B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Site Construction & Earthwork (02000-02999)

02225Asphalt Surfacing Removal (Structures)

UT · 2026 Standard Specifications✓ Full text on BuildSpecRev. September 12, 2024Book pages 266–267 Save this section

Ask about Section 02225

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

ASPHALT SURFACING REMOVAL (STRUCTURES)

PART 1 GENERAL

1.1SECTION INCLUDES

A.Removal of existing asphalt surfacing from bridge decks and approach

slabs.

1.2RELATED SECTIONS Not Used

1.3REFERENCES Not Used

1.4DEFINITIONS Not Used

1.5SUBMITTALS Not Used

PART 2 PRODUCTS

2.1REMOVAL EQUIPMENT

A.Use equipment capable of removing the full depth of asphalt on the deck

and the approach slabs without damaging the underlying concrete surfaces and bridge superstructure.

PART 3 EXECUTION

3.1ASPHALT SURFACING REMOVAL

A.Verify total asphalt depth before removal at the locations shown.
1.Notify Engineer of any discrepancies between depth measured and

the depth shown.

B.Remove asphalt to the top of the concrete surface as shown.
1.Rotomilling as part of the asphalt surfacing removal must meet the

following requirements:

a.Verify total asphalt depth in at least three locations along the

deck or as shown before rotomilling.

Asphalt Surfacing Removal (Structures)

b.At least 1 inch of asphalt must remain above the top of the

concrete surface after rotomilling and be removed using other methods.

c.Monitor during rotomilling to ensure concrete is not

encountered.

C.Remove existing waterproofing membrane from the deck and concrete

approach slabs.

D.Notify Engineer of damage to the deck or approach slab surface that

occurs during the removal.

E.Asphalt surfacing material removed becomes the property of the

Contractor, unless otherwise specified.

3.2PROTECTION

A.Prevent material and debris from falling into waterways, pedestrian areas,

traffic areas, or onto railroad tracks.

END OF SECTION

Asphalt Surfacing Removal (Structures)

Get an email when 02225 changes

Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 266–267 of 1,331. View official source ↗

Ask about this section

Scoped to Utah Standard Specifications, Section 02225 — Asphalt Surfacing Removal (Structures). Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.