1.2 Related Sections
A.Section 02701: Pavement Smoothness
B.Section 02742S: Project Specific Surfacing Requirements
C.Section 02745: Asphalt Material
D.Section 02746: Hydrated Lime
E.Section 02748: Prime Coat/Tack Coat
1.3 References
A.AASHTO M 325: Stone Matrix Asphalt (SMA)
B.AASHTO R 46: Designing Stone Matrix Asphalt (SMA)
C.AASHTO R 67: Sampling Asphalt Mixtures after Compaction (Obtaining Cores)
D.AASHTO T 11: Materials Finer Than 75 μm (No. 200) Sieve in Mineral Aggregates by Washing
E.AASHTO T 19: Bulk Density (“Unit Weight”) and Voids in Aggregate
F.AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates
G.AASTHO T 85: Specific Gravity and Absorption of Coarse Aggregate
H.AASHTO T 89: Determining the Liquid Limit of Soils
I.AASHTO T 90: Determining the Plastic Limit and Plasticity Index of Soils
J.AASHTO T 96: Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact of the Los Angeles Machine
K.AASHTO T 104: Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate
L.AASHTO T 112: Clay Lumps and Friable Particles in Aggregate
M.AASHTO T 166: Bulk Specific Gravity (Gmb) of Compacted Asphalt Mixtures Using Saturated-Surface Dry Specimens
N.AASHTO T 176: Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test
O.AASHTO T 195: Determining Degree of Particle Coating of Asphalt Mixtures
P.AASHTO T 209: Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures
Q.AASHTO T 255: Total Evaporable Moisture Content of Aggregate by Drying
R.AASHTO T 278: Surface Frictional Properties Using the British Pendulum Tester
S.AAHTO T 279: Accelerated Polishing of Aggregates Using the British Wheel
T.AASHTO T 304: Uncompacted Void Content of Fine Aggregate
U.AASHTO T 305: Determination of Draindown Characteristics in Uncompacted Asphalt Mixtures
V.AASHTO T 335: Determining the Percentage of Fracture in Coarse Aggregate
W.ASTM C 612: Standard Specification for Mineral Fiber Block and Board Thermal Insulation
X.UDOT Materials Manual of Instruction.
Y.UDOT Minimum Sampling and Testing Requirements
Z.UDOT Quality Management Plans
1.5 Submittals
A.Mix design for approval at least 10 working days before paving according to the UDOT Materials Manual of Instruction 962.
B.Changes in job mix design
1.Submit a written request for a proposed change in the job-mix gradation.
a.Allow at least 12 hours for approval before incorporating a minor target change into production.
b.Allow at least six working days for verification and approval of any other change.
2.Include documentation supporting correlation between suggested target changes and mix design volumetric requirements.
a.Department acceptance test results or Contractor QC test data or both are acceptable.
3.Submit samples according to the UDOT Materials Manual of Instruction 962 for a volumetric mix design verification for anything other than approved minor target change.
a.This includes changes in the aggregate source, asphalt binder source, or asphalt binder grade.
C.Corrective action plan according to this Section, Article 3.3.
D.Refer to this Section, Article 1.7 for laboratory correlation submittals.
E.Mat joint layout plan to the Engineer for review at least 10 calendar days before placement.
1.6 Acceptance
A.Acceptance sampling and testing of material is according to UDOT Minimum Sampling and Testing Requirements.
B.Gradation and asphalt binder content
1.The Engineer evaluates a lot on the test results of four samples with the following exceptions:
a.Compute incentive/disincentive using the test results from three samples if only three samples can be taken for the production day.
b.Combine test results with the next day of production if at least three random samples cannot be taken. Take one sample for each 500 tons, or portion thereof, from the following day’s production.
c.Add the lot to the previous day’s production for the final day’s production if three random samples cannot be taken.
d.The lot may be increased to include up to three production days when agreed upon in advance by both the Contractor and the Engineer when less than 900 tons are anticipated per production day.
2.Evaluate the lot using the number of tests “n” in Table 3.
3.The Engineer informs the Contractor of the time and place of sampling not more than 15 minutes before sampling.
4.Increase sample sizes to accommodate paired-T testing as required.
C.Density and Thickness
1.Obtain cores within two contract days after the pavement is placed. Refer to AASHTO R 67.
a.The Engineer marks coring location for in-place density.
b.Move transversely to a point 1 ft from the edge of the pavement for in-place density if the random location for coring falls within 1 ft of the edge of the overall pavement section (outer part of shoulders).
c.Fill core holes with SMA mix and compact.
d.The Department witnesses the coring operation, takes possession of the cores immediately, and begins testing the cores within 24 hours for density acceptance.
2.Density Requirements
a.The target for in-place density is 94.0 percent of Theoretical Maximum Specific Gravity
b.Use the average of the Theoretical Maximum Specific Gravity tests for each lot.
3.Thickness Requirements
a.The Department accepts a lot for thickness when: 1) The average thickness is not more than ½ inch greater or ¼ inch less than the total design thickness specified. 2) No individual sublot shows a deficient thickness of more than ⅜ inch.
b.Excess Thickness – The Engineer may allow excess thickness to remain in place or may order its removal. 1) The Department pays for 50 percent of the mix for material in excess of the +½ inch tolerance when excess thickness is allowed to remain in place. 2) Remove and replace the entire depth of the course if it is necessary to remove portions of the course.
c.Deficient Thickness – Place additional material where lots or sublots are deficient in thickness. 1) The Department pays for material necessary to reach specified thickness. 2) The Department pays for 50 percent of the mix for additional material over specified thickness necessary to achieve minimum lift thickness. 3) Minimum compacted lift is 3 times the nominal maximum aggregate size.
d.Thickness tolerances established above do not apply to leveling courses. 1) Check final surfaces in stage construction.
e.Thickness acceptance for thin overlay pavement consists of checking thickness regularly with a depth probe during placement and taking corrective action as necessary.
D.The Department applies incentive/disincentive for Gradation/Asphalt Content, and In-Place Density. The Engineer computes Incentive/Disincentive for each lot.
1.Compute incentive/disincentive for Gradation/Asphalt Binder and In-place Density according to Table 1.
2.Base the incentive/disincentive on Percent within Limit (PT) computation using Tables 2, 3, and 4.
3.Use lowest single value combined for gradation (each of the sieves) and asphalt binder content for calculating the gradation/asphalt binder content incentive/disincentive.
4.Use Tables 2, 3, and 4 to determine PT for in-place density.
5.Meet PT of 88 or greater for in-place density or the Department does not pay incentives on gradation/asphalt binder content.
6.Meet control requirements of Table 2 for VMA and VCA.
a.VCAMIX is less than VCADRC or the Department does not pay incentive for gradation/asphalt binder content.
7.The following work is not eligible for incentive:
a.Items such as utility work, traffic signals, detours, lane leveling, and driveways.
b.Small projects with plan quantities of Asphalt Mix less than 500 tons.
E.The Department applies incentive/disincentive for smoothness according to Section 02701.
1.Refer to Section 02701 for smoothness requirements.
F.The Department rejects lots:
1.If the PT for any individual gradation measurement listed in Table 3 is less than 60 percent.
2.If the PT for asphalt binder content or density is less than 52 percent.
3.The Engineer may accept a reject lot. Refer to Section 01456.
a.A price reduction of 35 percent of the pay item or $30 per ton, whichever is greater, will be assessed.
b.The lot will not be eligible for any incentive.
G.The Engineer may elect to accept material on visual inspection for work such as utility work, traffic signals, detours, lane leveling, and driveways, other hand work, or small projects with plan quantities less than 500 tons.
1.Lots accepted on visual inspection are not eligible for Incentive/Disincentive.
2.The Engineer reserves the option of conducting acceptance tests necessary to determine the material and workmanship meets the project requirements.
3.Acceptance for density may be based on establishing and maintaining a roller pattern to obtain maximum density without over-stressing the pavement. Table 1 Incentive/Disincentive for Asphalt Binder Content, and Density PT Based on Min. Four Samples Incentive/Disincentive (Dollars/Ton) >99 2.50 96-99 2.00 92-95 1.25 88-91 0.00 84-87 -0.26 80-83 -0.60 76-79 -0.93 72-75 -1.27 68-71 -1.60 64-67 -1.93 60-63 -2.27 <60 Reject Incentive/Disincentive for Gradation PT Based on Min. Four Samples Incentive/Disincentive (Dollars/Ton) >99 2.50 96-99 2.00 92-95 1.25 88-91 0.00 84-87 -0.26 80-83 -0.60 76-79 -0.93 72-75 -1.27 68-71 -1.60 64-67 -1.93 60-63 -2.27 56-59 -5.00 52-55 -10.00 <52 Reject Table 2 Production Control for VMA and VCAMIX VMA VCAMIX Action Average Value, x, (%) Job-Mix Design Minimum of three Samples X ≥ 16.5 and X ≤18.5 VCAMIX < VCADRC Continue Paving X < 16.5 or X >18.5 0 < VCAMIX - VCADRC ≤ 0.5% Stop Production until a corrective action plan is approved X < 15.5 or X >19.5 0.5 < VCAMIX - VCADRC Stop Production and resubmit Mix Design Table 3 Upper and Lower Limit Determination Parameter UL and LL /8” sieve for ½” SMA Target Value ± 5.0% #4 sieve Target Value ± 4.0% # 8 sieve Target Value ± 3.0% # 50 sieve Target Value ± 3.0% # 200 sieve Target Value ± 2.0% Asphalt Binder Content Target Value ± 0.35% Density Lower Limit: Target Value - 2.0% Upper Limit: Target Value + 3.5% Enter table in the appropriate sample size column and round down to the nearest value. Table 4 Quality Index Values (QU or QL) for Estimating Percent Within Limits PU or n=3 n=4 n=5 n=6 n=7 n=8 n=10 n=12 n=15 n=20 PL 100 1.16 1.50 1.75 1.91 2.06 2.15 2.29 2.35 2.47 2.56 99 1.16 1.47 1.68 1.79 1.89 1.95 2.04 2.09 2.14 2.19 98 1.15 1.44 1.61 1.70 1.77 1.80 1.86 1.89 1.93 1.97 97 1.15 1.41 1.55 1.62 1.67 1.69 1.74 1.77 1.80 1.82 96 1.15 1.38 1.49 1.55 1.59 1.61 1.64 1.66 1.69 1.70 95 1.14 1.35 1.45 1.49 1.52 1.54 1.56 1.57 1.59 1.61 94 1.13 1.32 1.40 1.44 1.46 1.47 1.49 1.50 1.51 1.53 93 1.12 1.29 1.36 1.38 1.40 1.41 1.43 1.43 1.44 1.46 92 1.11 1.26 1.31 1.33 1.35 1.36 1.37 1.37 1.38 1.39 91 1.10 1.23 1.27 1.29 1.30 1.31 1.32 1.32 1.32 1.33 90 1.09 1.20 1.23 1.24 1.25 1.25 1.26 1.26 1.27 1.27 89 1.08 1.17 1.20 1.21 1.21 1.21 1.21 1.21 1.22 1.22 88 1.07 1.14 1.16 1.17 1.17 1.17 1.17 1.17 1.17 1.17 87 1.06 1.11 1.12. 1.12 1.12 1.13 1.13 1.13 1.13 1.13 86 1.05 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 1.08 85 1.03 1.05 1.05 1.05 1.05 1.04 1.04 1.04 1.04 1.04 84 1.02 1.02 1.02 1.01 1.01 1.01 1.00 1.00 1.00 1.00 83 1.00 0.99 0.98 0.97 0.97 0.96 0.96 0.96 0.96 0.96 82 0.98 0.96 0.95 0.94 0.94 0.93 0.93 0.92 0.92 0.92 81 0.96 0.93 0.92 0.91 0.90 0.90 0.89 0.89 0.89 0.88 80 0.94 0.90 0.88 0.87 0.86 0.86 0.85 0.85 0.85 0.85 79 0.92 0.87 0.85 0.84 0.83 0.83 0.82 0.82 0.82 0.81 78 0.89 0.84 0.82 0.81 0.80 0.79 0.79 0.78 0.78 0.78 77 0.87 0.81 0.79 .0.78 0.77 0.76 0.76 0.75 0.75 0.75 76 0.84 0.78 0.76 0.75 0.74 0.73 0.72 0.72 0.72 0.72 75 0.82 0.75 0.73 0.72 0.71 0.70 0.69 0.69 0.69 0.68 74 0.79 0.72 0.70 0.68 0.67 0.67 0.66 0.66 0.66 0.65 73 0.77 0.69 0.67 0.65 0.64 0.64 0.62 0.62 0.62 0.62 72 0.74 0.66 0.64 0.62 0.61 0.61 0.60 0.59 0.59 0.59 71 0.71 0.63 0.60 0.59 0.58 0.58 0.57 0.56 0.56 0.56 70 0.68 0.60 0.58 0.56 0.55 0.55 0.54 0.54 0.54 0.53 69 0.65 0.57 0.55 0.54 0.53 0.52 0.51 0.51 0.51 0.50 68 0.62 0.54 0.52 0.51 0.50 0.50 0.48 0.48 0.48 0.48 67 0.59 0.51 0.49 0.48 0.47 0.47 0.46 0.45 0.45 0.45 66 0.56 0.48 0.46 0.45 0.44 0.44 0.43 0.42 0.42 0.42 65 0.53 0.45 0.43 0.42 0.41 0.41 0.40 0.40 0.40 0.39 64 0.49 0.42 0.40 0.39 0.38 0.38 0.37 0.37 0.37 0.37 63 0.46 0.39 0.37 0.36 0.35 0.35 0.35 0.34 0.34 0.34 62 0.43 0.36 0.34 0.33 0.33 0.33 0.32 0.31 0.31 0.31 61 0.39 0.33 0.31 0.30 0.30 0.30 0.29 0.29 0.29 0.28 60 0.36 0.30 0.28 0.27 0.26 0.26 0.25 0.25 0.25 0.25 59 0.32 0.27 0.25 0.25 0.24 0.24 0.24 0.23 0.23 0.23 Table 4 Continued PU/PL n=3 n=4 n=5 n=6 n=7 n=8 n=10 n=12 n=15 n=20 58 0.29 0.24 0.23 0.22 0.21 0.21 0.21 0.21 0.21 0.20 57 0.25 0.21 0.20 0.19 0.19 0.19 0.18 0.18 0.18 0.18 56 0.22 0.18 0.17 0.16 0.16 0.16 0.16 0.16 0.15 0.15 55 0.18 0.15 0.14 0.14 0.13 0.13 0.13 0.13 0.13 0.13 54 0.14 0.12 0.11 0.11 0.11 0.11 0.10 0.10 0.10 0.10 53 0.11 0.09 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 52 0.07 0.06 0.06 0.05 0.05 0.05 0.05 0.05 0.05 0.05 51 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Table 5 Definitions, Abbreviations, and Formulas for Acceptance Term Explanation Target Value (TV) The target values for gradation and asphalt binder content are given in the CONTRACTOR’s mix design. The target value for density is 94.0 percent of maximum (Rice) density. Average (AVE) The sum of the lot’s test results for a measured characteristic divided by the number of test results, the arithmetic mean. Standard Deviation (s) The square root of the value formed by summing the squared difference between the individual test results of a measured characteristic and AVE, divided by the number of test results minus one. This statement does not limit the methods of calculations of s; other methods that obtain the same value may be used. Upper Limit (UL) The value above the TV of each measured characteristic that defines the upper limit of acceptable production. (Table 3) Lower Limit (LL) The value below the TV of each measured characteristic that defines the lower limit of acceptable production. (Table 3) Upper Quality Index (QU) QU = (UL - AVE)/s Lower Quality Index (QL) QL = (AVE - LL)/s Percentage of Lot Within UL Determined by entering Table 4 with QU. (PU) Percentage of Lot Within LL Determined by entering Table 4 with QL. (PL) Total Percentage of Lot (PL) PT = (PU + PL) - 100 Within UL and LL (PT) Incentive/Disincentive Determined by entering Table 1 with PT or PL. Values for AVE, s, QU, and QL will be calculated to a minimum two decimal place accuracy that will be carried through all further calculations. Rounding to lower accuracy is not allowed.
1.7 Laboratory Correlation
A.Perform the following to be eligible for dispute resolution:
1.Perform split-sample, paired t-testing with the Department based on project quality control testing using UDOT LQP qualified lab.
a.Perform split-sample, paired-t analysis on all mix acceptance tests related to volumetric properties and the following background testing: 1) Maximum Theoretical Specific Gravity of Mix (Gmm), AASHTO T 209 2) Bulk Specific Gravity of Mix (Gmb), AASHTO T 166 3) Bulk Specific Gravity of Coarse Aggregates (Gsb), AASHTO T 85
b.Continue until attaining successful paired t-test results, meeting α = 0.05, for a minimum of two consecutive production days (UDOT Materials Manual of Instruction, Part 8, Appendix C).
c.The engineer may require that all QC testing data be received before disclosure of the QA testing results. This applies to paired t-test and all subsequent QA/QC testing data.
B.Submit a detailed report showing tabular summaries of daily test data, paired t-testing calculations and any corrections made to account for failed comparisons.
C.Submit summary before submitting engineering analysis for dispute resolution.