4.1. Flange Tilt . Members must meet combined ti lt and warpage tolerances before the installation of stiffeners. Cut stiffeners to fit acceptable flange tilt and cupping. Minor jacking that does not deform the material will be permitted. 3.2.4.2. Stiffeners Near Field Splices. Tack weld intermediate stiffeners w ithin 12 in. of a welded field splice point in the shop. Weld the stiffeners in the field in accordance with Item 448, “Structural Field Welding,” after the splice is made.
3.2.5 Nondestructive Testing (NDT) . Perform magnetic particle testing (MT), radiographic testing (RT), or
ultrasonic testing (UT) at the Contractor’s expense in accordance with AWS code D1.5 for bridge structures. The Engineer will periodically witness, examine, verify, and interpret NDT. Additional welds may be designated for NDT on the plans . Retest repaired groove welds in conformance with the applicable AWS code after repairs are made and have cooled to ambient temperature. Complete NDT and repairs before assembly of parts into a member, but after any heat -correction of weld distortion. 3.2.5.1. Radiographic Testing (RT). Radiographs must have a density of at least 2.5 and no more than 3.5, as confirmed by a radiographer. The density in any single radiograph showing a continuous area of constant thickness must not vary in this area by more than 0.5. Use only ASTM System Class I radiographic film in accordance with ASTM E1815. Use low -stress stencils to make radiograph location identification marks on the steel. 3.2.5.2. Ultrasonic Testing (UT). Have UT equipment calibrated yearly by an authorized representativ e of the equipment manufacturer or by an approved testing laboratory. 3.2.5.3. Magnetic Particle Testing (MT). Use alternating current (AC) when using the yoke method unless otherwise approved. Welds may be further evaluated using half -wave rectified direct current (DC) for subsurface indications. Centerline cracking may be detected by aluminum prod method when approved.
3.3 Bolt Holes . Detail holes on shop drawings 1/16 in. larger in diameter than the nominal bolt size shown on
the plans , unless another hole size is shown on the plans. Thoroughly clean the contact surfaces of connection parts in accordance with Item 447 before assembling them for hole fabrication. Make holes in primary members full -size (by reaming from a subsize hole, drilling full-size, or punching full -size where permissible) only in assembly unless otherwise approved. 650 Ream and drill with twist drills guided by mechanical means unless otherwise approved. If subpunching holes, punch them at least 3/16 in. smaller than the nominal bolt size. Submit the proposed procedures for approval to accomplish the work from initial drilling or punching through check assembly when numerically controlled (N/C) equipment is used. Use thermal cutting for holes only with permission. Permission for thermal cutt ing is not required for making slotted holes, when slotted holes are shown on the plans, by drilling or punching two holes and then thermally cutting the straight portion between them. Perform all thermal cutting in accordance with Section 441.3.5.1., “Thermal Cutting.” Slightly conical holes that naturally result from punching operations are acceptable provided they do not exceed the tolerances of AASHTO/NSBA Steel Bridge Collaboration S2.1. The tolerance for anchor bolt hole diameter for bridge bearing as semblies is +1/8 in., -0.
3.4 Dimensional Tolerances. Meet tolerances in conformance with the applicable AWS specifications except as modified in this Section.
3.4.1 Rolled Sections . Use ASTM A6 mill tolerances for rolled sections, except AWS D1.5 camber tolerances
apply to rolled sections with a specified camber.
3.4.2 Flange Straightness. Ensure flanges of completed girders are free of kinks, short bends, and waviness that
depart from st raightness or the specified camber by more than 1/8 in. in any 10 ft. along the flange. Rolled material must meet this straightness requirement before being laid out or worked. Plates must meet this requirement before assembly into a member. Inspect the surface of the metal for evidence of fracture after straightening a bend or buckle. The Engineer may require NDT .
3.4.3 Alignment of Deep Webs in Welded Field Connections . For girders 48 in. deep or deeper, the webs may
be slightly restrained while checking compli ance for lateral alignment at field- welded connections. In the unrestrained condition, webs 48 in. deep or deeper must meet the tolerances shown in Table 2. Girders under 48 in. deep must meet the alignment tolerances in accordance with AWS D1.5 . Table 2 Web Alignment Tolerances for Deep Girders Web Depth (in.) Maximum Web Misalignment (in.) 48 1/16 60 1/8 72 1/4 84 5/16 96 5/16 108 3/8 120 7/16 132 7/16 144 1/2
3.4.4 Bearings. Correct bearing areas of shoes, beams, and girders using heat, external pressure, or both. Grind
or mill only if the actual thickness of the member is not reduced by more than 1/16 in. below the required thickness. 3.4.4.1. I-Beams, Plate Girders, and Tub Girders. The plane of the bearing area of beams and girders must be perpendicular to the vertical axis of the member within 1/16 in. in any 24 in. 3.4.4.2. Closed Box Girders. Meet these tolerances . The plane of the bearing areas of the box girder is perpendicular to the vertical axis of the girder within 1/16 in. across any horizontal dimension of the bearing. The planes of the beam supports on the box girder are true to the vertical axis of the supported beams or girders to 1/16 in. in any 24 in. In the shop, verify the plane of all bearing areas with the box placed on its bearings to field grade, using an approved process for verification. 651 3.4.4.3. Shoes . Meet these tolerances . The top bolster has the center 75% of the long dimension (transverse to the girder) true to 1/32 in., with the remainder true to 1/16 in., and is true to 1/32 in. acros s its entire width in the short dimension (longitudinal to the girder). The bottom bolster is true to 1/16 in. across its diagonals. For a pin- and-rocker type expansion shoe, the axis of rotation coincides with the central axis of the pin. When the shoe is completely assembled, as the top bolster travels through its full anticipated range, no point in the top bolster plane changes elevation by more than 1/16 in. and the top bolster does not change inclination by more than 1 °, for the full possible travel. 3.4.4.4. Beam Supports . Fabricate beam support planes true to the box girder bearing to 1/16 in. in the short direction and true to the vertical axis of the nesting girders to 1/16 in.
3.4.5 End Connection Angles . For floor beams and girders with end connection angles, the tolerance for the
length back -to-back of connection angles is ±1/32 in. Do not reduce the finished thickness of the angles below that shown on the shop drawings if end connections are faced.
3.5 Other Fabrication Processes.
3.5.1 Thermal Cutting. Use a mechanical guide to obtain a true profile. Hand- cut only where approved. Hand-
cutting of radii for beam copes, weld access holes, and width transitions is permitted if acceptable profile and finish are produced by grinding. Provide a surface finish on thermal -cut surfaces, including holes, in accordance with AWS D1.5 requirements for base metal preparation. Obtain approval before using other cutting processes.
3.5.2 Oxygen -Gouging. Do not oxygen- gouge quenched and tempered (Q&T), normalized, or
thermo- mechanically controlled processed (TMCP) steel.
3.5.3 Annealing and Normalizing. Complete all annealing or normalizing (as defined in ASTM A941) before
finished machining, boring, and straightening. Maintain the temperature uniformly throughout the furnace during heating and cooling so the range of temperatures at all points on the member is no more than 100°F.
3.5.4 Machining. Machine the surfaces of expansion bearings so the travel direction of the tool is in the direction of expansion.
3.5.5 Camber . Complete cambering in accordance with AASHTO/NSBA Steel Bridge Collaboration S2.1 before
any heat -curving.
3.5.6 Heat Curving . Heat -curve in accordance with AASHTO/NSBA Steel Bridge Collaboration S2.1. The methods
in the AASHTO bridge construction specifications are recommended. Attach cover plates to rolled beams before heat -curving only if the total thickness of one flange and cover plate is less than 2- 1/2 in. and the radius of curvature is greater than 1,000 ft. Attach cover plates for other rolled beams only after heat -curving is completed. Locate and attach connection plates, diaphragm stiffeners, and bearing stiffeners after curving, unless girder shrinkage is accounted for.
3.5.7 Bending of Quenched and Tempered (Q&T) Steels. The cold- bending radius limitations for HPS 70W in
AASHTO/ NSBA Steel Bridge Collaboration S2.1 apply to all Q&T steels.
3.5.8 Hammering . Do not perform hammering on any portion of the member that causes the material to
permanently deform. Avoid damage to the material by measures such as use of brass or aluminum hammers or by padding the area to be hammered.
3.6 Nonconformance Reports (NCRs) . Submit an NCR to the Engineer for approval when the requirements of
this Item are not met. Submit NCRs in conformance with MTD ’s NCR guidelines document. Have readily available access t o the services of a licensed professional engineer experienced in steel structures design 652 and fabrication. This licensed professional engineer may be responsible for reviewing potentially structurally deficient members in conformance with the NCR guidelines document. Receive Department approval before beginning repairs. Perform all repair work in strict compliance with the approved NCR and repair procedure.
3.7 Shop Assembly .
3.7.1 General Shop Assembly. Shop- assemble field connections of primary members of trusses, arches,
continuous beam spans, bents, towers (each face), plate girders, field connections of floor beams and stringers (including for railroad structures), field- bolted diaphragms for curved plate girders and railroad underpasses, and rigid frames. Field -bolted cross -frames and rolled- section diaphragms do not require shop assembly. Complete fabrication, welding (except for shear studs), and field splice preparation before members are removed from shop assembly. Obtain approval for any deviation from this procedure. The Contractor is responsible for accurate geometry. Use a method and details of preassembly consistent with the erection procedure shown on the erection plans and camber diagrams. The sequence of assembly may start from any location in the structure and proceed in one or both directions. An approved method of sequential geometry control is required unless the full length of the structure is assembled. Verify by shop assembly the fit of all bolted and welded field connections between bent cap girders and plate girders or between plate girders and floor beams. Do not measure horizontal curvature and vertical camber for final acceptance until all welding and heating operations are completed and the steel has cooled to a uniform temperature. Check horizontal curvature and vertical camber in a no- load condition.
3.7.2 Bolted Field Connections . Each shop assembly, including camber, alignment, accuracy of holes, and fit of
milled joints, must be approved before the assembly is dismantled. Assemble with milled ends of compression members in full bearing. Assemble non- bearing connections to the specified gap. Ream all subsize holes to the specified size while the connections are assembled, or drill full size while the connections are assembled. Notify the Engineer before shipping if fill plates or shims are added. Adding or increasing the thickness of shims or fill plates in bearing connections requires approval. Use drift pins and snug- tight bolts during the drilling process to ensure all planes of the connection (webs and flanges) can be assembled simultaneously. Do not use tack welds to secure plates while drilling. Secure parts not completely bolted in the shop with temporary bolts to prevent damage in shipment and handling. Never use tack welds in place of temporary bolts. Match- mark connecting parts in field connections using low -stress stencils in conformance with the diagram on the erection drawings.
3.7.3 Welded Field Connections . Mill or grind bevels for groove welds. Do not cut into the web when cutting the
flange bevel adjacent to the web. End preparation, backing, and tolerances for girder splices must be in accordance with Item 448. Details for all other field welds must conform to the applicable AWS code unless otherwise shown on the plans. In the shop, prepare ends of beams or girders to be field- welded taking into account their relative positions in the finished structure due to grade, camber, and curvature. Completely shop- assemble and check each splice. Match- mark the splice while it is assembled with low -stress stencils in conformance with the diagram on the erection drawings.
3.8 Finish and Painting.
3.8.1 Shop Painting. Perform shop painting of bridge members in accordance with DMS -8104
, “Paint, Shop Application for Steel Bridge Members.” Grind corners on new steel items to be painted that are sharp or form 653 essentially 90° angles to an approximately 1/16-in. flat surface before blast cleaning. (A corner is the intersection of two plane faces.) This requirement does not apply to punched or drilled holes. Do not omit shop paint to preserve original markings. Ensure painted faying surfaces meet the required slip and creep coefficients for bolted connections in accordance with DMS -8104 . Use a Class A slip (minimum slip coefficient of 0.33) if no slip coefficient or corresponding surface condition is specified . Perform a ll required testing at no expense to the Department. Surface preparation and painting the interiors of t ub girders and closed boxes must be in accordance with DMS -8104 . Measure the anchor profile after blast cleaning at random locations along the thermal cut surfaces. If specified anchor profile is not achieved over the entire flame- cut surface, grind the edges and re- blast to achiev e the required anchor pattern.
3.8.2 Weathering Steel . Provide an SSPC -SP 6 , “Commercial Blast Cleaning,” blast in the shop to all fascia
surfaces of unpainted weathering steel beams. Fascia surfaces include: exterior sides of outermost webs and undersides of bottom flanges of plate girders and rolled beams, all outer surfaces of tub girders and box girders, all surfaces of truss members, webs and undersides of bottom flanges of plate diaphragms, bottom surfaces of floor beams, and any other surfaces designated as “fascia” on the plans. Do not mark fascia surfaces. Use one of the following methods as soon as possible to remove any markings or any other foreign material that adheres to the steel during fabrication and could inhibit the formation of oxide film: SSPC -SP 1, “Solvent Cleaning,” SSPC -SP 2, “Hand Tool Cleaning ,” SSPC -SP 3, “Power Tool Cleaning,” and SSPC -SP 7, “Brush-Off Blast Cleaning.” Do not use acids to remove stains or scales. Feather out touched- up areas over several feet.
3.8.3 Machined S urfaces. Clean and coat machine- finished surfaces that are in sliding contact, particularly pins
and pinholes, using a non- drying, water -repellent , grease- type material containing rust -inhibitive compounds. Ensure the coating material contains no ingredients that might damage the steel. Protect machined surfaces from abrasive blasting.
3.9 Handling and Storage of Materials . Prevent damage when storing or handling girders or other materials.
Remove or repair material damaged by handling devices or improper storage by acceptable means in accordance with ASTM A6 and the applicable AWS code. Place stored materials on skids or acceptable dunnage above the ground. Keep materials clean and avoid damaging the applied coating. Shore girders and beams to keep them upright and free of standing water. Place support skids close enough to prevent excessive deflection in long members such as columns. Do not stack completed girders or beams at the jobsite. Protect structural steel from salt water or other corrosive environments during storage and transit.
3.10 Marking and Shipping. Mark all structural members in conformance with the erection drawings. If a surface
is painted, make the marks over the paint. Do not use impact -applied stencils to mark painted surfaces. 654 Mark the weight di rectly on all members weighing more than 3 tons. Keep material clean and free of damage during loading, transportation, unloading, and storage. Pack bolts of each length and diameter, and loose nuts or washers of each size, separately , and ship them in boxes, crates, kegs, or barrels. Plainly mark a list and description of the contents on the outside of each package.
3.11 Field Erection . Do not lift and place any steel member, including girders and diaphragms, over an open
highway or other open travel way unless otherwise approved. Do not allow traffic to travel under erected members until sufficiently stable as shown on approved erection drawings.
3.11.1 Pre-Erection Conference . Schedule and attend a pre- erection conference with the Engineer at lea st 7 days
before commencing steel erection operations. Do not install falsework or perform any erection operations before the meeting.
3.11.2 Methods and Equipment . Do not tack -weld parts instead of using erection bolts. Do not tack -weld parts to
hold them in place for bolting. Provide falsework, tools, machinery, and appliances, including drift pins and erection bolts. Provide enough drift pins, 1/32 in. larger than the connection bolts, to fill at least 1/4 of the bolt holes for primary connections. Use erection bolts of the same diameter as the connection bolts. Securely tie, brace, or shore steel beams or girders immediately after erection as shown on the erection drawings. Maintain bracing or shoring until the diaphragms are in place and as specified o n the er ection drawings. Protect railroad, roadway, and marine traffic underneath previously erected girders or beams from falling objects associated with other construction activities. Only welders certified or working directly under the supervision of a foreman certified in accordance with Item 448 may handle torches when applying heat to permanent structural steel members.
3.11.3 Falsework. Construct falsework in conformance with the erection plan. Construct foundations for shore
towers as shown on erection drawings. D o not use timber mats with deteriorated timbers or soil to construct shore tower foundations. Notify the Engineer of completed falsework to obtain approval before opening roadway to traffic or starting girder erection activities. Ensure falsework is protec ted from potential vehicle impact. Inspect and maintain falsework daily. Use screw jacks or other approved methods to control vertical adjustment of falsework to minimize the use of shims.
3.11.4 Handling and Assembly . Accurately assemble all parts as shown on the plans and the approved shop
drawings. Verify match- marks. Handle parts carefully to prevent bending or other damage. Do not hammer if doing so damages or distorts members. Do not weld any member for transportation or erection unless shown on the plans or approved. 3.11.4.1. Welded Connections . Weld flange splices to 50% of their thickness and meet the minimum erection bracing and support requirements before releasing the erection cranes, as shown on the plans and on the approved erection plans. Field- weld in accordance with Item 448. 3.11.4.2. Bolted Connections . Before releasing the erection cranes: install 50% of the bolts in the top and bottom flanges and the web with all nuts finger -tight, meet the minimum erection bracing and support requirements shown on the plans and on the approved erection plans, and install top lateral bracing across the connection for tub girders, and fully tension the bolts connecting the bracing to the top flanges. Install high- strength bolts, including erection bolts, in accordance with Item 447. Clean bearing and faying surfaces for bolted connections in accordance with Item 447. Clean the areas of the outside ply under washers, nuts, and bolt heads before bolt installation. Ensure the required faying surface condition is present at the tim e of bolting. 655 3.11.5. Misfits . Correct minor misfits. Ream no more than 10% of the holes in a plate connection (flange or web), and ensure no single hole is more than 1/8 in. larger than the nominal bolt diameter. Submit proposed correction methods for members with defects that exceed these limits or prevent the proper assembly of parts. Straighten structural members in accordance with AASHTO/NSBA Steel Bridge Collaboration S2.1. Make all corrections in the presence of the Engineer at no expense to the Department. Do not remove and reweld gusset plates without approval.
3.11.6 Bearing and Anchorage Devices. Place all bearing devices such as elastomeric pads, castings, bearing
plates, or shoes on properly finished bearing areas with full and even bearing on the concrete. Pl ace metallic bearing devices on 1/4 -in. thick preformed fabric pads manufactured in accordance with DMS -6160 , “Water Stops, Nylon-R einforced Neoprene Sheet, and Elastomeric Pads,” to the dimensions shown on the plans. Provide holes in the pad that are no more than 1/4 in. larger than the bolt diameter. Build the concrete bearing area up to the correct elevation once it has been placed below grade using mortar that meets Item 420, “Concrete Substructures,” and provide adequate curing. Use only mortar for buildups between 1/8 in. and 3/8 in. thick. Use galvanized steel shims or other approved shim materials in conjunction with mortar if the bearing area must be raised more than 3/8 in. Provide at least 75% contact of flange to shoe with no separation greater than 1/32 in. for beams and girders. Make corrections using heat or pressure in accordance with AASHTO/NSBA Steel Bridge Collaborati on S2.1 or using galvanized shims. Correct small irregularities by grinding. Provide at least 85% contact between the rocker plate and the base plate. Adjust the location of slotted holes in expansion bearings for the prevailing temperature. Adjust the nuts on the anchor bolts at the expansion ends of spans to permit free movement of the span. Provide lock nuts or burr the threads. Remove all foreign matter from sliding or machine- finished surfaces before placing them in the structure. Restore distorted bearing pads or expansion bearings to an equivalent 70°F position after completion of all welded or bolted splices, using an approved method of relieving the load on the bearing devices.
3.11.7 Erecting Forms . Do not erect forms until all welding or bolting is complete and the unit is positioned and
properly set on the bearings , unless otherwise shown on the plans.
3.11.8 Field Finish . Paint in accordance with Item 446. Restore weathering steel that will remain unpainted to a
uniform appearance by solvent cleaning, hand cleaning, power brush, or blast cleaning after all welding and slab concrete placement have been completed. Remove from all unpainted weathering steel fascia surfaces (as listed in Section 441.3.8.2., “Weathering Steel”) any foreign material, including markings, that adheres to the steel and could inhibit formation of oxide film as soon as possible. Feather out touched- up areas over several feet. Do not use acids to remove stains or scales.
Article 4 — Measurement and Payment
The work performed, materials furnished, equipment, labor, tools, and incidentals will not be measured or paid for directly , but will be subsidiary to pertinent Items.